|
| 1 | Checking of all existing rivets, screws and re-fixing the same with new rivets and screws with use of leak proof compound where ever required. It includes cost of removal of defective rivets, screws, cost of new rivets, screws and there replacing by new rivets / screws whenever and wherever report without any extra cost / charges. It includes cost of material, labour or other inputs required for the work. |
| 2 | 12 feet long boat (including Paddle Boat) |
| 3 | 15 feet long boat |
| 4 | 18 feet long boat |
| 5 | 20 feet long boat |
| 6 | 25 feet long boat |
| 7 | 27 feet long boat |
| 8 | Complete painting of bottom and upper floors of boats with water proof rubber paint including cost of paint, labour and other inputs involved for the work including preparation of surface etc. complete. |
| 9 | 12 feet long boat (including Paddle Boat) |
| 10 | 15 feet long boat |
| 11 | 18 feet long boat |
| 12 | 20 feet long boat |
| 13 | 25 feet long boat |
| 14 | 27 feet long Boat |
| 15 | Fixing of wooden head on the nose end of the boat by removing of rivets from aluminium sheet changing the wooden packing by replacing new packing, making hole in aluminium sheet new wooden packing and wooden head for inserting bolts and nuts of length 6\" to 8\" as per requirement for holding wooden head in its position, including making good the aluminium boat by moulding the aluminium sheet to its original position and riveting etc. complete including cost of materials, labour and other incidental inputs involved for carrying out this work. |
| 16 | 20 feet long boat |
| 17 | 25/27 feet long boat |
| 18 | Painting whole body of boats by aluminium paint including cost of aluminium paint and labour etc. involved for the work. |
| 19 | 12 feet long boat(including Paddle Boat) |
| 20 | 15 feet long boat |
| 21 | 18 feet long boat |
| 22 | 20 feet long boat |
| 23 | 25/27 feet long boat |
| 24 | Lettering the name of department with enamel paint on the outer surface of boats including cost of enamel paint, labour and other incidental charges complete. |
| 25 | 12 feet long boat(including Paddle Boat) |
| 26 | 15 feet long boat |
| 27 | 18 feet long boat |
| 28 | 20 feet long boat |
| 29 | 25/27 feet long boat |
| 30 | Removing of old damaged Salwood Gutka and providing new Salwood Gutka with nut bots and washer complete. Scope includes cost of material, labour and other incidental charges complete. |
| 31 | 12 feet long boat(including Paddle Boat) |
| 32 | 15 feet long boat |
| 33 | 18 feet long boat |
| 34 | 20 feet long boat |
| 35 | 25/27 feet long boat |
| 36 | Replacing damaged aluminium gola on the bottom side of the boats including cost of inner side wood and top side aluminium sheet, labour and other inputs involved in the execution of work. |
| 37 | 18 feet long boat |
| 38 | 20 feet long boat |
| 39 | 25/27 feet long boat |
| 40 | Repair of all seat and replacing the broken damaged seat wherever required. It is includes cost of material, labour and all other inputs required for the work. |
| 41 | 12 feet long boat(including Paddle Boat) |
| 42 | 15 feet long boat |
| 43 | 18 feet long boat |
| 44 | 20 feet long boat |
| 45 | 25/27 feet long boat |
| 46 | Removing of damaged boat handles and fixing new boat handles, with nuts bolts and washer complete and changing of wooden cleats wherever required including making holes in the handles casted including cost of all material and labour complete. |
| 47 | OBM transom repair with aluminium sheet and wood including cost of labour, material and other incidental charges involved in the work. |
| 48 | Repair of buoyancy system of boats (system enables the boat to float at water level in case of drowning) by replacing the old thermacol sheet fixed underneath the seats of boat by new water proofing foam by opening the seats after removing the aluminium sheet and transforming it to its original shape after changing the damaged thermacol including changing the water proof ply of seats as required with cost of labour and material involved in completion of work etc. complete. |
| 49 | 12 feet long boat(including Paddle Boat) |
| 50 | 15 feet long boat |
| 51 | 18 feet long boat |
| 52 | 20 feet long boat |
| 53 | 25/27 feet long boat |
| 54 | Replacing 2.5\" width and 1\" thick sal wood gola on the bottom side of the boats including cost of sal wood gola, labour and other inputs involved in the execution of work. |
| 55 | 12 feet long boat(including Paddle Boat) |
| 56 | 15 feet long boat |
| 57 | 18 feet long boat |
| 58 | 20 feet long boat |
| 59 | 25/27 feet long boat |
| 60 | Repair of border of the boat by removing of damaged aluminium sheet and wooden batten and fixing of new wooden batten and aluminium sheet with steel screws and nails including cost of materials labour and other incidental charges complete. |
| 61 | 12 feet long boat(including Paddle Boat) |
| 62 | 15 feet long boat |
| 63 | 18 feet long boat |
| 64 | 20 feet long boat |
| 65 | 25/27 feet long boat |
| 66 | Providing and fixing Tochen Hook |
| 67 | Painting with ready mixed paint of approved brand and manufacture in all shades. |
| 68 | Small size trolley |
| 69 | Big size trolley |
| 70 | Lettering of following words with enamel paint on each boat trolley \"DM (EAST) REVENUE DEPARTMENT”. The size of words/alphabets shall be decided by In-Charge, according to location of writing place and space available. |
| 71 | Providing and fixing new tyre tube sets 6x16 of MRF make in trolley. |
| 72 | Providing and fixing new wheel rim for small size trolley |
| 73 | Providing and fixing roller with bearings. |
| 74 | Wheel overhauling including changing of bearing, repairing of hub, change of nut bolts complete. |
| 75 | Providing and fixing wooden levelling plate with rubber top fitted with screw in boat carriage trolley including cost of material labour charges and all other incidental charges etc. complete. |
| 76 | Providing and fixing new pipe rollers with nuts and bolts and angles welded in position including cost of material, labour charges etc. complete. |
| 77 | Opening erecting and refitting of Kamanies in position including change of pins, greasing etc. complete, it includes cost of dismembering / repairing and reassembling, cost of labour charges and other incidental charges etc. complete. |
| 78 | Repair/Servicing Charges of Motor Boat Engine of 25 HP including all kind of necessary spare parts, servicing, and materials used, to and fro cartage for repairing in work shop, labour charges, taxes etc. complete in all terms. |
| 79 | Repair/Servicing Charges of Motor Boat Engine of 30 HP including all kind of necessary spare parts, servicing, and materials used, to and fro cartage for repairing in work shop, labour charges, taxes etc. complete in all terms. |
| 80 | Repair/Servicing Charges of Motor Boat Engine of 40 HP including all kind of necessary spare parts, servicing, and materials used, to and fro cartage for repairing in work shop, labour charges, taxes etc. complete in all terms. |
| 81 | Repair/Servicing Charges of Motor Boat Engine of 50 HP including all kind of necessary spare parts, servicing, and materials used, to and fro cartage for repairing in work shop, labour charges, taxes etc. complete in all terms. |