| 1 | EARTHWORK IN EXCAVATIONIN HARD SOIL ON BANK OF NALA UP TO 1.5 M. DEPTH |
| 2 | EARTHWORK IN EXCAVATIONOF NALA BELOW 1.5 M. DEPTH |
| 3 | REMOVAL OF SLUSH FROM BED OF NALA |
| 4 | EARTHWORK IN EXCAVATION IN WET SOIL IN FOUNDATION |
| 5 | EARTH WORK IN EXCAVATION FOR MAKING DIVERSION CHENNEL |
| 6 | MAKINGEARTHEN COFFER DAM INCLUDINGEXCAVATIONOF EARHTANDMAKING BUNDTO PREVENT THE STRUCTURE FROM WATER DURING CONSTRUCTION PERIOD |
| 7 | MAKING APPROCH ROAD FOR TRANSPORTATION OF MATERIAL UP TO SITE |
| 8 | DEWATERING BEFORE STARTING THE WORK AND DURING THE WORK |
| 9 | PLAIN CEMENT CONCRETEIN 1:3:6 CEMENT COURSE SAND AND 40mm STONE BALLAST IN FOUNDATION OF WING WALL CREST FLOORS CUT OFF WALL ETC. INCLUDING SUPPLY OF MATERIAL AND LABOUR T&P ETC.REQUIRED FOR PROPER COMPLETION OF THE WORK |
| 10 | RENDUMRUBBLE/ KHANDAMASONARY WITH 1:4 CEMENT COURSE SAND MORTAR UP TO BED LEVEL WITH 20X20X20 SIZE KHANDA IN WING WALLS ,CREST WALL , PROTECTION WALLSINCLUDING SUPPLY OF ALL MATERIAL ,LABOUR AND T&P REQUIRED FOR PROPER COMPLETION OF WORK |
| 11 | RENDUMRUBBLE/ KHANDAMASONARY IN SUPER STRUCURE WITH 1:4 CEMENT COURSE SAND MORTARWITH 20X20X20 TO 25X25X25 SIZE KHANDA IN WING WALLS ,CREST WALL , PROTECTION WALLSINCLUDING SUPPLY OF ALL MATERIAL ,LABOUR AND T&P REQUIRED FOR PROPER COMPLETION OF WORK |
| 12 | CEMENT CONCRETE WORK IN 1:2:4 WITH CEMENT COURSE SAND AND20 MM STONE BALLAST OVERSURFACEOF FLOOR WING WALL AND CREST WALLINCLUDING COST OF MATERIAL ,LABOUR AND T&P ETC. |
| 13 | 15 MM THICK PLASTER IN1:3 CEMENT AND COURSE SAND MORTAR ON SURFACE OF UP STREAM SIDE CREST WALL,WING WALL,AND EXTENSION WALL INCLUDING SUPPLY OF ALL MATERIAL LABOUR AND T&PETC. |
| 14 | FLUSH/RAISED POINTING WITH 1:2 CEMENT AND COURSE SAND MORTAR ON SURFACE OFWING WALL CREST WALLSLOPPY WALL ETC. INCLUDING SUPPLY OF ALL MATERIAL , LABOURAND T&P |
| 15 | COURSED RUBBLE STONE MASONARY ON SLOPPY SIDES IN 1:4 CEMENT COURSE SAND AND KHANDA/SPLIT /CUT STONE INCLUDING SUPPLY OF MATERIAL ,LABOUR AND T&P ETC. |
| 16 | DRY STONE PITCHING /FILLING IN LAUNCHING APRONINCLUDING SUPPLY OF MATERIAL ,LABOUR AND T&P |
| 17 | DISMENTELING/REMOVING EARTHEN COFFER DAM AFTER COMPLETING CONSTRUCTIONWORK OF CHECK DAM |
| 18 | FILLING OF DIVERSION CHENNEL (NOTE:-SIZE OF DIVERSION CHENNEL IS INCREASED DUE TO SOIL EROSEN DURING CONTINEUE FLOWING OF WATER FROM DIVERSION CHENNEL |
| 19 | PHOTOGRAPHYBEFORESTARTING THE WORK AT SITE ,TIME TO TIME DURING CONSTRUTION WORK AND AFTER COMLETION OF WORK |
| 20 | FIXING OF M.S. SIGN BOARDAT WORK SITEWITH PAINTINGAND WRITING INFORMATION ABOUTCHECK DAM, |