| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (Not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5mtr. including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth is to be levelled and neatly dressed in: All kinds of soil80% + Ordinary rock 20% |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering , all works upto plinth level( 1 : 4 : 8)1 cement 4 coasre sand 8 stone aggregate grade , with 40mm nominal size . crushed |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering , all works upto plinth level( 1 : 3 : 6)1 cement 3 coasre sand 6 stone aggregate grade , with 20mm nominal size . crushed 20% boulders |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering , all works upto plinth level( 1 : 1.5 : 3 )1 cement 1.5 coasre sand 3 stone aggregate grade , with 20mm nominal size . crushed |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with5.3.1 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 6 | Reinforcement of RCC work in plinth band incl straightening, cutting, bending , placing in position and binding all complete. |
| 7 | Brick work with common burnt clay F.P.S (Non-modular) brick of class designation 75 in foundation and plinth in 1:6(1 cement : 6coarse sand) |
| 8 | Extra for brick work in Super structure above plinth level upto floor V level (By manual means) |
| 9 | Centering and shittering including strutting propping etc and removal of form workFoundation footingbases of columns etc |
| 10 | Centering and shuttering incl. struting, proping ,etc.and removal of form work for; lintel beam ,plinth beam ,girders,bressumers andcantilevers Plinth beam |
| 11 | Centering and shuttering incl. struting, proping ,etc.and removal of form work for edges of slab under 20 cm |
| 12 | Centering and shuttering incl. struting, proping ,etc.and removal of form work for suspended floors,roofing ,landings,balconies and access platform |
| 13 | Steel work welded in built up section, trusses andframed works including cutting , hoising, fixing in position and applying a priming coat of approved steel primer all completeDoors amd windows welded (40 x40 x 6 ) mm |
| 14 | 15 mm cement plaster on the rough side of single or half brick wall of mix 1:6 ( 1 cement 6fine sand ) |
| 15 | 12 mm cement plaster 0n wall of mix 1:6 ( 1 cement 6 fine sand ) |
| 16 | 6mmmm cement plaster to ceilingof mix 1:3 (1cement 3 sand ) |
| 17 | Providing and fixing paneled or glazed shutters for doors and windows and clestory windowsusing 10 kg /sqm (4mm thick) float glass panes including ISI marked black enameled M.S. butt hinges bright finished of requried size with necessary screws,( 35mm thick of 2nd class deodar wood). |
| 18 | Providing & laying vitreified floor tiles in different size ( thichness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS 15622 of approved make in all colours and shades laid on 20 mm thick cement mortar 1:4 ( 1cement : 4 coarse sand) including grouting the joints with white cement and matching pigments etc. ( size of tile 60 x 60 cm) |
| 19 | Providingandfixing35mmthickwiregauzeshuttersusinggalvanised M.S.wire gauze of average widthforaperture1.4 mminbothdirectoin with wire of dia.0.63 mmfordoors,windowsandclerestorywindowswith hinges andnecessary screws: Second class deodar wood. |
| 20 | Applying priming coat with ready mixed pink or grey primer of approved brand and manufactures on wood work (hard and soft wood) |
| 21 | Painting of doors and windows with ready mixed synthetic enamel paint of approved brand and manufacturers in all shades (two or more coats) on new work |
| 22 | Destempering with oil bound washable distemper on new work ( two or more coats including priming coat with water thinnable cement primer. |
| 23 | Finishing walls with acrylic smooh exterior paint of required on new work (2 or more coats) inlcuidng primer [email protected] kg / 10sqm |
| 24 | Making plinth protection 50mm thick with cement concrete ( 1 : 3 : 6) 1 cement : 3 Coarse sand: 6 stone aggregate)20 mm nominal size f stone aggregate over 75 mm bed of dry brick ballast , 40 mm nominal size of well rammed and consolidated and grouted with fine sand including finishing the top smooth. |
| 25 | Providing and fixing lSI marked oxidised M.S. sliding door bolts with nuts and screws etc. complete |
| 26 | Providing and Fxing aluminium tower bolt ISI marked anodized (anodic coating not less than grade AC as per IS 1868)transparent or dyed to required colouur or shade with necessary screws etc. complete |
| 27 | Providing and Fxing aluminium tower bolt ISI marked anodized (anodic coating not less than grade AC as per IS 1868)transparent or dyed to required colouur or shade with necessary screws etc. complete |
| 28 | Providing and Fxing aluminium handleISI marked anodized (anodic coating not less than grade AC as per IS 1868)transparent or dyed to required colouur or shade with necessary screws etc. complete 100 mm |
| 29 | Filling available excavated earth(excluding rock) in trenches ,plinth,sudes of foundation etc.Layers not exceeding 20 cm in depth,conslidating each deposited layer by ramming and watering lead upto 50m and lift upto 1.5m. |
| 30 | Providing and Fxing aluminium handleISI marked anodized (anodic coating not less than grade AC as per IS 1868)transparent or dyed to required colouur or shade with necessary screws etc. complete 125mm |
| 31 | Carriage 0f materialby mechanical transportincluding loading ,unloading and stacking completed sand lead up to 65 km av. and manual labour 100mtr |
| 32 | Carriage 0f materialby mechanical transportincluding loading ,unloading and stacking completed stone agg below 40 mm.lead up to 30 kmav. and manual labour 100mtr |
| 33 | Carriage 0f materialby mechanical transportincluding loading ,unloading and stacking competed Bricks lead up to 85 km av. and manual labour 100mtr |
| 34 | electric wiring with 1.5 sqm copper cable including 20 mm dia 2 mm thick wire sunken box and connection to be main polecomplete as direction by engineer -charge |