| 1 | Dismantling of Cut Stone as per S.O.R. 2020 Chapt18 D, S l. No. 4(b) Page 49 |
| 2 | Earth Work in cutting or in embankment in ordinary soil excavation to be the form of regular pits not exceeding 1/2 meter (20\") distance as directed by the E/I.as per si.no. 253 |
| 3 | Disposal of extra exvated(westage) earth up to 8.00 km.of distance from site i/c all. |
| 4 | Relaying of dismantled stone chauka i/c all as per S.I.No.762 b(Labour only) |
| 5 | Excavation in foundation in ordinary soil (Loam clay or sand) includind lift up to 1.5 m. and lead up to 30 m.and includingetc.complete. same as per SI.No.251. |
| 6 | Concrete with 4 cm.gauge brick ballast,sand of 1.25 F.M.and cement in proportion of 12:6:1 in foundation and under floors including supply of all material laborT& P etc.required for proper completion for the work.as per S.I no. 273- |
| 7 | Providing and laying 250 mm.Dia NP-3, R.C.C. Hume Pipe including collar/ spigot jointed with stiff mixture of cement in proportion of 1:2 cement and fine sand including testing of joint. |
| 8 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheeled roller complete as per T.S. clause 401. |
| 9 | Providing and laying of Rubber moulded Interlocking concrete block pavement havingthickness 80 mm including leveling and dressing of surface To required level and slope spreading and moisting 30 m.m thick local sand on bend filling joints with local sand etc. for proper complition of work as per drawing and T.S. clause 1504 |
| 10 | HenceFor Red Colour - |
| 11 | Hence For Grey Colour - |
| 12 | M-150 Brick Work in 1:4 Cement and sand of 1.25 F.M.morter in Foundation and plinth including S/O all material labour T&P.etc.required for proper completion of work..same as perS.I.No.305. |
| 13 | 12 mm.thick plaster with cement morter in proportion of 1:4 cement and sand of 1.25 F.M.over brick work minimum thickness not to be less than 10 m.m.includings/o all materials labour andT&P.required for proper completion of the work.as per SI.No.584 |
| 14 | Construction of K.C. drain with precast of C.C. Blocks size (400x325 mm) laid in flat position (37.5mm in length) & kerb stone (300mm in length)including cost of Base Concrete in 1:6:12 cement sand & O.B.B Including cost of all material labour T&P etc,proper complition of work |
| 15 | Painting or varnishing new iron work in small area with one coat (upto one sq.m) of ready mixed priming paint and one coat of approved superior quality ready mix paint of clear synthetic varnish i/c s/o materials labour and T& P etc. required for proper completion of work. Paint to be used should confirm to the ISINo.103 1950.As per S.I.No.(641+642) |
| 16 | S/F OF 110 mm dia pvc pipe ISI Mark for drainage work |
| 17 | SFRC Medium Duity Manhole coverSize (600x600x750 mm.) i/c all |
| 18 | SFRC Medium Duty Gully Pit coverSize (300x300x500 mm.) i/c all |
| 19 | Supply and Fixing Of imformatory sign board |