|
| 1 | Supplying & fixing of exhaust fan 300 mm sweep, with 900 rpm, 230V, 50Hz,including making openings on walls and properly fastening with fastners and GI strips , i/cmakingconnection, testing, commissioning, sealing the leaks for preventing entry of rain water, etc. as required. ( MakeHavells or SS) |
| 2 | Supplying and fixingLED type 4 ft light fitting of20 Watt, 230V, 50HZ,including making all electrical connections with suitable size PVC insulated copper conductor wire etc. as required (M/s Crompton/Havells or SS make) |
| 3 | Pdg & fixing of 20 watt LED Post top lantern i/c connection, as reqd. |
| 4 | Supplyingof ceiling fan 1200 mm sweep, suitable for 230V, 50 HZ, ac supply and installation, testing and commissioning ofthe same includingdisconnecting all electrical connections and dismantling the existing fan, connectionsetc. as required (Make M/s Havells/Anchor or SS make) |
| 5 | Pdg & fixing of 50 watt LED Street light luminaires with polycarbonate cover and driver including arm brackets, i/c connection, as reqd. |
| 6 | Supplying of PVC insulated and sheathed armoured 2 core 1.5 sq.mm copper conductor 1.1 KV grade cable and laying the same on surface or in recess as reqd.(BSNL approved make). |
| 7 | Supplying and fixing loop box with SP MCB10A B series, including connections etc as required |
| 8 | S/F of 5 A paino switch on existing switch board including connection complete as reqd. |
| 9 | S/F of 5Apiano type 3 pin socket on existing switch board including connection complete as reqd. |
| 10 | Supplying & fixing of stepped type fan regulator in the existing Switch board, i/c connection complete as reqd. |
| 11 | General servicing & cleaning of1.5 /3.0TR TR split Air Conditioner (both indoor and outdoor) by removing all dirt and dust from the fins, and cleaning the fins/tubes with cleaning solution, combing the fins, Cleaning drainage i/c replacing the missing fasteners, lugs,connectors, ferrules, flare nuts 1/4 and 5/8 inches, checking & tightening the connections, complete as required |
| 12 | Supplying and fixing the following spares in the existing AC units including dismantling the faulty one, fixing, connections with existing wires etc as required. a) Outdoor motor fan blade for 3.0 TR ductable AC Unit. |
| 13 | Supplying &Charging refrigerent in existing AC unit as per manufacturer recommendations complete as required |
| 14 | Servicing of 62.5 KVA M/s Kirloskar make Engine (4R810TA G1) thoroughly by replacing B-Check Kit such as oil filter-1 no, fuel filter (Pri & Sec)-1 set, supplying and filling 15W40 lub oil-13 Ltr, Coolant, after dismantling & flushing the sump, checking of alignment and adjustment of different components like valve, tappet, fuel line system, hose clips wherever required, including S/F of missing hardware such as nuts & bolts, washers, spring washers etc, if any, testing with exchange load and commissioning complete as reqd. (K-Oil/Castrol or similar superior make) |