| 1 | Earth work in excavation of foundation in ordinary soil with initial lead of 50m and initial lift of 1.50m including dressing and leveling the bed and depositing the excavated earth within initial lead of 50m and shoring, shuttering, dewatering etc. including labour cess etc. complete as per the direction of the Engineer-in-charge. |
| 2 | Filling foundation and plinth with sand with well watered and rammed including cost, carriage, royalty of sand, cess and all taxes etc. complete as directed by the Engineer-in-charge. |
| 3 | Providing and laying cement concrete M-15 with 20 mm size down graded black hard granite (crusher broken) stone chips free from weathered skin and other deleterious materials including hoisting and laying concrete curing for required days including all labour, cost, conveyance and royalty and all taxes of all materials etc. complete as directed by Engineer-in-charge. |
| 4 | Supplying cutting bending binding and placing in position uncoated HYSD bar reinforcement complete as per drawing and technical specification including all labours, cost, conveyance, labour cess and all taxes of MS rod and binding wire etc. complete as directed by Engineer-in-charge. |
| 5 | Rigid and smooth centering and shuttering for R.C.C works including false works and dismantling them after casting including cost of materials, labour css etc. complete as per direction of Engineer-in-charge. |
| 6 | RCC Foundation, Plinth band and footing base of columns, mass concrete. |
| 7 | Brick work with fly ash bricks 25 cm x 12 cm x 8 cm having crushing strength not less than 75 Kg/cm2 with dimension tolerance ±8 percent in cement mortar (1:6) in superstructure including curing, etc. with all cost, conveyance, royalty, labour, T&P, etc. complete including labour cess as per the direction of the Engineer-in-Charge. |
| 8 | Super Structure |
| 9 | 12mm thick cement plaster (1:6) finished smooth to inside/outside smooth surface of brick walls after racking out joints including watering and curing with the cost and conveyance of all materials and labour with T&P required for the work with all taxes and royalties etc. complete as per direction of Engineer-in-Charge. |
| 10 | Supplying, drving & fixing \"Z\" type sheet pile including hire & running charges of driving machine and all labour charges with inter locking sheet piles including cost, conveyance and loading & unloading sheet pile to work site including welding where ever required to form a water tight cut of including T&P etc. complete as per direction of Engineer-incharge |
| 11 | Clearing shrub jungles, uprooting stumps and small bushes and trees below 1.00m girth etc. including clear of work site including all labour etc. complete including labour cess as per direction of the Engineer-in-Charge. |
| 12 | Quarrying, collecting and supplying hard granite stone boulders of 15cm to 30cm in size, free from weathered skin surface and other deleterious materials dry packing for slope protection works in river embankments including surface packing in all heights and depths including filling the interstices with small stones, wedging and hammering etc. including cost, conveyance, royalty, labour cess, taxes and transportation of all materials of approved quality with uniform colour and texture from approved quarry with all leads, lifts, delifts etc. and all other incidental charges with quality control tests required to complete the work as per specification and direction of the Engineer-in-Charge. |
| 13 | Quarrying, collecting and supplying hard granite stone boulders of at least 0.028m3 in volume, free from weathered skin surface and other deleterious materials for slope protection works in river embankments by stone dumping and providing rock toe, rip rap, spurs etc. and surface packing in all heights and depths to proper line and level including filling the interstices with small stones, wedging and hammering etc. including cost, conveyance, royalty, labour cess, taxes and transportation of all materials of approved quality with uniform colour and texture from approved quarry with all leads, lifts, delifts etc. and all other incidental charges with quality control tests required to complete the work as per specification and direction of the Engineer-in-Charge. |