| 1 | Item No.1 Excavation foundation for pipe trenches in earth, soils of all types, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, manual dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. MJP SSR 2023-24 P.No. 37 Iteam no. 1 |
| 2 | Item No.2 Excavation foundation trenches Murrum removing excavated for pipe /in Hard including the material upto a distance of 50 M beyond the area and lifts as below, stacking as directed Engineer-in-charge, by normal dewatering, preparing the bed for |
| 3 | Item No.3 Excavation foundation for pipe /trenches in soft rock and old cement and lime masonry foundation asphalt road including removing the excavated material upto a distance of 50 M beyond the area and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A4/259) Iteam no. 5 |
| 4 | Item No.4 Providing and laying in situ 1:2:4 (M-150) Grade of c.c. of trap/granite/ quartzite/gneiss/ metal for foundation and bedding including dewatering, formwork, compaction, and curing, finishing Etc. complete. With initial lead of 1.50 M below / above G.L.as per MJP/ SSR/ 2023-24 /Section G Plain, reinforced and ready mix concrete /Item No.1 (b)/ Page no.47 |
| 5 | Item No. 5 Providing second class Burnt Brick masonry with conventional/I.S. type bricks in cement mortar 1:6 in plinth as backing in composite masonry including bailing out water manually, striking joints, raking out joints and watering etc Complete.Spec.No. :Bd.G.3 Page No.314. PWD SSR. 2022-23 I.No.27.03 P. No. 197 |
| 6 | Item No.6 Providing internal cement plaster 12mm thick in single coat in cement mortar 1:4 without neeru finish to concrete or brick surfaces, positions in all including scaffolding and curing etc. complete. Spec. No. Bd. L.2 Page No. 368 PWD S.S.R. 2022-23 I.No. 32.04 P.No. 209 |
| 7 | Item No.7 Providing and supplying in standard lengths ISI mark rigid unplasticised PVC pipes suitable for potable water with solvent cement joints including cost of couplers, as per IS specification no. 4985 /1988 including all local and central taxes, transportation, freight charges, inspection charges, loading, unloading, conveyance to the departmental stores / site and stacking the same in closed shed duly protected from sun rays and rains including cost of jointing material i.e. solvemt cement, etc. complete (selffit type to be jointed with cement solvent). Working Pressure 6 Kg./Sq.cm. MJP SSR 2023-24 Iteam 110 MM PVC 6kg/cm2 PIPE MJP SSR 2023-24 Iteam no. b (iv) pg. no. 74 |
| 8 | Item No.8 PVC TEE (As per Market Rate) |
| 9 | Item No.9 Providing and laying in situ Cement Concrete of trap/ granite /quartzite / gneiss metal for RCC work in foundation like raft, grillage, strip foundation and footing of RCC columns and steel stanchions including normal dewatering, form work, compaction, finishing and curing, etc. complete. (By weigh batching and mix design for M250 and M-300 only. Use of L&T, A.C.C., Ambuja, Birla Gold, Manikgad, Rajashrco, etc. cement is permitted.) (Excluding M.S. or Tor reinforcement) MJP/SSR/2023-24 / Section G Plain, reinforced and ready mix concrete /Item No.2/Page no.47 |
| 10 | Item No.10 Providing and fixing in position steel bar reinforcement of various diameters for RCC piles, caps, footings, foundations, slabs, beams, columns, canopies, staircases, newels, chajjas, lintels, pardies, copings, fins, arches, etc. as per detailed designs, drawings and schedules; including cutting, bending, hooking the bars, binding with wires or 7 tack welding and supporting as required, etc. complete (including cost of binding wire). (Bd-F-17/306) MJP/SSR/2023-24 / Section G Plain, reinforced and ready mix concrete / Item No.8/ Page no.50 |
| 11 | Unit Quantity |
| 12 | Providing and supplying in standard lengths ISI mark rigid unplasticised PVC pipes suitable for potable water with solvent cement joints including cost of couplers, as per IS specification no. 4985/1988 including all local and central taxes, transportation, freight charges, inspection charges, loading, unloading, conveyance to the departmental stores / site and stacking the same in closed shed duly protected from sun rays and rains including cost of jointing material i.e. solvemt cement, etc. complete (selffit type to be jointed with cement solvent). Working Pressure 4 Kg./Sq.cm. MJP SSR 2023-24 I. No1 (a) ii |
| 13 | Consultancy Charges 5.00% |
| 14 | Third party Inspection Charges0.50% |
| 15 | GST 18% charges |