}

Tender For Consultancy Services For Authority Engineer For Supervision Of 1. Const. Of Flyover From Kali Bagichi Chouraha To Rbm Hospital Via Bijlighar Chouraha In Bharatpur City, 2. Const. Of Flyover From Heeradas Chouraha To Kumher Gate Chouraha In Bhar, bharatpur-Rajasthan

Public Works Department has published Tender For Consultancy Services For Authority Engineer For Supervision Of 1. Const. Of Flyover From Kali Bagichi Chouraha To Rbm Hospital Via Bijlighar Chouraha In Bharatpur City, 2. Const. Of Flyover From Heeradas Chouraha To Kumher Gate Chouraha In Bhar. Submission Date for this Tender is 02-07-2025. Consultancy Service Tenders in bharatpur Rajasthan. Bidders can get complete Tender details and download the document.




Tender Notice

49643675
Tender For Consultancy Services For Authority Engineer For Supervision Of 1. Const. Of Flyover From Kali Bagichi Chouraha To Rbm Hospital Via Bijlighar Chouraha In Bharatpur City, 2. Const. Of Flyover From Heeradas Chouraha To Kumher Gate Chouraha In Bhar
Tender
Indian
Rajasthan
Bharatpur
02-07-2025

Tender Documents

Tender Details

Tender For Consultancy Services For Authority Engineer For Supervision Of 1. Const. Of Flyover From Kali Bagichi Chouraha To Rbm Hospital Via Bijlighar Chouraha In Bharatpur City, 2. Const. Of Flyover From Heeradas Chouraha To Kumher Gate Chouraha In Bharatpur City, Bpr On Epc Basis - CONSULTANCYSERVICESFOR AUTHORITYENGINEERFOR SUPERVISIONOF:1. Construction of Flyover from Kali Bagichi Chouraha to RBM Hospital via Bijlighar Chouraha in Bharatpur City, Bharatpur ON EPC BASIS 2. Construction of Flyover from Heeradas Chouraha to Kumher Gate Chouraha in Bharatpur City, Bharatpur ON EPC BASIS Sl. No. Item Description 1 A : Key Personnel 2 Team Leader Cum Senior Bridge Engineer (1 No.)Man -Month in Construction period of 24 months and man month in maintenance / defect liablty period of 06 months Total( 24 + 06 = 30 Months) 3 Senior Bridge Design engineer 01 No. man month in construction periodof 06 months 4 Senior Quality Cum Material Expert 01 No Man -Month in Construction period of 24 months and man month in maintenance / defect liablty period of 01 months Total( 24 + 01 = 25 Months) 5 Road SafetyExpert 01 No Man -Month in Construction period of 06 months and man month in maintenance / defect liablty period of 01 months Total( 06 + 01 = 07 Months) 6 B : Sub Professional Staff 7 AssistantBridge Engineer (2 Nos.) Man -Month in Construction period of 24 months and man month in maintenance / defect liablty period of 06 months Total( 24 + 06 = 30 Months) 8 Assistant Highway Engineer (02 Nos)Man -Month in Construction period of 06 months and man month in maintenance / defect liablty period of 01 months Total( 06 + 01 = 07 Months) 9 Assistant Survey Engineer ( 02 No)Man -Month in Construction period of 24 months and man month in maintenance / defect liablty period of 01 months Total( 24 + 01 = 25 Months) 10 Assistant QualityEngineer ( 02 No) Man -Month in Construction period of 24 months and man month in maintenance / defect liablty period of 01 months Total( 24 + 01 = 25 Months) 11 Assistant Quality Cum MaterialEngineer ( 02 No) Man -Month in Construction period of 24 months and man month in maintenance / defect liablty period of 0 months Total( 24 + 0 = 24 Months) 12 CADD Expert( 01 No)Man -Month in Construction period of 24 months and man month in maintenance / defect liablty period of 0.00 months Total( 24 + 0 = 24 Months) 13 Electrical Engineer( 02 No)Man -Month in Construction period of 06 months and man month in maintenance / defect liablty period of 1.0 months Total( 06 + 01 = 07 Months) 14 C : Support Staff 15 Computer Operator(1 Nos.) Man -Month in Construction period of 24 months and man month in maintenance / defect liablty period of 06 months Total( 24 + 06 = 30 Months) 16 Office Boy(01 Nos) Man -Month in Construction period of 24 months and man month in maintenance / defect liablty period of 06 months Total( 24 + 06 = 30 Months) 17 Watch Man( 01 No) Man -Month in Construction period of 24 months and man month in maintenance / defect liablty period of 06 months Total( 24 + 06 = 30 Months) 18 D : Transportation (Fixed rate on rental basis) The vehicles provided by the Consultants shall include the cost for rental ,drivers,operation,maintenance,repairs,insurance,etc.For all complete approx.3000 km /month run 19 Swift Dzireor equivalent (not more than 3 year old ) 02nos for AE and 01 required for PWD) Man -Month in Construction period of 24 months and man month in maintenance / defect liablty period of 06 months Total( 24 + 06 = 30 Months) 20 E : Duty Travel to site (Fixed costs) : Both Project 21 Professional and Sub-Professional Staff The employer may require the Key Personnel to visit the Employer’s Site/CE office. The quoted amount should include travel fare for all trips to Employer’s Head Office and as and when require to Employer’s regional office (including Hotel charges, travel costs etc. Completed)Man -Month in Construction period of 24 months and man month in maintenance / defect liablty period of 06 months Total( 24 + 06 = 30 Months) 22 F : Office Rent (Fixed Costs) 23 Minimum 1750 sq ft. area of office shall be rented by the consultant/Authority engineer (for employer) There cost includes electricity and water charges, AC,office furniture, maintenance, cleaning, repairs, etc. complete. Man -Month in Construction period of 24 months and man month in maintenance / defect liablty period of 06 months Total( 24 + 06 = 30 Months) 24 G : Office Supplies,Utilities and Communication (Fixed Costs) 25 Office Supplie(01 Nos) . Man -Month in Construction period of 24 months and man month in maintenance / defect liablty period of 06 months Total( 24 + 06 = 30 Months) 26 Computer Running with set up (05 Nos) .Man -Month in Construction period of 24 months and man month in maintenance / defect liablty period of 06 months Total( 24 + 06 = 30 Months) 27 H :Reports and Document Printing 28 Monthly Reports(01 Copies) .Man -Month in Construction period of 24 months and man month in maintenance / defect liablty period of 06 months Total( 24 + 06 = 30 Months) With 06 Sets 30 No @ 6 = 180 Nos 29 Quarterly Reports ( 01 copies ) No. of reports 10 of Copies per report 06 Total 10 No @ 6 = 60 Nos 30 Variousothers reports as required in reference to EPC Agreement ( 01 copies ) No. of reports 08 no@ 6 = 48 Nos 31 Consultancy service Tax (GST) Payble inIndia (GST In Figures To be entered by the Bidder Rs.)

Key Value

Document Fees
INR 5000 /-
EMD
INR 1000000.0 /-
Tender Value
INR 5 Crore /-

Attachment

FileName File Description File Size
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail