Supply Of Materials For Construction Of Sante Katte At Sonna Village In Sonna Gram Panchayath - Sonnagp-Lumpsum Of Materials,Sonnagp-Add Brush At 1% On Cost Of Paint,Sonnagp-Enamel Metal Paint,Sonnagp-Add Handling , Loading And Unloading At 2% On Material,Sonnagp-Add Wire Brush, Fine Steel Wool, Putty, Sand Paper, At 3% On Cost Of Paint,Sonnagp-Ready Mix Primer Paint (Ready Mix Red Lead Paint),Sonnagp-Add Hom Of Welding And Grinding Machine 4% On Material,Sonnagp-Welder Grade I,Sonnagp-Fitter Class I,Sonnagp-Ms Flat,Sonnagp-M.S Rods,Sonnagp-Red Oxide,Sonnagp-Broken Granite Metal 10 Mm,Sonnagp-Broken Granite Metal 12.5 Mm,Sonnagp-Plate Vibrator Having 3 Ton Compaction Force,Sonnagp-Cobble Stones Of 60 Mm Thick,Sonnagp-Add Gum / Gangiwater / Fevical And Blue At 10% Of Lime Cost,Sonnagp-Burnt Lime/Shell Lime,Sonnagp-Add Brush, Putty, Sand Paper, Roller At 5% On Cost Of Paint,Sonnagp-Plastic Emulsion Paint,Sonnagp-Painter Class I,Sonnagp-Add Brush, Putty, Glue At 5% On Cost Of Paint,Sonnagp-Whitening,Sonnagp-Dry Distemper,Sonnagp-Add Providing And Removing Scaffolding At 3% On Labour,Sonnagp-Binding Wire,Sonnagp-Tmt Bars Fe 500,Sonnagp-Hom Of Vibrator 0.71 Days,Sonnagp-Plasticizer / Super Plasticizer,Sonnagp-Burnt Bricks Class 35 (Non Modular),Sonnagp-Brick,Sonnagp-Add Watering Charges At 1 % On Labour,Sonnagp-Water Tanker,Sonnagp-Generator 33 Kva,Sonnagp-Water,Sonnagp-Add Handling , Loading And Unloading At 1% On Material,Sonnagp-Casurina Poles 100 - 150 Mm,Sonnagp-Stone Chistler Class Ii,Sonnagp-Mason Class Ii (With Tools),Sonnagp-Mason Class I (With Tools),Sonnagp-Mixer (Concrete Small Used In Culvert),Sonnagp-Boulders,Sonnagp-Bond Stone 20 X 20 X 45 Cm,Sonnagp-Size Stone 20 X 20 X 25 Cms,Sonnagp-Add Watering Charges At 1 % On Material,Sonnagp-Mixer (Concrete) - 1 Cum Capacity,Sonnagp-Portland Cement,Sonnagp-Coarse Sand (Zone Iii),Sonnagp-Broken Stone Aggregate 12 Mm To 10 Mm Size,Sonnagp-Broken Stone Aggregate 20 Mm Size,Sonnagp-Broken Stone Aggregate 40 Mm Size