Thanjavur District Construction Of Dramastage At Samathuvapuram In Aladikumulai Panchayat Pattukkottai Block Thanjavur District Under Mlacds 2025 26 Thanjavur District Construction Of Dramastage At Samathuvapuram In Aladikumulai Panchayat Pattukkottai Block Thanjavur District Under Mlacds 2025 26 , Construction Of Dramastage @ Samathuvapuram In Aladikumulai Panchayat. Mlacds 2025-26 , Earth Work Excavation In All Class Of Soil Except Hard Rock Requiring Blastingwith Intial Lead And Lift Etc. Complete For Foundation As Per Ss 20A , Sand Filling With Good River Sand Including Cost And Conveyance Of All Materials And All Labour Charges For Etc Completed. , Cement Concrete 1 : 4 :8 Mix Using 40Mm Hbg Metal For Foundation Including Watering Wherever Necessary And Laid In Layers Of Not More Than 15Cm Thick., Compacting Etc., Complete Complying With Standard Specifications And As Directed For Base Course Below Wearing Course To Street. , Cement Concrete 1:1.5:3 Using 20Mm Iss Hbg Metal For All Rcc Item Of Works Excluding Cost Of Rein Forcement And Fabricating Charges, Centering And Shuttering But Including Curing And Providing Fixtures Like Fan Clamps In The Rcc Floor Or Roof Slabs Wherever Necessary And Bearing Surfaces Of Walls , Sides And Bottom Of The Slabs, Beams Etc., Shall Be Finished Smooth With Cement Mortar 1:3, 12Mm Thick. And With Kraft Paper Without Claiming Extra As Directed By The Departmental Officers Complete Complying With Standard Specifications. , Brick Work In Cm 1:5 Mix Using Country Bricks Of Size 83/4X41/4X2 1/4 Including Cost And Conveyance And Labour Charges Etc., For Upto Basement Level. , Below Basement , Abovebasement , Supplying & Erecting Centering For Sides & Soffiots Including Necessary Supports & Strutting Upto 3.29M Height For Plane Surfaces In All Floors With All Cross Bracings Using Mild Steel Sheets Of Size 90 X 60Cm & 10 Gauge Stiffened, Complete Complying With Standard Specifications And As Directed By The Departmental Officers. Rate For 10M2.For The Following Items.(Rcc Floor Slab, Roof Slab, Rectangular/ Square, Tee/ Ell Beams, Lintels, Staircase Waist Slabs, Landing Slabs, Landing Beam, Portico Beam Etc., ). , Column , Sunshade&Loft, Lintel Beam And Roof Slab , Plastering In Cm(1:3) 10Mm Thick Including Cost And Conveyance Of All Charges Etc. Complete , Providing Granolithic Flooring With Cc 1:2:4, Using 10-12 Mm Chips, 25 Mm Tk, Including Cost And Conveyance Of All Materials To Site And All Labour Charges For Mixing, Laying And Curing Etc Compete. , Plastering In Cm 1:5, 12 Mm Tk, Including Cost And Conveyance Of All Materials To Site And All Labour Charges For Mixing, Laying And Curing Etc Compete. , Supply And Fabrication And Placing In Position Of Steel Rods Including Cost And Conveyance Of All Materials Labour Charges Etc., Complete , Cost And Supply Of Steel Doors Including Cost And Conveyance Of All Materials And Labour Charges Etc., Complete Door , Cost And Supply Of Steel Windowsincluding Cost And Conveyance Of All Materials And Labour Charges Etc., Complete Glassed Window , White Washing Two Coats With Shell Lime Including Cost And Conveyance Of All Materials And Labour Charges Etc., Complete , Exterior Emulsion Two Coats With Approved Colour And Quality Including Costand Conveyance Of All Materials And Labour Charges Etc., Complete , Painting Two Coats With Approved Synthertic Enamel Paint Overnew Iron Work Including Cost And Conveyance Of All Materials And Labour Charges Etc., Complete , Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package}