Annual Maintenance Of Bore Well Motor Pumps,Starter Panel Board And Supply Of Specials For Water Supply Section In Sandur Tmc Limits For Fy-2024-25 - Earthing Providing And Fixing And Wiring Earth Electrode For Grounding Circuits Ic Cutouts And Other Equipments On The Meter Board In The Pit. The Pits Should Be Filled Up With Equal Proportion Of Salt And Charcoal 150Mm Around The Pipe To Complete Depth. The Connection From The Pipe To The Conduits Etc. Is To Established Through Gi Wire Of Sizes As Per Clause 7.3.3 Of Is 732 Using 12Mm Bolts, Nuts, Washers And Check Nuts, The Pipe Shall Have 16 Through Holes Of 12Mm Dia,Providing And Fixing Suitable For 1.1 Kv Class Ug Cable Filled With Necessary Bitumen Or Insulating Compound Complete With Terminals, Clamps,Bolts,Nuts And Washers Etc. With Necessary Materials And Labour Tools And Equipments As Per Instructions Of Engineer Incharge Of Work. 3.5X25 Sqm,Providing And Fixing Suitable For 1.1 Kv Class Ug Cable Filled With Necessary Bitumen Or Insulating Compound Complete With Terminals, Clamps,Bolts,Nuts And Washers Etc. With Necessary Materials And Labour Tools And Equipments As Per Instructions Of Engineer Incharge Of Work. 3.5X10 Sqm,Providing Main Connection From Pole Pvc Insulated Sheathed Steel Wire Cable In Gi Pipe As Per Is 1554/ 1988 With Latest Amendments With Isi Mark From Kptcl Pole To Meter Board Unit.,Providing Main Connection From Pole Pvc Insulated Sheathed Steel Wire Cable In New Trench As Per Is 1554/ 1988 With Latest Amendments With Isi Mark From Kptcl Pole To Meter Board Unit.,Labour Charges For Providing Connection Using Insulated Sheathed Steel Wire Cable As Per Is 1554/ 1988 With Latest Amendments From Kptcl Pole To Meter Board Unit, With All Necessary Materials ,Tools And Equipments,As Per Specificationswith Testing Of As Per Instructions Of Engineer Incharge Of Work. 3 X 10 Sqmm (Suitable For Over Head Mains),Labour Charges For Providing Connection Using Insulated Sheathed Steel Wire Cable As Per Is 1554/ 1988 With Latest Amendments From Kptcl Pole To Meter Board Unit, With All Necessary Materials ,Tools And Equipments,As Per Specificationswith Testing Of As Per Instructions Of Engineer Incharge Of Work. 3.5 X 10 Sqmm,Labour Charges For Providing Connection Using Insulated Sheathed Steel Wire Cable As Per Is 1554/ 1988 With Latest Amendments From Kptcl Pole To Meter Board Unit, With All Necessary Materials ,Tools And Equipments,As Per Specifications With Testing Of As Per Instructions Of Engineer Incharge Of Work 3.5 X 6 Sqmm,Labour Charges For Erection Of Outdoor Type Panel Board And Meter Board Units With All Necessary Materials And Labour, Tools And Equipments Including Providing Cement Concrete Foundation Bed Etc., Complete As Per Specification, With Testing Of As Per Instructions Of Engineer Incharge Of Work.,Labour Charges For Erection Of Indoor Type Panel Board And Meter Board Units With All Necessary Materials And Labour Tools And Equipments Including Cement Concrete For Foundation/Bed Etc,Complete As Per Specification, With Testing Of As Per Instructions Of Engineer Incharge Of Work.,Labour Charges For Erection, Electrification And Commissioning Of Pump Sets, Including Aligning And Balancing Of All Items Including Supply And Erection Of Two Pair Of Supporting Clamps, Bore Well Caps, Cable Clips And Water Tight Gland Cable Protectors, Bolts, Nuts, Valve And Gauges,Tools And Equipments Etc., Involved In The Job As Per Specifications, With Necessary Tests As Per Specifications, With Testing Of As Per Instructions Of Engineer Incharge Of Work.,Supply And Delivery At Site Stringing Of Heavy Duty Naylone/Pp Rope With Isi Etc Complete Suitable For Single Phase Pumpsets.,Supply And Delivery At Site Accessories For Single Phase Pumpset Like Ss Groove Nipples,Ss Studs & Nuts,Screw Clips &Water Proof Insulation Tape Etc Complete With Isi Mark,Supply And Delivery At Site 50Mm(2Inch) Dia Heavy Duty Ci Adopter Set Complete Suitable For Upvc Column Pipes For Submersible Pumpsets,Supply And Delivery At Site 50Mm(2Inch) Dia Heavy Duty Unplasticized Pvc Column Pipes With Heavy Duty Collars,Rubber Profile Ring,Vibration Control Profile Ring,Freezing And Turbulence Free Leak Proof Epdm Ring With Isi Mark With Its Latest Amendments,Supply And Delivery Of Galvanized Mild Steel Tubes Of 6Mtr Standard Length Heavy Duty (C Class) As Per Is 1239 (Part-I) 1990 With Latest Amendments With Isi Mark (One End Fitted With Heavy Duty Collar And Other End Fitted With Protective Cover) 50 Mm,Supply And Delivery At Site Delivery Of Best Indigenous Brand New Mcb (Miniature Circuit Breakers) Of Required Capacity As Per Is 88228/1978 And Its Latest Amendments And With Isi Mark Of 6/10/16/20/25/40 Amps With Scalable Box.,Supply And Delivery At Site Best Indigenous Brand New Power Capacitor As Per Is 2834/1986 With Latest Amendments With Kptcl Authorities And Erection, Electrification And Commissioning Of The Same At The Location Of Respective Pump Sets.,Supply, Installing,Testing And Commissioning Common Control Panel Outdoor Type 6 To 15 Hp Pumps,Supply, Installing,Testing And Commissioning Common Control Panel Outdoor Type 3 To 6 Hp Pumps,Supply, Installing,Testing And Commissioning Common Control Panel Outdoor Type Upto 3 Hp Pumps,Supply, Installing,Testing And Commissioning Common Control Panel Indoor Type 6 To 15 Hp Pumps,Supply, Installing,Testing And Commissioning Common Control Panel Indoor Type 3 To 6 Hp Pumps,Supply, Installing,Testing And Commissioning Common Control Panel Indoor Type Upto 3 Hp Pumps,Supply And Delivery At Site Of Brand New Best Make Non-Return Valve As Per Is 778/1984 With Isi Mark And As Per Its Latest Amendments Size 50 Mm,Supply And Delivery At Site Of Brand New Best Make Gate Valve As Per Is 778/1984 With Isi Mark And As Per Its Latest Amendments Size 50 Mm,Supply And Delivery At Site Brand New Best Make Pvc Insulated Cable Of Flat 3 Core (Sheathed) Of Nominal Cross Sectional Area As Per Is 694-1990 With Isi Mark And As Per Its Latest Amendments. 1X3x4 Sqm,Supply And Delivery At Site Brand New Best Make Pvc Insulated Cable Of Flat 3 Core (Sheathed) Of Nominal Cross Sectional Area As Per Is 694-1990 With Isi Mark And As Per Its Latest Amendments. 1X3x2.5 Sqm,Supply And Delivery At Site Brand New Best Make Pvc Insulated Cable Of Flat 3 Core (Sheathed) Of Nominal Cross Sectional Area As Per Is 694-1990 With Isi Mark And As Per Its Latest Amendments. 1X3x1.5 Sqm,Providing Submersible Pump Set Of 150Mm Dia Suitable For Bore Well And Confirming To Is 8034-2000 3Phase, Ss Bowl & Impeller With Low Volt Motor As Per Specifications, To Work Site As Per Necessary Ammendments And Instructions Of Engineer Incharge Of Work. For 3 Hp Etc. Complete. 10.00 Hp - 90 Lpm At 220 M 20 Stg Outlet Dia - 2.00Inch,Providing Submersible Pump Set Of 150Mm Dia Suitable For Bore Well And Confirming To Is 8034-2000 3Phase, Ss Bowl & Impeller With Low Volt Motor As Per Specifications, To Work Site As Per Necessary Ammendments And Instructions Of Engineer Incharge Of Work. For 3 Hp Etc. Complete. 7.50 Hp - 90 Lpm At 165 M 16 Stg Outlet Dia - 2.00Inch,Providing Submersible Pump Set Of 150Mm Dia Suitable For Bore Well And Confirming To Is 8034-2000 3Phase, Ss Bowl & Impeller With Low Volt Motor As Per Specifications, To Work Site As Per Necessary Ammendments And Instructions Of Engineer Incharge Of Work. For 3 Hp Etc. Complete. 6.50 Hp - 90 Lpm At 132 M 15 Stg Outlet Dia - 2.00Inch,Providing Submersible Pump Set Of 150Mm Dia Suitable For Bore Well And Confirming To Is 8034-2000 3Phase, Ss Bowl & Impeller With Low Volt Motor As Per Specifications, To Work Site As Per Necessary Ammendments And Instructions Of Engineer Incharge Of Work. For 3 Hp Etc. Complete. 5.00 Hp - 90 Lpm At 110 M 15 Stg Outlet Dia - 2.00 Inch,Providing Submersible Pump Set Of 150Mm Dia Suitable For Bore Well And Confirming To Is 8034-2000 3Phase, Ss Bowl & Impeller With Low Volt Motor As Per Specifications, To Work Site As Per Necessary Ammendments And Instructions Of Engineer Incharge Of Work. For 3 Hp Etc. Complete. 4.00 Hp 90 Lpm At 88 M 12 Stg Outlet Dia 2.00 Inch,Providing Submersible Pump Set Of 150Mm Dia Suitable For Bore Well And Confirming To Is 8034-2000 3Phase, Ss Bowl & Impeller With Low Volt Motor As Per Specifications, To Work Site As Per Necessary Ammendments And Instructions Of Engineer Incharge Of Work. For 3 Hp Etc. Complete. 3.00 Hp 90 Lpm At 66 M 10 Stg Outlet Dia 2.00 Inch,Providing, Single Phase Submersible Pump Sets Of 100Mm Dia (4 Inch) Suitable For Bore Well Confirming To Is 8034-2000 Specifications, To Work Site With Testing Of As Per Instructions Of Engineer Incharge Of Work And Latest Amendments Etc. Complete. 3.00 Hp/2.2Kw 20 Stg,Providing, Single Phase Submersible Pump Sets Of 100Mm Dia (4 Inch) Suitable For Bore Well Confirming To Is 8034-2000 Specifications, To Work Site With Testing Of As Per Instructions Of Engineer Incharge Of Work And Latest Amendments Etc. Complete. 2.00 Hp/1.5Kw 16 Stg,Providing, Single Phase Submersible Pump Sets Of 100Mm Dia (4 Inch) Suitable For Bore Well Confirming To Is 8034-2000 Specifications, To Work Site With Testing Of As Per Instructions Of Engineer Incharge Of Work And Latest Amendments Etc. Complete. 1.50 Hp/1.1Kw 18 Stg,Providing Of Thermosetting Plastic I.E Fibere Glass Reinforced Polyster Sheet Moulding Compound(Smc) Pump House With Smc Door & Canopy Etc Complete Component As Directed By The Departmental Officers.,Replace The Components Of Motor Parts Of Submersible Pump Sets, Items Requiring Replacements Decided By The Departmental Officials, With Respective Make Of Damaged Ones, Including All Materials, Labour, Equipments And Testing Etc And Wtih Guarantee/ Warranty For One Year For The Labour Charges Only For Overhauling,Replace The Components Of Motor Parts Of Submersible Pump Sets, Items Requiring Replacements Decided By The Departmental Officials, With Respective Make Of Damaged Ones, Including All Materials, Labour, Equipments And Testing Etc And Wtih Guarantee/ Warranty For One Year For The Lifting Of Submersible Pumpset From Well.,Replace The Components Of Motor Parts Of Submersible Pump Sets, Items Requiring Replacements Decided By The Departmental Officials, With Respective Make Of Damaged Ones, Including All Materials, Labour, Equipments And Testing Etc And Wtih Guarantee/ Warranty For One Year For The Re-Errection Charges Of Pumping Machineries Including Overhauling And Painting,Replace The Components Of Motor Parts Of Submersible Pump Sets, Items Requiring Replacements Decided By The Departmental Officials, With Respective Make Of Damaged Ones, Including All Materials, Labour, Equipments And Testing Etc And Wtih Guarantee/ Warranty For One Year For The Transportation Of Pumping Machineries,Replace The Components Of Motor Parts Of Submersible Pump Sets, Items Requiring Replacements Decided By The Departmental Officials, With Respective Make Of Damaged Ones, Including All Materials, Labour, Equipments And Testing Etc And Wtih Guarantee/ Warranty For One Year For The Motor Base With Pin,Replace The Components Of Motor Parts Of Submersible Pump Sets, Items Requiring Replacements Decided By The Departmental Officials, With Respective Make Of Damaged Ones, Including All Materials, Labour, Equipments And Testing Etc And Wtih Guarantee/ Warranty For One Year For The Circlips,Replace The Components Of Motor Parts Of Submersible Pump Sets, Items Requiring Replacements Decided By The Departmental Officials, With Respective Make Of Damaged Ones, Including All Materials, Labour, Equipments And Testing Etc And Wtih Guarantee/ Warranty For One Year For The Gun Metal Bearing, Centrifugally Cast Aluminium Bronze Bearing Bush,Replace The Components Of Motor Parts Of Submersible Pump Sets, Items Requiring Replacements Decided By The Departmental Officials, With Respective Make Of Damaged Ones, Including All Materials, Labour, Equipments And Testing Etc And Wtih Guarantee/ Warranty For One Year For The Stud And Nuts,Replace The Components Of Motor Parts Of Submersible Pump Sets, Items Requiring Replacements Decided By The Departmental Officials, With Respective Make Of Damaged Ones, Including All Materials, Labour, Equipments And Testing Etc And Wtih Guarantee/ Warranty For One Year For The Carbon Housing (Top Carbond / Ferrodo Padding),Replace The Components Of Motor Parts Of Submersible Pump Sets, Items Requiring Replacements Decided By The Departmental Officials, With Respective Make Of Damaged Ones, Including All Materials, Labour, Equipments And Testing Etc And Wtih Guarantee/ Warranty For One Year For The Carbon Housing (Thrust Bearing Block Assembly Complete With Segment Bearing Pad.,Replace The Components Of Motor Parts Of Submersible Pump Sets, Items Requiring Replacements Decided By The Departmental Officials, With Respective Make Of Damaged Ones, Including All Materials, Labour, Equipments And Testing Etc And Wtih Guarantee/ Warranty For One Year For The Carbon Housing,Replace The Components Of Motor Parts Of Submersible Pump Sets, Items Requiring Replacements Decided By The Departmental Officials, With Respective Make Of Damaged Ones, Including All Materials, Labour, Equipments And Testing Etc And Wtih Guarantee/ Warranty For One Year For The Lock Ring,Replace The Components Of Motor Parts Of Submersible Pump Sets, Items Requiring Replacements Decided By The Departmental Officials, With Respective Make Of Damaged Ones, Including All Materials, Labour, Equipments And Testing Etc And Wtih Guarantee/ Warranty For One Year For Upper/ Lower Housing,Replace The Components Of Motor Parts Of Submersible Pump Sets, Items Requiring Replacements Decided By The Departmental Officials, With Respective Make Of Damaged Ones, Including All Materials, Labour, Equipments And Testing Etc And Wtih Guarantee/ Warranty For One Year For The Lower Flange,Replace The Components Of Motor Parts Of Submersible Pump Sets, Items Requiring Replacements Decided By The Departmental Officials, With Respective Make Of Damaged Ones, Including All Materials, Labour, Equipments And Testing Etc And Wtih Guarantee/ Warranty For One Year For The Upper Flange,Replace The Components Of Motor Parts Of Submersible Pump Sets, Items Requiring Replacements Decided By The Departmental Officials, With Respective Make Of Damaged Ones, Including All Materials, Labour, Equipments And Testing Etc And Wtih Guarantee/ Warranty For One Year For The Rotor Motor 4 To 5 H.P,Replace The Components Of Motor Parts Of Submersible Pump Sets, Items Requiring Replacements Decided By The Departmental Officials, With Respective Make Of Damaged Ones, Including All Materials, Labour, Equipments And Testing Etc And Wtih Guarantee Or Warranty For One Year For The Rotor Of Motor 3 To 4 H.P,Replace The Components Of Motor Parts Of Submersible Pump Sets, Items Requiring Replacements Decided By The Departmental Officials, With Respective Make Of Damaged Ones, Including All Materials, Labour, Equipments And Testing Etc And Wtih Guarantee Or Warranty For One Year For The Rotor Of Motor Upto 3.0 H.P,Replace The Components Of Motor Parts Of Submersible Pump Sets, Items Requiring Replacements Decided By The Departmental Officials, With Respective Make Of Damaged Ones, Including All Materials, Labour, Equipments And Testing Etc And Wtih Guarantee Warranty For One Year For The Stator Of Motor 4 To 5 H.P,Replace The Components Of Motor Parts Of Submersible Pump Sets, Items Requiring Replacements Decided By The Departmental Officials, With Respective Make Of Damaged Ones, Including All Materials, Labour, Equipments And Testing Etc And Wtih Guarantee/ Warranty For One Year For The Stator Of Motor 3 To 4 H.P,Replace The Components Of Motor Parts Of Submersible Pump Sets, Items Requiring Replacements Decided By The Departmental Officials, With Respective Make Of Damaged Ones, Including All Materials, Labour, Equipments And Testing Etc And Wtih Guarantee/ Warranty For One Year For The Stator Of Motor Upto 3 H.P,Replace The Components Of Submersible Pump Sets, Requiring Replacements Decided By The Departmental Officials, With Respective Make Of Damaged Ones, Including All Materials, Labour, Equipments And Testing Etc.(With Gurantee Of Period Not Less Than 1 Year) For The Labour Charges For Overhauling Of The Pump Set.,Replace The Components Of Submersible Pump Sets, Requiring Replacements Decided By The Departmental Officials, With Respective Make Of Damaged Ones, Including All Materials, Labour, Equipments And Testing Etc.(With Gurantee Of Period Not Less Than 1 Year) For The Brass Filter,Replace The Components Of Submersible Pump Sets, Requiring Replacements Decided By The Departmental Officials, With Respective Make Of Damaged Ones, Including All Materials, Labour, Equipments And Testing Etc.(With Gurantee Of Period Not Less Than 1 Year) For The Strainer,Replace The Components Of Submersible Pump Sets, Requiring Replacements Decided By The Departmental Officials, With Respective Make Of Damaged Ones, Including All Materials, Labour, Equipments And Testing Etc.(With Gurantee Of Period Not Less Than 1 Year) For The Cable Guard,Replace The Components Of Submersible Pump Sets, Requiring Replacements Decided By The Departmental Officials, With Respective Make Of Damaged Ones, Including All Materials, Labour, Equipments And Testing Etc.(With Gurantee Of Period Not Less Than 1 Year) For The Non Return Valve (Nrv) Assembly Complete With Rubber O Ring.,Replace The Components Of Submersible Pump Sets, Requiring Replacements Decided By The Departmental Officials, With Respective Make Of Damaged Ones, Including All Materials, Labour, Equipments And Testing Etc.(With Gurantee Of Period Not Less Than 1 Year) For The Pump Coupling (Stainless Steel),Replace The Components Of Submersible Pump Sets, Requiring Replacements Decided By The Departmental Officials, With Respective Make Of Damaged Ones, Including All Materials, Labour, Equipments And Testing Etc.(With Gurantee Of Period Not Less Than 1 Year) For The Pump Key (Stainless Steel),The Pump Shaft Made Out Of Stainless Steel Counterless Ground With Key Way (Upto 8 Stages). Extra For Each Stage,Replace The Components Of Submersible Pump Sets, Requiring Replacements Decided By The Departmental Officials, With Respective Make Of Damaged Ones, Including All Materials, Labour, Equipments And Testing Etc.(With Gurantee Of Period Not Less Than 1 Year) For The Allen Screw,Replace The Components Of Submersible Pump Sets, Requiring Replacements Decided By The Departmental Officials, With Respective Make Of Damaged Ones, Including All Materials, Labour, Equipments And Testing Etc.(With Gurantee Of Period Not Less Than 1 Year) For The Steel Bearing Bush (Do Steel Bush),Replace The Components Of Submersible Pump Sets, Requiring Replacements Decided By The Departmental Officials, With Respective Make Of Damaged Ones, Including All Materials, Labour, Equipments And Testing Etc.(With Gurantee Of Period Not Less Than 1 Year) For The Discharge Outlet (Do) Bearing Do Steel Brush Do Bearing.,Replace The Components Of Submersible Pump Sets, Requiring Replacements Decided By The Departmental Officials, With Respective Make Of Damaged Ones, Including All Materials, Labour, Equipments And Testing Etc.(With Gurantee Of Period Not Less Than 1 Year) For The Impeller (Shell Moulded With Aluminium And Bronze.),Replace The Components Of Submersible Pump Sets, Requiring Replacements Decided By The Departmental Officials, With Respective Make Of Damaged Ones, Including All Materials, Labour, Equipments And Testing Etc.(With Gurantee Of Period Not Less Than 1 Year) For The Guide Vane,Replace The Components Of Submersible Pump Setsfor The Oil Seal.And Steel Bush,Replace The Components Of Submersible Pump Sets For The Oil Seal.,Replace The Components Of Submersible Pump Sets The Intermediate Piece (Ip) With Ip Leaded Bronze Brush.,Replace The Components Of Submersible Pump Sets For The Bowls Of Same Type And Make,Rewinding Of Submersible Pumpset For All Types Of Submersible Pumpsets Above 9.5 Hp And Upto 10.0H.P.,Rewinding Of Submersible Pumpset With Copper Winding Wires Of Appropriate Guage, As Per Specifications And / Or Directions Of The Departmental Officials, Including All Materials, Labour, Equipment And Testing. For All Types Of Submersible Pumpsets Etc.(With Guarantee Period Not Less Than 6 Months) For For All Types Of Submersible Pumpsets Above 9.0 Hp And Upto 9.5H.P.,Rewinding Of Submersible Pumpset With Copper Winding Wires Of Appropriate Guage, As Per Specifications And / Or Directions Of The Departmental Officials, Including All Materials, Labour, Equipment And Testing. For All Types Of Submersible Pumpsets Etc.(With Guarantee Period Not Less Than 6 Months) For For All Types Of Submersible Pumpsets Above 8.5 Hp And Upto 9.0H.P.,Rewinding Of Submersible Pumpset For All Types Of Submersible Pumpsets Above 8.0 Hp And Upto 8.5H.P.,Rewinding Of Submersible Pumpset With Copper Winding Wires Of Appropriate Guage, As Per Specifications And / Or Directions Of The Departmental Officials, Including All Materials, Labour, Equipment And Testing. For All Types Of Submersible Pumpsets Etc.(With Guarantee Period Not Less Than 6 Months) For For All Types Of Submersible Pumpsets Above 7.5 Hp And Upto 8.0H.P.,Rewinding Of Submersible Pumpset With Copper Winding Wires Of Appropriate Guage, As Per Specifications And / Or Directions Of The Departmental Officials, Including All Materials, Labour, Equipment And Testing. For All Types Of Submersible Pumpsets Etc.(With Guarantee Period Not Less Than 6 Months) For For All Types Of Submersible Pumpsets Above 7.0 Hp And Upto 7.5H.P.,Rewinding Of Submersible Pumpset With Copper Winding Wires Of Appropriate Guage, As Per Specifications And / Or Directions Of The Departmental Officials, Including All Materials, Labour, Equipment And Testing. For All Types Of Submersible Pumpsets Etc.(With Guarantee Period Not Less Than 6 Months) For For All Types Of Submersible Pumpsets Above 6.5 Hp And Upto 7.0H.P.,Rewinding Of Submersible Pumpset For For All Types Of Submersible Pumpsets Above 6.0 Hp And Upto 6.5H.P.,Rewinding Of Submersible Pumpset With Copper Winding Wires Of Appropriate Guage, As Per Specifications And / Or Directions Of The Departmental Officials, Including All Materials, Labour, Equipment And Testing. For All Types Of Submersible Pumpsets Etc.(With Guarantee Period Not Less Than 6 Months) For For All Types Of Submersible Pumpsets Above 5.5 Hp And Upto 6.0H.P.,Rewinding Of Submersible Pumpsetfor For All Types Of Submersible Pumpsets Above 5.0 Hp And Upto 5.5H.P.,Rewinding Of Submersible Pumpset With Copper Winding Wires Of Appropriate Guage, As Per Specifications And / Or Directions Of The Departmental Officials, Including All Materials, Labour, Equipment And Testing. For All Types Of Submersible Pumpsets Etc.(With Guarantee Period Not Less Than 6 Months) For For All Types Of Submersible Pumpsets Above 3 Hp And Upto 5.0 H.P.,Rewinding Of Submersible Pumpset For For All Types Of Submersible Pumpsets Upto 3.0 H.P.,Providing And Laying At Site Of Work Ms Casing Caps As Per Is 1239 (Partii) 1982 With All Latest Amendments If Any For Any Dia. The Thickness Of Plate Used For Covering One End Shall Be 3Mm (Minimum). The Dimensions Of Caps And Colars Shall Be Strictly As Per Is 1239 (Part-Ii) 1982 With All Amendments Including Cost Of Material And Labour Charges For Fixing, If Any Etc. Complete With All Lead And Lifts And As Directed By The Engineer In Charge,Providing And Fixing Ms Casing Collars As Per Is 1239 (Part-Ii) 1982 With All Latest Amendments If Any For Any Dia. The Thickness Of Plate Used For Covering One End Shall Be 3Mm (Minimum) The Dimensions Of Caps And Colars Shall Be Strictly As Per Is 1239 (Part Ii) 1982 With All Amendments,Repair Of Existing Energized Borewell Outdoor Ms Panel Board By Welding The Damaged Broken Panel Board Doors Body Sheet, Angle Iron, Frame Door Hinges, Cement Concrete To Panel Board Legs, Embossing (Letters & Rr No.) Etc., Complete,Labour Charges For Lowering Additional Gi Pipes Of Dia 32Or 50 Mm Dia Including Transportation Charges (New Gi Pipe Required Will Be Supplied By The Department Free Of Cost & Released Gi Pipes Should Be Handed Over To The Department (Labour Charges Only) Above 3 Mtr Lengths.,Labour Charges For Lowering Additional Gi Pipes Of Dia 32 Or 50 Mm Dia Including Transportation Charges (New Gi Pipe Required Will Be Supplied By The Department Free Of Cost & Released Gi Pipes Should Be Handed Over To The Department (Labour Charges Only). Upto 3 Mtr Lengths,Labour Charges For Erection Of New Or Repaired Submersible Pump Set Along With Gi Pipes 32Mm Or 50Mm Cable (New Submersible Pump Set If Required Will Be Supplied By The Department Free Of Cost And Released Pump Set Should Be Handed Over To Department) Including Transportation. (Each Length 6 M),Lifting Of Struck Up Submersible Pump Set Above 300 Ft,Lifting Of Struck Up Submersible Pump Set. Upto 300 Ft,Labour Charges For Lifting Of Non Functioning Submersible Pump Set Along With Cable And Gi Pipes Each Length 6M For 32 Mm,Labour Charges For Lifting Of Non Functioning Submersible Pump Set Along With Cable And Gi Pipes Each Length 6M For 50 Mm,Fishing Out Power Pump From The Borewell Including The Cost Of Labour Materials With All Lead And Lifts Etc Complete,Scraping Of Old Paints Stains Etc And Provide Painting With Anti Corrosive Pint Over A Cost Primer Etc With Approved Brand Of Paint And Primer Etc. Including The Cost Of All Materials Labour Transportation And Numbering Etc As Directed By The Departmental Officials,Labour Charges For Repairing Of Existing Hand Pump Both India Mark Ii And India Makr Iii Below The Ground Level After Dismantling The Hand Pump Head Assembly, Water Tank Riser Assembly Plunger Rods Pump Cylinder Replacing Of Worn Out Parts In The Pumpset Cylinder Including Overhauling Of Cylinder Cutting The Gi Pipes And Rods And Threading The Same, Complete Excluding The Cost Of Spares,Labour Charges For Repairing Of Existing Hand Pump Both India Mark Ii And India Makr Iii Above The Ground Level Including Replacing Of Worn Out Parts Such As Top Head Inspection Cover Complete Excluding The Cost Of Spares,Providing And Greasing The Chain Of Hand Pump Both India Mark Ii And India Mark Iii By Removing The Top Head Cover Cleaning Wanter Tank And Head Assembly Removing All Dirt Inside And Outside The Hand Pump Body And Refixing The Top Head Cover By Fixing The Bolts And Nuts Including Replacing The Bolts And Nuts With New Ones Wherever Necssary Etc Complete,Dismantling India Markiii Hand Pump From Position Releasing Gi Pipes Rods Pump Cylinder And Strainer Overhauling The Components Replace The Wornout Parts And Re Erecting In Position Etc With Cutting Threading Wherever Necessar Adjusting The Rod And Giving Satisfactory Test Etc The Replaced Materials To Be Returned To The Departmental Store The Cost Exclude The Cost Of Parts Required For Replacement,Dismantling India Mark Iii Hand Pump From Position Releasing Plunger Rods Valves Piston Overhauling The Components Replace The Wornout Parts And Re Erecting In Position Etc With Cutting Threading Wherever Necessary Adjusting The Rod And Giving Satisfactory Test Etc The Replaced Materials To Be Returned To The Departmental Store The Cost Exclude The Cost Of Parts Required For Replacement,Repair Top Head Assembly Of Hand Pumps By Removing The Top Head Assembly Replacing The Wornout Parts Such As Handle Axle Chain Bearings Reassembling After Greasing In Position And Giving Satisfactory Test Etc Complete Excluding The Cost Of Parts Required For Replacement Etc Complete,Erecting And Commissioning Of New Hand Pump India Mark Iii Including Fixing Of Gi Pipes Fixing Of Hand Pump To The Borewell And Giving Satisfactory Test Etc Complete,Erecting And Commissioning Of New Hand Pump Including Fixing Of Gi Pipes, Fixing Of Hand Pump To The Borewell And Giving Satisfactory Test Etc. Complete.