| 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary |
| 2 | Laying 150 mm. to 200 mm. boulder soling including rough dressing hand packing and ramming down small pieces in the interstics without rolling but including ramming. |
| 3 | Cost of Boulder |
| 4 | (I) Cement concrete with graded stone ballast (40 mm size) excluding shuttering.In ground floor. |
| 5 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. |
| 6 | Plum concrete work with 40 % cement concrete with 30 mm down gradedstone metal and 60 % stone boulder of size 150 mm and above, placed inposition as directed excluding shuttering if any. |
| 7 | Hire and labour charge for shuttering with centreing and necessary staging up to 4 m. using approved stout props and thick hard wood planks of approved thick ness with required bracing for concrete slabs, beams, columns, lintels curved or staight including fitting fixing and striking out after complection of works. (up to roof of ground floor). |
| 8 | Plaster ( to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering conrners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (ground floor). [Excluding cost of chipping over concrete surface]. |
| 9 | Neat cement punning about 1.5mm thick in wall, dado, windowsill, floor etc.NOTE:Cement 0.152 cu.m per100 sq.m. |
| 10 | Reinforcement for reinforced concrete work in all sorts of structure including distribution bars, stirrups, binders, stirrups,binders etc. including supply of rods initial straightening and removal of loose rust,cutting to requisite length hooking and binding to correct shape placing in proper position and binding with 16 gauge black anelled wire. |
| 11 | Supplying, fitting and fixing G.I. pipes of TATA make with all necessary accessories, specials viz. socket, bend, tee, union, cross, elbo, nipple, longscrew, reducing socket, reducing tee, short piece etc. fitted with holder bats clamps, including cutting pipes, making threads, fitting, fixing etc. complete in all respect including cost of all necessary fittings as required,jointing materials and two coats of painting with approved paint in any position above ground. (Payment will be made on the centre line measurements of total pipe line including all specials. No separate payment will be made for accesories, specials. Payment for painting will be made seperately) (c)(ii) 25 mm dia. medium quality |
| 12 | Labour for fitting and fixing high density poly-ethylenepipes or P.V.C. pipes for above ground work including costs of jointing materials, paints etc.fitting and fixing all necessary specials, cutting pipes, making threads, cutting holes in walls of R.C. floor where necessary and mending goods all damages excluding the cost of masonry or concrete work, if necessary ,but including the cost and fitting and fixing holder bat clamps(any floor) or for underground work including cutting trenches upto 1.5 metre and refilling the same complete as per direction of the Engineer-in-charge.(Payment will be made on center line measurment of the total pipeline including specials.) .Above Ground . |
| 13 | Supply of High Density Poly-ethylene Pipe conforming to IS-4984-1985 (Dia)[PE-63].10 Kg/Sq/Cm.(Dia) Working Presssure). |
| 14 | Square or hexagonal mesh netting made with 18 B.W.G. galvanised wire, fitted and fixed complete as per design(excluding the supporting framework but including local sal wood battens of size 37.5mmx25mm). In ground floor.. |
| 15 | Add GST 18% |
| 16 | Add Cess 1% |