|
| 1 | The work of safe carriage of the following material from Byebagh store center to work site under the jurisdiction of EDD-TILHAR, Shajahanpur. Approx. distance upto 80 KM. Including safe loading and unloading. |
| 2 | PCC P0le 8.5/ 9 meter Long. |
| 3 | STP Pole 9/11/13 Meter Long. |
| 4 | Line material i.e, Cross arm/ Conductor / Pininsulater / stay/earthing rod / Disc Fitting / Disc Insulators / 11 kv XLPE Cable etc. |
| 5 | 11/0.4 KV 3 Phase 25 kva T/F |
| 6 | 11/0.4 KV 3 Phase 63 kva T/F |
| 7 | 11/0.4 KV 3 Phase 100 kva T/F |
| 8 | 11/0.4 KV 3 Phase 250/400 kva T/F |
| 9 | 11 KV CT PT UNIT. |
| 10 | 11 kv Pilfer Proof Metering Cubical |
| 11 | Erection of new PCC Single@DoublePole in H.T/L.T Line Including fitting of all accessories as per RESSPO Norms. |
| 12 | PCC Pole 8.5 /9 meter Long SnglePole. |
| 13 | PCC Pole 8.5 /9 meter Long DoublePole. |
| 14 | ST Pole 9/11/13 Meter Long Single Pole. |
| 15 | ST Pole 9/11 Meter Long Double Pole. |
| 16 | Grouting with 1:4:8 mixture In Size(450x450x1500mm) Including cost of cement/BB & sand required as per RESSPO Norms |
| 17 | PCC Ple 8.5/9 Meter Long Single Pole |
| 18 | PCC Ple 8.5/9 Meter Long Double Pole |
| 19 | ST Pole 9/11/13 Meter Long Single Pole. |
| 20 | ST Pole 9/11/13 Meter Long Double Pole. |
| 21 | The work of Driving the earthing electrode and making connections with 6 S.W.G GI Wire as per RESSPO Norms. |
| 22 | Laying stringing & sagging of FollowingConductor Complete in all respect |
| 23 | ACSR Weasal Conductor |
| 24 | ACSR rabit/Dog Conductor |
| 25 | 3 Phase arial Bunched Conductor |
| 26 | 1 Phase Arial Bunched Conductor |
| 27 | Mounting of CT PT unit ondouble Pole. |
| 28 | UNDER GROUND LAYING OF FOLLOWING CABLE IN SINGLE CIRCUIT ON RIVER SAND TO DOUBLE POLE SITUATED AT BOTH SIDES OF ROAD COMPLETE IN ALL RESPECT. MINIMUM DEPTH SHOULD BE 0.75 METER AND CABLE SHOULD BE COVERED BY BRICKES FROM THREE SIDES. ALONG WITH FILLING OF 04 NOS. CABLE JOININGKITES. |
| 29 | 11 KV XLPE Cable Size 3x70 SQMM |
| 30 | 11 KV XLPE Cable Size 3x120 SQMM |
| 31 | 11 KV XLPE Cable Size 3x185 SQMM |
| 32 | Construction of Plinth |
| 33 | Fencing of Plinth |
| 34 | ERECTION AND GROUTING OF STAY SET GROUTING MATERIAL PROVIDING BY THE CONTRACTOR . |
| 35 | INSTALLATION OF X ARM |
| 36 | Installation of 11 kv Pilfer Proof meteringCubicle in metering room complete in all respect. |
| 37 | Mounting of Following Capacity Transformers as per norms complete in all respect. |
| 38 | 25 KVA T/F |
| 39 | 63 KVA T/F |
| 40 | 100 KVA T/F |
| 41 | 250/400 KVA T/F |
| 42 | Fixing of Distribution Box complete in all respect |
| 43 | Guarding at road crossingcomplete in all respect |
| 44 | Dismantling of Lines |
| 45 | Safe back carriage of scrap (if any) from work site to bye bagh stroeshahjahanpur approx distance upto 80 KM including safe loading and unloading. |
| 46 | Fabrication works |
| 47 | Dismantling of T/F KVA/ 25 KVA/63KVA/100 KVA |
| 48 | Fixingand Providing of x-ARM Clamp. |
| 49 | Fixingand Providing of Stay Clamp. |
| 50 | Fixingand Providing of top Channel Clamp. |
| 51 | Fixingand Providing of TEE OFF CHANNEL Clamp. |
| 52 | Fixingand Providing of LT CLAMP FOR PCC/ STP . |
| 53 | Fixingand Providing of DED AND CLAMP FOR PCC/STP. |
| 54 | Fixingand Providing of SUSPENSION CLAMP FOR PCC/STP. |
| 55 | Fixing and providing of ALLU. LUGS 70 SQMM FOR PCC / STP |
| 56 | Fixing and providing of ALLU. LUGS 95 SQMM FOR PCC / STP |
| 57 | Fixing and providing of ALLU. LUGS 120 SQMM FOR PCC / STP |
| 58 | Fixing and providing of ALLU. LUGS 185 SQMM FOR PCC / STP |
| 59 | Fixing and providing of ALLU. LUGS 240 SQMM FOR PCC / STP |
| 60 | Fixing of LT XLPE LED DIFFERENT SIZE. |
| 61 | Fixing and Providing of PG CLAMP FOR PCC/STP |
| 62 | Fixingand Providing of GI HOOK FOR PCC/STP. |
| 63 | Fixingand Providing of NUT AND BOLT OFF Size. |