| 1 | Part A |
| 2 | Opening & fitting of 2 nos service gate, all damaged part, bolt nut, old rubber seal, cutting by gas cutter, lifting of gate on crust including cost of trained mechanical person and helper as required T&P with cost of oxygen and DA gas cylinder ,diesel gen. set and transportation charges and halting at site etc. complete (As per market rate) excluding of GST |
| 3 | Providing and making casting C.I. roller including cost of casting, turning, boring and collar making as required. (220x220x25)/4000000/115=34.78x6 no. |
| 4 | Providing, casting and making G.M. bush for roller including cost of casting, turning, bearing and collar making as required. (Dia 60x60x25)/4000000x120=2.70x6 no. |
| 5 | Providing and making S.S. pin for roller including cost of turning, and collar making as required.Dia 70x240x29.20kg./Mtr.=7.008x6no.+10%cutting/wastage(Dia 60x60x25)/4000000x120=2.70x6 no. |
| 6 | Providing,casting and making guide shoe including, turning, boaring sharpening, drilling as required. 1 no. 20.00 kg.x4 no.=80.00 kgs.(Dia 60x60x25)/4000000x120=2.70x6 no. |
| 7 | Providing of rubber seal including cost of seal flate and countre sunk screw as required. (1800x2=3.00)+(2500x2=5.0)= 8.60 mtr.(Dia 60x60x25)/4000000x120=2.70x6 no. |
| 8 | Providing of bolt nut and washer off size. (Dia 60x60x25)/4000000x120=2.70x6 no. |
| 9 | Providing, casting and making C.I. wire rope pulley including cost of casting, boring, groove cutting as required.275x275x25)/4000000x100=47.26x4 no.(Dia 60x60x25)/4000000x120=2.70x6 no. |
| 10 | ADD GST 18% PART A |
| 11 | Part-B-Repair & mantenance of Emergency gate of URC 1 nos gate size (1500x1500) mm |
| 12 | Opening & fitting of 2 nos emgergency gate, all damaged part, bolt nut, old rubber seal, cutting by gas cutter, lifting of gate on crust including cost of trained mechanical person and helper as required T&P with cost of oxygen and DA gas cylinder ,diesel gen. set and transportation charges and halting at site etc. complete (As per market rate) |
| 13 | Providing and making casting C.I. roller including cost of casting, turning, boring and collar making as required.(220x220x25)/4000000/115=34.78x6 no. |
| 14 | Providing, casting and making G.M. bush for roller including cost of casting, turning, bearing and collar making as required.2.50x6 no. |
| 15 | Providing and making S.S. pin for roller including cost of turning, and collar making as required. Dia 70x240x29.20kg./Mtr.=7.00x6no. |
| 16 | Providing,casting and making guide shoe including, turning, boaring sharpening, drilling as required.1 no. 20.00 kg.x4 no.=80.00 kgs. |
| 17 | Providing of rubber seal including cost of seal flate and countre sunk screw as required. (1800x2=3.60)+(2500x2=5.0)= 8.60 mtr. |
| 18 | Head stock worm and wheel type complete set suitable for 63 mm dia model ww-90 two ton capacity wt. approximate 322 kg. each |
| 19 | Providing of screw shaft 63 mm dia including cost of turning, threading and seal making 4.00 mtr. Long. |
| 20 | Providing, casting and making G.M. nut for shaft 63 mm dia including cost of casting, turning, boring threading and collar making. |
| 21 | Providing of bolt nut and washer off size. |
| 22 | ADD GST 18% PART B |
| 23 | Part-C:- Maintenance and painting work of head regulator steel structurework in head regulator of URC at Rajghat |
| 24 | Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete |
| 25 | 20 mm cement plaster finished with a floating coat of neat cement of mix :1:3 (1 cement: 3 fine sand) (As per DSR item no-13.9.2) |
| 26 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. |
| 27 | Painting with synthetic enamel paint of approved brandand manufacture to give an even shade : Two or more coats on new work |
| 28 | Painting on old rusted steel surface of gates and appurtenances after prepearation of surface properly by sand blasting process and applying two coat of zinc rich primer and two coat solvent less epoxy paint including cost of all material labour T&P and scaffolding required for proper completion of work . as per IDUP Mechanical SOR [email protected] per sqm.(including gst rate = 1232+221.76=1453.76) |
| 29 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete Providing and fixing bolts including nuts and washers complete.as per CPWD SORItem no 10.20 @ 159.35 / kg |