|
| 1 | HSR Item 4.12.1-Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer- in-charge. 1. All kinds of soilHSR Rate(Rs.) 78.00Through Rate |
| 2 | HSR Item 6.1.6-Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 6. 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size)HSR Rate(Rs.) 2442.00Through Rate |
| 3 | HSR Item 6.14.1-Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone- III): 3 graded stone aggregate 20 mm nominal size)HSR Rate(Rs.) 4374.00Through Rate |
| 4 | HSR Item 10.8-Providing and laying of conglomerate floor 40mm thick cement concrete topping 1:2:4HSR Rate(Rs.) 181.00Through Rate |
| 5 | HSR Item 11.8.1-12 mm cement plaster of mix : 1. 1:4 (1 cement: 4 coarse sand)HSR Rate(Rs.) 114.00Through Rate |
| 6 | HSR Item 3.1.18-By Mechanical Transport including loading, unloading and stacking18. Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead up to 10 km for all lifts, complete as per directions of Engineer-in-charge.HSR Rate(Rs.) 202.00Rate |
| 7 | HSR Item 6.30.6-Centering and shuttering including strutting, propping etc. and removal of form for 6. Columns, Pillars, Piers, Abutments, Posts and StrutsHSR Rate(Rs.) 262.00Through Rate |
| 8 | HSR Item 7.22.1-Brick work with common burnt clay non- modular bricks of class designation 10.5 in superstructure above plinth level up to floor IV level in all shapes and sizes in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand)HSR Rate(Rs.) 4404.00Through Rate |
| 9 | HSR Item 6.8.1-Providing and laying damp-proof course with cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-III): 4 graded stone aggregate 12.5mm nominal size) 1. 50 mm thick HSR Rate(Rs.) 178.00Through Rate |
| 10 | HSR Item 7.21.1-Brick work with common burnt clay non- modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) HSR Rate(Rs.) 4128.00Through Rate |
| 11 | HSR Item 6.34.6-Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect above plinth level Note:- Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps.Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more.HSR Rate(Rs.) 68.00Through Rate |
| 12 | HSR Item 7.70-Extra for bailing / pumping out standing water ofpond caused by springs, sub soil water, canalorriver seepageandbrokenwater mains or drains except rain water collected in the trenches or foundations before laying brick work.HSR Rate(Rs.) 27.00Through Rate |
| 13 | HSR Item 13.29.2-Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar worksHSR Rate(Rs.) 83.00Through Rate |