|
| 1 | A)Material/Erection ofNew - 1Phase LT Line at Kulthi |
| 2 | Prov AAAC 7/3.15mm² Conductor (50mm²) {Includes Cutting and wastage} |
| 3 | Prov. Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) |
| 4 | Prov Muffs with concerete filling |
| 5 | Prov Full Pole Clamps (M.S. Flat 50X6 mm) |
| 6 | Prov.Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16mm Φ or more (with flat and spring washers)] |
| 7 | Prov.Aluminium Paint |
| 8 | Prov.Spiral PVC Spacer |
| 9 | Erection charges complete in all respect |
| 10 | Transportation charges complete in all respect |
| 11 | Material/Erectionof shifting3 - Phase LT Line at Kandi road |
| 12 | Prov.AAAC 7/3.15mm² Conductor (50mm²) {Includes 4 conductor lengths for 3Φ & Neutraland Additional 1% (Sag, Jumpering and wastage} |
| 13 | Prov.Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) |
| 14 | Prov.Muffs with concerete filling (2000 mm) |
| 15 | Prov Full Pole Clamps (M.S. Flat 50X6 mm) |
| 16 | Prov Nuts and Bolts of Various Sizeswith flat and spring washers |
| 17 | Prov.Aluminium Paint |
| 18 | Transportation charges complete in all respect |
| 19 | Dismantalment charges of.AAAC 7/3.15mm² Conductor (50mm²) complete in all respect |
| 20 | Erection Charges of ST pole 9 Mtrs Long complete in all respect |
| 21 | Erection Charges of LTStay set complete in all respect |
| 22 | Laying stunging & Saging AAAC 7/3.15mm² Conductor (50mm²) complete in all respect |
| 23 | Material/Erection of shifting 3 - Phase LT Line at Janyankar |
| 24 | Prov.AAAC 7/3.15mm² Conductor (50mm²) {Includes 3conductor lengths for 3Φ & Neutraland Additional 1% (Sag, Jumpering and wastage} |
| 25 | Prov. 9Mtr. Long Steel tublar pole |
| 26 | Prov. RCC Muff of 2000mm length |
| 27 | Prov Full Pole Clamps (M.S. Flat 50X6 mm) |
| 28 | Prov.Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16mm Φ or more (with flat and spring washers)] |
| 29 | Prov. Aluminiun paint |
| 30 | Transportation charges complete in all respect |
| 31 | Dismantalment charges of.AAAC 7/3.15mm² Conductor (50mm²) complete in all respect |
| 32 | Erection Charges of ST pole 9 Mtrs Long complete in all respect |
| 33 | Erection Charges of LTStay set complete in all respect |
| 34 | Laying stunging & Saging AAAC 7/3.15mm² Conductor (50mm²) complete in all respect |