Bids Are Invited For Supply Of Professional Grade 43 Inches Led Display - Supply Of Professional Grade 43 Inches Led Display Suitable For 24X7 Operation With Inbuilt System On Chip (Soc) Within Oem Of Monitor As Per Technical Specification Complete As Required. , Supply Of Professional Grade 55 Inches Led Display - Supply Of Professional Grade 55 Inches Led Display Suitable For 24X7 Operation With Inbuilt System On Chip (Soc) Within Oem Of Monitor As Per Technical Specification Complete As Required. , Supply Of Desktop Pc With Monitor And Accessories - Supply Of Desktop Pc With Monitor & Accessories As Per Technical Specification Complete As Required. , Supply Of Server Primary - Supply Of Server - Primary And Failover As Per Technical Specification Complete As Required. , Supply Of Server Fas Backup - Supply Of Server - Fas (Backup) As Per Technical Specification Complete As Required. , Supply Of Antivirus For Server And Desktop - Supply Of Antivirus For Server & Desktop For 6 Years. , Supply Of 24 Port Layer 3 Full Managed Poe Switch - Supply Of 24 Port Layer 3 Full Managed Poe Switch As Per Technical Specification Complete As Required. , Supply Of 24 Port Layer 2 Full Managed Poe Switch - Supply Of 24 Port Layer 2 Full Managed Poe Switch As Per Technical Specification Complete As Required. , Supply Of 8 Port Layer 2 Full Managed Poe Switch - Supply Of 8 Port Layer 2 Full Managed Poe Switch As Per Technical Specification Complete As Required. , Supply Of Sfp Small Form Factor Pluggable Transceiver - Supply Of Sfp Small Form-Factor Pluggable Transceiver Tripair As Per Technical Specification Complete As Required. , Supply Of 42U Network Rack Along With Pdu And Accessories - Supply Of 42U Network Rack Along With Pdu & Accessories As Per Technical Specification Complete As Required. , Supply Of 6U Wall Mount Network Rack With Accessory - Supply Of 6U Wall Mount Network Rack With Accessory As Per Technical Specification Complete As Required. , Supply Of 6 Core Outdoor Armoured Single Mode Os2 Type Outdoor Fibre Cable - Supply Of 6 Core Outdoor Armoured Single Mode Os2 Type Outdoor Fibre Cable As Per Technical Specification Complete As Required. , Supply Of Fiber Optic Liu 12 Port Loaded With Lc Adapter - Supply Of Fiber Optic Liu 12 Port Loaded With Lc Adapter As Per Technical Specification Complete As Required. , Supply Of Fiber Optic Liu 24 Port Loaded With Lc Adapter - Supply Of Fiber Optic Liu 24 Port Loaded With Lc Adapter As Per Technical Specification Complete As Required. , Supply Of Fiber Optic Liu 6 Port Loaded With Lc Adapter - Supply Of Fiber Optic Liu 6 Port Loaded With Lc Adapter As Per Technical Specification Complete As Required. , Supply Of Lc Lc Single Mode Duplex Fiber Patch Cords - Supply Of Lc-Lc Single Mode Duplex Fiber Patch Cords As Per Technical Specification Complete As Required. , Supply Of Cat6 4 Pair Unshielded Twisted Pair Cable Lszh For Indoor Purpose - Supply Of Cat6 4 Pair Unshielded Twisted Pair Cable - Lszh (Indoor Purpose) As Per Technical Specification Complete As Required. , Supply Of Cat6 24 Port Utp Patch Panel - Supply Of Cat6 24 Port Utp Patch Panel As Per Technical Specification Complete As Required. , Supply Of Cat6 Utp Patch Cord 1Mtr - Supply Of Cat6 Utp Patch Cord-1Mtr As Per Technical Specification Complete As Required. , Supply Of Cat6 Utp Patch Cord 2Mtr - Supply Of Cat6 Utp Patch Cord-2Mtr As Per Technical Specification Complete As Required. , Supply Of Cat6 Utp Patch Cord 5Mtr - Supply Of Cat6 Utp Patch Cord-5Mtr As Per Technical Specification Complete As Required. , Supply Of Cat6 Utp Information Outlet With Face Plate And Back Box - Supply Of Cat6 Utp Information Outlet With Face Plate And Back Box As Per Technical Specification Complete As Required. , Supply Of Kvm And Console - Supply Of Kvm & Console As Per Technical Specification Complete As Required. , Supply Of Ceiling Mount Brackets Or Frames For Led Display - Supply Of Ceiling Mount Brackets Or Frames For Led Display Complete As Required. , Supply Of 3 Core 2.5 Mm Electrical Cable , Supply Of 16 Amp Three Pin Shuttered Switch Socket Combined 3 In 1 With Cover Plate And Back Box - Supply Of 16 Amp Three Pin Shuttered Switch Socket Combined (3 In 1) With Cover Plate And Back Box Complete As Required. , Supply Of 25Mm Pvc Pipe With All Fixing Accessories - Supply Of 25Mm Pvc Pipe With All Fixing Accessories Complete As Required. , Supply Of 25Mm Pvc Flexible Pipe - Supply Of 25Mm Pvc Flexible Pipe Complete As Required. , Supply Of 25Amp Mcb With Db Box - Supply Of 25Amp Mcb With Db Box Complete As Required. , Supply Of Fids Software - Supply Of Fids Software Complete As Required. , Supply Of 01 No. 20 Kva Ups For Primary - Supply Of 01 No. 20 Kva Ups (Primary) Along With Healthy Stand Trolley As Per Technical Specification Complete As Required. , Supply Of 01 No. 20 Kva Ups For Backup - Supply Of 01 No. 20 Kva Ups (Backup) Along With Healthy Stand Trolley As Per Technical Specification Complete As Required. , Mounting, Fixing, Installation And Configuration Of 43 Inches Led Monitor With Inbuilt Soc On Suitable Ceiling Mount Brackets Or Frames Etc - Mounting, Fixing, Installation & Configuration Of 43 Inches Led Monitor With Inbuilt Soc On Suitable Ceiling Mount Brackets/Frames Etc. Complete As Required. , Mounting, Fixing, Installation And Configuration Of 55 Inches Led Monitor With Inbuilt Soc On Suitable Ceiling Mount Brackets Or Frames Etc - Mounting, Fixing, Installation & Configuration Of 55 Inches Led Monitor With Inbuilt Soc On Suitable Ceiling Mount Brackets/Frames Etc. Complete As Required. , Installation And Configuration Of Desktop Pc With Softwares At Site - Installation & Configuration Of Desktop Pc With Softwares At Site Complete As Required. , Installation And Configuration Of Server For Primary Pc With Softwares At Site - Installation & Configuration Of Server (Primary) Pc With Softwares At Site. , Installation And Configuration Of Server Fail Over For Backup Pc With Softwares At Site - Installation & Configuration Of Server - Fail Over (Backup) Pc With Softwares At Site. , Installation Of Antivirus For Server And Desktop - Installation Of Antivirus For Server & Desktop. , Mounting, Fixing, Installation And Configuration Of 24 Ports L2 Network Switches - Mounting, Fixing, Installation & Configuration Of 24 Ports L2 Network Switches Complete As Required. , Mounting, Fixing, Installation And Configuration Of 24 Ports L3 Network Switches - Mounting, Fixing, Installation & Configuration Of 24 Ports L3 Network Switches Complete As Required. , Mounting, Fixing, Installation And Configuration Of 8 Ports L2 Network Switches - Mounting, Fixing, Installation & Configuration Of 8 Ports L2 Network Switches Complete As Required. , Installation And Fixing Of Sfp - Installation & Fixing Of Sfp Complete As Required. , Mounting, Fixing And Dressing Of 42U Floor Stand Rack - Mounting, Fixing & Dressing Of 42U Floor Stand Rack Complete As Required. , Mounting, Fixing And Dressing Of 6U Wall Mount Rack - Mounting, Fixing & Dressing Of 6U Wall Mount Rack Complete As Required. , Digging, Consuling Etc. Of 6 Core Outdoor Armoured Single Mode Ofc Cable , Mounting, Fixing And Dressing Of Fibre Optic Liu 12 Port Loaded With Lc Adapter - Mounting, Fixing & Dressing Of Fibre Optic Liu 12 Port Loaded With Lc Adapter Complete As Required. , Mounting, Fixing And Dressing Of Fibre Optic Liu 24 Port Loaded With Lc Adapter - Mounting, Fixing & Dressing Of Fibre Optic Liu 24 Port Loaded With Lc Adapter Complete As Required. , Mounting, Fixing And Dressing Of Fibre Optic Liu 6 Port Loaded With Lc Adapter - Mounting, Fixing & Dressing Of Fibre Optic Liu 6 Port Loaded With Lc Adapter Complete As Required. , Termination And Fixing Of Lc Lc - Termination And Fixing Of Lc Lc Complete As Required. , Laying Of Cat6 Utp Through Pvc Pipe - Laying Of Cat6 Utp Through Pvc Pipe Complete As Required. , Mounting, Fixing And Installation Of 24 Port Patch Panel - Mounting, Fixing & Installation Of 24 Port Patch Panel Complete As Required. , Termination And Fixing Of 1 Mtr. Cat 6 Utp Information Outlet - Termination And Fixing Of 1 Mtr. Cat 6 Utp Information Outlet Complete As Required. , Termination And Fixing Of 2 Mtr. Cat 6 Utp Information Outlet - Termination And Fixing Of 2 Mtr. Cat 6 Utp Information Outlet Complete As Required. , Termination And Fixing Of 5 Mtr. Cat 6 Utp Information Outlet - Termination And Fixing Of 5 Mtr. Cat 6 Utp Information Outlet Complete As Required. , Installation Of Information Outlet As Per Technical Specification - Installation Of Information Outlet As Per Technical Specification Complete As Required. , Mounting And Installation Of Kvm And Console - Mounting & Installation Of Kvm & Console Complete As Required. , Laying Of 3 Core 2.5 Mm Electrical Cable Through Pvc Pipe - Laying Of 3 Core 2.5 Mm Electrical Cable Through Pvc Pipe Complete As Required. , Installation Of 16 Amp Three Pin Shuttered Switch Socket Combined 3 In 1 With Cover Plate And Back Box - Installation Of 16 Amp Three-Pin Shuttered Switch Socket Combined (3 In 1) With Cover Plate And Back Box Complete As Required. , Laying Or Fixing Of 25 Mm Pvc Pipes And Flexible Pipes On Or Above Of False Ceiling Or Fixing On Wall Including Fixing Of Suitable Saddle Or Screws Etc - Laying Or Fixing Of 25 Mm Pvc Pipes And Flexible Pipes On Or Above Of False Ceiling Or Fixing On Wall Including Fixing Of Suitable Saddle Or Screws Etc As Required As Per Site Conditions. , Installation Of 25Amp Mcb With Db Box - Installation Of 25Amp Mcb With Db Box Complete As Required. , Testing, Commissioning And Integration Of Fids Software - Testing, Commissioning & Integration Of Fids Software Complete As Required. , Installation, Testing And Commissioning Of 01 No. 20 Kva Ups For Primary - Installation, Testing & Commissioning Of 01 No. 20 Kva Ups (Primary) Complete As Required. , Installation, Testing And Commissioning Of 01 No. 20 Kva Ups For Backup - Installation, Testing & Commissioning Of 01 No. 20 Kva Ups (Backup) Complete As Required. , Testing, Commissioning ,Certification, Providing 3 Sets Of Completion Diagram And Documentation Of Entire Project Complete As Required - Testing, Commissioning ,Certification, Providing 3 Sets Of Completion Diagram & Documentation Of Entire Project Complete As Required. And Dismantling Of Existing Systems Without Intervening Operation Complete As Required. Total Quantity : 14500