| 1 | Cartage of the following material fromStore Centre, Asfabad, Firozabad to dump site of work including loading and unloading at the respective ends and also including the work of dragging etc. [Distance 00.00 Km to 40 Km] |
| 2 | 8.5/9 meter long PCC pole |
| 3 | 11/13 meter long ST pole |
| 4 | Conductor, GI earth wire, cross arm, angle, channel, insulator other line material. |
| 5 | CT PT Unit of diff. ratings |
| 6 | 11 KV/33 KV Cubical Box of diff. ratings |
| 7 | 16 KVA transformer |
| 8 | 25 KVA transformer |
| 9 | 63 KVA transformer |
| 10 | 11 KV XLPE cable 3x70 mm² / 3 x 120 mm²/3x185 mm²/3x300 mm² |
| 11 | Drilling of hole in channel, angle. |
| 12 | Painting of dropper channel, top channel, T channel and guarding angle with 2 quote of Red Oxide including the cost of paint. |
| 13 | Safe placement of 8.5/9 meter long PCC pole/ 11/13 meter long ST pole from dump site to the pit site of work including the work of dragging of the same through Kachha Pakka road. |
| 14 | Erection and grouting of double pole structure of 8.5/9 meter long PCC pole including fixing of HT fittings as per RESPO norms. The support shall be grouted in cement, sand, and brick ballast in ratio 1:2:4. |
| 15 | Erection of Single support of 8.5/9 meter long PCC pole including fixing of HT/LT fittings as per RESPO norms. The support shall be grouted in cement, sand, and brick ballast. |
| 16 | Erection of single support of 11/13 meter long ST pole duly grouted in cement, sand and brick ballast in ratio 1:4:8 including fixing of all HT fittings |
| 17 | Erection of double pole structure of 11/13 meter long ST pole duly grouted in cement, sand and brick ballast in ratio 1:4:8 including fixing of all HT fittings. |
| 18 | Construction of plinth of aforesaid newly erected 11/13 meter long ST pole as per RESPO norms in CC 1:2:4 ratio in cement, sand and stone grit duly 12 mm thick plaster in 1:4 ratio of cement and sand to give strengthening. |
| 19 | Grouting, fixing and nozzling of stay rod, andgrouting of stay rod shall be in ratio 1:4:8 [Cement, sand and brick ballast], as per RESPO norm, |
| 20 | Earthing of HT support through earthing rod & and connecting it properly as per RESPO norms. |
| 21 | Chopping of tree branches for clearance of line |
| 22 | Installation of Extra “T” as per RESPO manual |
| 23 | Installation of following Material in proper alignment and direction as per RESPO manual including the cost of arrangement of labourer, T&P etc required for proper completion of work. |
| 24 | 16 KVA transformer |
| 25 | 25 KVA transformer |
| 26 | 63 KVA transformer |
| 27 | Digging, laying and back filling 11 KV XLPE cable 3x70 mm² / 3 x 120 mm²/3x185 mm² /3x300 mm² XLPE cable trench as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement ofbricks, sand, labourer, T&P etc. required for proper completion of work. |
| 28 | CT PT Unit of diff. ratings |
| 29 | Installation material Contractor arrangeby own his coast Installation of following line material in proper alignment and direction as per RESPO manual, including the cost fo arrangement of labourer, T&P etc. required for proper completion of work for the supervising engineer. |
| 30 | 11 KV cross arm holding clamp with nut & bolt |
| 31 | 11 KV U clamp with nut & bolt |
| 32 | 11 KV F clamp with nut & bolt |
| 33 | Laying of 3x70 / 3x120 / 3x185 / 3x300 sqmm. XLPE cable in open and its making connection with transformer and 11 KV feeder also as per direction of supervising engineer. |
| 34 | Laying, stringing, sagging, binding and jumpering etc of weasel conductor as per RESPO norms. |
| 35 | Laying of Ariel bunch conductor cable of size 3x50 sqr. mm/ 3x95sqr mm |
| 36 | Laying, stringing, sagging, binding and jumpering etc of dog conductor as per RESPO norms. |
| 37 | Guarding of 11 KV line. |
| 38 | Installation of Distribution box as per RESPO manual and as per direction of supervising engineer. |
| 39 | Fixing of TPMO fuse set on newly erected transformers. |
| 40 | Installation of 11 KV/33 KV Cubical Box of diff. ratings |
| 41 | Filling and fixing of cable box suitable for XLPE cable, including the cost of arrangement of labourer, T&P etc. required for proper completion of work, but the box shall be provided by the corporation free of cost, as per actual sit requirement. |