| 1 | Earthwork excavation in all kind of soil from the existing ground level, leveling, ramming as per requirement etc. with all leads and lift, disposing the excavated material within initial lead at locations as directed, with supply of all labour, materials, T&P, hire & running charges of all machineries, all taxes etc. all complete excluding GST and as per direction of Engineer-in-charge. |
| 2 | Supplying, mixing, transporting, laying in proper level & grade Cement Concrete 1:4:8 (1 Cement : 4 Coarse Sand : 8 hard granite metal of 40mm & below size Crusher Broken) for Plain Cement Concrete (PCC) including form works made of ply/ steel shutters, hoisting, laying over compacted surface, compacting by any approved means, finished smooth to the exposed surface to proper level & gradient, barricading the work site, curing etc. with supply of all materials, labour, T&P, all taxes, royalties,hire & running charges of all machineries, transportation charges, Port entry fees, cost of water, testing charges of materials, excluding GST etc. all complete as per direction of Engineer-in-charge. |
| 3 | Cement concrete (1:1.5:3) using 12mm to 20mm size C.B.G.chips for all floors, foundation & plinth etc. of approved quality mixing, hoisting, laying, compacting, curing with cost and supply of all materials, labour, T&P, taxes, tollage, royalties,port entry fees etc. all complete but excluding GST as directed by Engineer-in-charge. |
| 4 | Supplying, cutting, straightening, bending, binding, tying the grills hoisting and placing in position the reinforcement of Fe-500 steel confirming to I.S. specifications of any approved make with supply of binding wire 18 to 20 gauge as required for the work with supply of all labour, materials, T&P, all taxes, etc. excluding GST all complete including cost of reinforcement steel and as per direction of Engineer-in-chargeNB: (i) No wastage shall be paid.(ii) Steel coefficientshall be considered as per IS 1786 for payment purpose with bar bending schedule. |
| 5 | Providing rigid, smooth, leak proof good quality centering & shuttering with formworks made out of new ply / Steel shutters, providing openings on walls as per requirement, maintaining proper alignment etc. in both horizontal and vertical plane, chipping & coaltaring after each use of shuttering materials, dismantling the same after stripping off period including supply of all materials, labour, T&P, tollage, all transportation charges, royalties, all taxes, excluding GST, etcall complete as directed by the Engineer in charge. |
| 6 | For Foundation and Plinth |
| 7 | Wall |
| 8 | Back filling in foundation trenches by using the excavated material by the side of drain/ trench as per requirement within initial lead and lift, leveling, dressing, watering, compacting by any approved means with cost of all labour, T&P, transportation, hire and running charges of all equipments/ machineries, POL, all taxes etc all complete excluding GST as per direction of Engineer-in-Charge. |
| 9 | Providing and engaging Hydraulic excavator of 1cum. bucket capacity/ JCB on hour basisfor excavation / leveling and removing debris / earth and cleaning of the area where found necessary including engagement, hire and running charges of machineries,cost of driver, P.O.L., all taxes, port entry fees excluding GST etc. all complete as per direction of Engineer-in-charge.(No idle hours will be paid) |
| 10 | Engagement of tractor with trailer for transportation of debris and disposing them at designated area as directedwith all lead & lift etc complete including hire and running charges of machineries, cost of driver, P.O.L., all taxes, port entry fees excluding GST etc. all complete as per direction of Engineer-in-charge.(No idle hours will be paid) |
| 11 | Supply and engagement of Un-Skilled Labour for shifting of electric cable, conrete slab and placing the same at deginated cable trench or side by trench and where found necessarywith all safety measures to Workmen,hire charges of T&P, Port entry fees etc all completebut excludingGST and as per direction of Engineer-in-charge. |
| 12 | Dismantling of existing RCC structures by using mechanical jack hammer or any suitable method, cutting of reinforcement steel and disposing the same at designated place as directed, barricading the work site with supply of all labour, engagement, hire & running charges of all equipments, T&P, all taxes, Port entry fees, providing safety arrangements for workmen, cleaning the site, all transportation, excluding GST, etc. all complete as per direction of Engineer-in-charge. |