|
| 1 | Periodic renewal and 5 year routine maintenance of MRL16-Thiruneelakandam To kannumkiliyanar RoadKm 0/0 - 2/178 inPackage no. TN 09-276R at Kollidam Block of Mayiladuthurai District |
| 2 | Clearing the light jungle including all labour charges for burrying and burning etc.,complete. |
| 3 | Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrainetc, complete. as per SS20 A |
| 4 | Collection and supply of US Gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreadingetc.complete, |
| 5 | Km 0/0 - 1/0 |
| 6 | Km 1/0 - 2/0 |
| 7 | Km 2/0 - 2/178 |
| 8 | Advance patch work for making up the undulation in the existing B.Tsurface to an average thickness ofof 25mm using 13.20mm IRC size HBG metal |
| 9 | Km 0/0 - 1/0 |
| 10 | Km 1/0 - 2/0 |
| 11 | Km 2/0 - 2/178 |
| 12 | Providing and laying TACK COATover the BT surface using 3.00 Kg of bituminous emulsion for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification. |
| 13 | BITUMINOUS CONCRETE 25 MMTHICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 13.20-11.20mm. 0.17cum of 6.7-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 |
| 14 | White washing for existing culverts |
| 15 | Road Marking |
| 16 | HM stones |
| 17 | KM stones |
| 18 | Providing Name board |
| 19 | Repainting information board |
| 20 | Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to berectified by the contractor at his own cost |
| 21 | For the First Year from the date ofcompletion of work |
| 22 | For the Second Year from the date ofcompletion of work |
| 23 | For the Third Year from the date ofcompletion of work |
| 24 | For the Fourth Year from the date ofcompletion of work |
| 25 | For the Fifth Year from the date ofcompletion of work |
| 26 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column \"BB\" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) |