| 1 | Name of the Work : Construction of 30000Ltr OHT (12M STAGING) With Extension of Pipeline at Inungur South Colony H/O Inungur |
| 2 | Earthwork excavating and depositing on bank with an initial lead of 10 metres and initial lift of 2 metres in hard stiff clay, black cotton, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc. |
| 3 | First depth of 2m |
| 4 | Second depth of 1m |
| 5 | Supply, Delivery and Filling withriver sand complying with standard specification including watering ramming and consolidation etc., complete and as directed by TWAD Board Officers-for foundation. |
| 6 | Levelling coarse in cement concrete 1:4:8 (one cement,four sand and eight aggregate) using 40mm hard broken stone andriver sand for foundation and leveling coarse including cost of all materials, mixing,placing, ramming, curing, finishing etc., complete and as directed by TWAD Board Officers. (Beyond 1.5 m to 4.5 m below GL) |
| 7 | Reinforced Cement Concrete using M30 Design mix with required cement, sand and20 mm and 10 mm Machine crushed HBGstonewithriver sand including the cost of all materials, labour charges, mixing by using mechanical mixer machine, placing in position, lifting, vibrating by using mechanical vibrator, finishing & curing but excluding the cost of reinforcement and fabricating, centering, shuttering and strutting charges etc., complete and as directed by TWAD Board Officers. |
| 8 | For items 1.5m to 4.5m below GL |
| 9 | For items 0 to 1.50m below GL |
| 10 | For items 0m to 4.5m above GL |
| 11 | For items 4.51m to 7.32m above GL |
| 12 | For items 7.32m to 10.98m above GL |
| 13 | For items above 10.98m & Upto 14.64m from GL |
| 14 | For items above 14.64m & Upto 18.30m from GL |
| 15 | Supplying and erecting steel centering for sides and soffits including necessary supports and shuttering to the required height for RCC items using MS sheets of suitable size of BG. 10 stiffence with welded MS angles of size 25mm x 25mm x3mm of boarding |
| 16 | Plane Surface |
| 17 | Below GL |
| 18 | 0 to 3.30m |
| 19 | 5.31 to 6.30m |
| 20 | 8.31 to 9.30m |
| 21 | 10.31 to 11.30m |
| 22 | 11.31 to 12.30m |
| 23 | 14.31 to 15.30m |
| 24 | Curved Surface |
| 25 | 11.30 to 12.30m |
| 26 | 12.30 to 13.30m |
| 27 | 13.30 to 14.30m |
| 28 | 14.30 to 15.30m |
| 29 | Square Column |
| 30 | Below GL |
| 31 | 0.00 to 3.30 m |
| 32 | 3.31 to 4.30m |
| 33 | 4.31 to 5.30m |
| 34 | 5.31 to 6.30m |
| 35 | 6.31 to 7.30m |
| 36 | 7.31 to 8.30m |
| 37 | 8.31 to 9.30m |
| 38 | 9.31 to 10.30m |
| 39 | 10.31 to 11.30 m |
| 40 | Applying two coats using approved Cement Paint including cost ofone coat of white washing, cost of all materials, labour charges, etc., complete and as directed by TWAD Board Officers. |
| 41 | Supplying, fabricating and placing in position of Steel Rods for reinforcement including cost of steel and binding wire and labour charges etc. complete for RCC works and as directed by TWAD Board Officers. |
| 42 | Providing and fixing of RCC inside access ladder in RCC 1:1.5:3 (One cement, one and half sand and three aggregates) using 20mm HBG stone including cost of reinforcement, placing grill in position, centering shuttering charges, mixing concrete curing etc. |
| 43 | Providing and fixing of RCC inner access ladder in RCC 1:1.5:3 (one cement, one and half sanel and three aggregates) using 20mm 9 HBG stone for OHT including cost 1 x 1 of reinforcement, placing grill in position, centering shuttering charges, mixing concrete cu |
| 44 | Supply, Delivery and fixing of CI Manhole frame with cover of following size including cost of all materials, fixing of MS clamps, Bolt and nuts etc.,complete and as directed by TWAD Board Officers. 0.60 x 0.60 (Heavy Duty) |
| 45 | Providing GI pipe connection arrangements for inlet, outlet scour and overflow etc. including cost of pipes, specials, valve, labour charge for lifting, aligning, cutting, threading, fixing and painting of GI pipes with two coats of approved quality ename |
| 46 | 65mm Ø GI pipes for inlet 1xl connection |
| 47 | 65mm Ø GI pipes for over flow |
| 48 | 50mm Ø GI pipes for scour pipe 1xl |
| 49 | 65mm Ø GM Gate valve |
| 50 | 50mm Ø GM gate valve |
| 51 | 65mm Ø GI Elbow |
| 52 | 50mm Ø GI Elbow |
| 53 | 65mm Ø GI coupler |
| 54 | 50mm Ø GI coupler |
| 55 | 65mm Ø GI union |
| 56 | Providing Extension of Pipeline From 30000 Ltr OHT to Inungur South Colony |
| 57 | Supply and delivery of GI and PVC specials materials etc., complete 10% |
| 58 | 65mm PVC TEE |
| 59 | 65mm PVC Bend |
| 60 | Solution |
| 61 | Thread |
| 62 | Supply and delivery of 63mm 4 KSC PVC Pipe with ISI Mark including all charges etc., complete |
| 63 | 65mm 4 KSC PVC Pipe |
| 64 | Earthwork excavating and depositing on bank with an initial lead of 10 metres and initial lift of 2 metres in hard stiff clay, black cotton, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders for foundation SS 20B as direct |
| 65 | Laying and jointing of PVC and GI pipe into the trench with proper garding and alignment and all labour charges etc., complete |
| 66 | Refilling the pipe line trench with excavated earth other than sand complying the standard specification etc., complete |
| 67 | GST Amount for providing Service to Government Contract Works for the above ConstructionWorks.GST Amount is the Total GST Amount for overall quoted amount above this row in column \"BB\" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) |