| 1 | Dismantling Interlocking tiles including stacking of dismantled materials as directed by engineer in charge as per SI No 698 and Transpoted lead 5 km etc work complete. |
| 2 | Dismantling cc slab at drain including stacking of dismantled materials as directed by engineer in charge as per SI Noand Transpoted lead 5 kmdisposal from working site etc work complete as per DSR No-15.2.1 |
| 3 | Construction of embankment with approved material obtained from borrow pits with a lift uptogranular sub-1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table-300.1 and 300.2 with a lead upto 8 km as per Technical Specification ofas per DSR No-2.25(a) |
| 4 | Excavation in foundation in ordinary soil (loam,clay or sand) including lift upto 1.50 M. and lead upto 30 M. and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or plinth from the foundation trenches as per DSR No-2.6.1. |
| 5 | Plain Cement Concrete with 4 cm gauge approved stone ballast, coarse sand & cement in the proprtion of 8:4:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work including all type of taxes, octroi, tolls, cess but excluding cost of GST and as per direction ofENC as per DSR No-4.1.8 |
| 6 | M-150 class Brick Work in 1:4 cement & Coarse sand2.20 F.M. mortar in foundation and upto plinth level including supply of all materials, labour and T&P etc. requried for proper completion of the work as per DSR Ch-6 & 6.2.1 |
| 7 | Plain Cement Concrete with 4 cm gauge approved stone ballast, coarse sand & cement in the proprtion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work including all type of taxes, octroi, tolls, cess but excluding cost of GST and as per direction ofENC as per DSR No-4.1.3 |
| 8 | 12 mm thick plaster with cement and fine sand of 1.25 fineness modules mortar in 1:3overbrick work minimum thickness not to be less than 1cm. including supply of all materials, labour, tools & plants etc. required for proper completion of the work as per DSR No 13.4.1.. |
| 9 | Reinforcement cement concrete (1:1.5:3) in open foundation & Tie beam complete as per drawing and Technical Specifications RCC Grade M-20 with Reinforcement including all type oftaxes, octroi, tolls, cess but excluding cost of GST and as per direction of ENC as per DSR No 5.2.2. |
| 10 | Supplying, fitting and placing with MS bar reinforcement (Fe 415) in substructure complete as per drawings and Technical Specification Clause 1002, 1005, 1010 & 1202 including bending for proper and necessary completion of the work and including supply of steel and wastages, bends, hook and authorised overlapping shall be measured as per direction of Engineer-in-Charge.as per Kutation. |
| 11 | M.S.in Heavy Sizes including of all work in Copmlete pipe and angle size 50X50X6mm (4.5Kg per mtr.) etc Complete Work as per DSR No-10.25.2. |
| 12 | Providing wall putty on new surface with approved qualitymaterial of Berger/J.K./Birla orsimilar make 2 coats.as per DSR No-13.80. |
| 13 | Finishingwallwithwaterproofcementpaintof approved make and quality on new wood with two coat to give an even shade including supply of all materials, labour,Tools&plantetc.requiredfor proper completion of the work.as per DSR No-13.44 |
| 14 | Paintingroofsorotherironworkinlarge areas with two or more coat of approved (above one Sq. Metre) paint (British antesolorequivalent)includingsupplyofall materials, labour, Tools & for proper completion of the work. Paint to be plants etc. required used should confirm the ISI no. 103-109. as per DSR No-13.48.1 |
| 15 | SupplyandfixingGalvanizedcorrugatediron roofingin positionincluding supply of all materials,labour,Tools&plantsetc.Required for proper completion of the work and including wastage.as per Kutation. |
| 16 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density etc Complete as per technical specifications. |
| 17 | Construction of un-reinforced, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grde cement, mixed in a concrete mixer, using approved mix design , laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, including levelling the formwork as per drawing), curing of concrete for 14-days &work as per DSR No-11098.45 etc Complete |
| 18 | Providing & Fixing of fancy lighting with pole and kable wireing ,fan, wire with pvc pipe etc complete work as per Kutation. |
| 19 | Providing & Laying of Painting etc complete work as per Kutation. |
| 20 | Providing & Fixing of plantation with gumle & Plant with transportation for beautiful etc complete work as per Kutation. |
| 21 | Supply and Fixing Sign Board Complete work etc. |
| 22 | Add GST @ 18% |