Tender For Dense Forestaion Through Miyawaki Method At Jalkal Office Under Zone-4. - Cleaning jungal includinguprooting of rankVetgetation groos bush wood trees and Saplings of girth up to 30cm meaured at a hight of 1meter above ground level and removel of rubbish etc. 2 Disposal of surplus earth/malwa upto 5.00 km distance including loading/unloading of material with all charge complete. 3 Earth work in Excavation in trenches for foundations pipes cables etc in ordinary soil (loan clay or sand) including lift up to 1.5 mtr lead up to 50 mtr and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the Engineer-in charge with in a distance of 50 mtr. 4 For water Retention material (Leaf Compost/sugar cane stalk/other retantion material) with cartage, loading, unloading andall complete of the work. 5 Perforation Material (Rice Husk) with cartage, loading, unloading andall complete of the work. 6 Nourishment material (Farm yard manure) with cartage, loading, unloading andall complete of the work. 7 Mulching Material (Rice Straw) with cartage, loading, unloading andall complete of the work. 8 Soil Microbiology Enhancer 1 (Jeevamrit) with cartage, loading, unloading andall complete of the work. 9 Soil Microbiology Enhancer 2 (Ghan Jeevamrit) with cartage, loading, unloading andall complete of the work. 10 Marking Powder with cartage, loading, unloading andall complete of the work. 11 Unskilled manpower (with required tools and workwear as forest creation for Site cleaning, nursery set up, area preparation- sapling stocking and material stocking areas, pruning de-weeding etc) 12 Supply of Plants (Maulshri, Peepal, Bargad, Ficus, Semal, Aonla, Shahtut, Laung, Amaltas, Gulab Desi, Thevita, Cycus, Lili White, Paras Pipal, Thuja compacta, Bottlebrush, Calendra, Champa, Parijat, Pilkhan, Gular, Bamboo, Ashok, Arjun, Chitwan, Palash, Kadam, Sisam, Sagaun, Sakhu, Tulsi, Mehndi, Shatawar, Sarpgandha, Giloy, Ashwagandha, etc.) 13 Plants Transportation casuality (10%) 14 C.P. 5% on Item No - 12+13 15 Vehicle for transportaion (Tractor with Tipper Trolly) 16 Supply and fixing of support stricks (18-20cm peripheri, 90cm height) 17 Manpower (for mixing Material & Plantation including local transportation) 18 Instalation of 1.5 Hp Submersible Pump 19 Supply of rain Gun 20 Maintenance of Plants upto One Year incuding irrigation by air gun, Howing, weeding andreparing of stack etc. all complecte of the work as per I/C. & guid line of Miyawaki methode. 21 Guard for Chauckidari (12 Hour shift) 22 Mulching process two time in a year of total planting area. 23 GST 18%