|
| 1 | Safe Carriage of following material from store center PVVNL to site & vice-versa of work including loading & unloading at both ends maximum distance up to 100 Km. as per direction of supervising Engineer:- |
| 2 | PCC/STP Pole 8.5/11 Mtr. Long. |
| 3 | Line material such as HT/LT Cross arms, HT/LT pin, HT/LT pin insulator, HT/LT Disc insulator with fitting, Stay rod, Stay wire, LT AB cable of various size, ACSR conductor, GI Wire, MS angle iron & MS Channel, TPMO, Fuse set etc. |
| 4 | 10,25,63 & 100 KVA T/F CT/PT unit/ Metering cubical including complete related material required for transformer. |
| 5 | 250/400 KVA T/F including complete related material required for transformer. |
| 6 | 33 KV/11 KV XLPE Cable of size 3x70/3x120/3x185 sq.mm. |
| 7 | Erection of PCC/STP Pole 8.5/11 Mtr long with grouting after digging a pit of size 1.6 mtr deep in all type of Soil including back filling of the pole with proper ramming after completion of work (as per UPPCL Respo). |
| 8 | Fabrication and fixing of all HT/LT line accessories (as per UPPCL Respo). |
| 9 | Erection of Double pole on PCC/STP Pole 8.5/11 Mtr long with grouting after digging a pit of size 1.6 mtr deep in all type of Soil for each pole including back filling of the pole with proper ramming after completion of work. (as per UPPCL Respo). |
| 10 | Fabrication and fixing of MS angle and MS channel, fixing all HT/LT accessories, Fuse set HT/LT pin insulators on D/P Pole. (as per UPPCL Respo). |
| 11 | Mounting of 10,25,63 & 100 KVA T/F/ CT/PT unit & Fixing of Metering cubical with proper jumpering of HT side and fixing of cable on LT side of T/F. (as per UPPCL Respo). |
| 12 | Making of New 250/400 KVA T/F Plinth of size 6\"x6\"x3\" (feet) (as per UPPCL Respo). |
| 13 | Fencing of 250/400 KVA T/F (as per UPPCL Respo). |
| 14 | Mounting/Installation of 250/400 KVA T/F with proper jumpering of HT side and fixing of cable on LT side of T/F. (as per UPPCL Respo). |
| 15 | Making a section pole to exist pole after fabrication & fixing of T channel fixing of all HT/LT accessories. (as per UPPCL Respo). |
| 16 | Erection of stay rod complete after digging a pit of size 1.6 mtr deep and grouting the same in block of size 0.60 x 0.60 x 0.30 mtr and nuzzling at the both ends and filling the pit with excavated earth soil with proper ramming.(as per UPPCL Respo). |
| 17 | Laying lifting stringing & proper sagging of ACSR conductor for HT/LT line including binding & jumpering properly. (as per UPPCL Respo). |
| 18 | Laying of LT ABC Cable of various size including fixing of all LT ABC accessories on support (as per UPPCL Respo). |
| 19 | Laying of XLPE Cable of size 3x70/3x120/3x185 sq.mm pit of the size 1.5 in the trench and road crossing in the air (as per UPPCL Respo). |
| 20 | Laying of XLPE cable of various size by Trenchless boring(as per UPPCL Respo). |
| 21 | Fixing of Distribution box including fixing the cable from transformar and consumer service cable (as per UPPCL Respo). |
| 22 | Earthing of each HT/LT line pole & T/F properly after drive of electrodes if size 20mm x 250 mm and connection the earthing point with GL wire. (as per UPPCL Respo). |
| 23 | Guarding of line with G.I. wire having 2 no. horizontal wire & 3 Mtr distance of SWG G.I. wire after fabrication of guard cross arms of & fixing the same in supports. (as per UPPCL Respo). |
| 24 | Filling of 33KV/11 KV Jointing Kit Indoor/Outdoor of various size (as per UPPCL standard). |
| 25 | Providing and fixing of Holding Clamp (As Per Direction of Supervising Engineer). |
| 26 | Providing and fixing of HT/LT Clamp (As Per Direction of Supervising Engineer). |
| 27 | Providing and fixing of J Hook (As Per Direction of Supervising Engineer). |
| 28 | Providing and fixing of Piercing Clamp (As Per Direction of Supervising Engineer). |
| 29 | Providing and fixing of Dead and Clamp(As Per Direction of Supervising Engineer). |
| 30 | Providing and fixing of MS Nut and Bolts(As Per Direction of Supervising Engineer). |
| 31 | Providing and fixing of HT/LT Insulator (As Per Direction of Supervising Engineer). |
| 32 | Providing and Fixing of Auto Fuse Holder made of Bakelite sheet duly one side fixed alum parrel grove with GI U Bolt, nut & spring washer and other side fixed galvaized bush with both copper connection hook for binding fuse wire suitable for HT side of 10 to 100 KVA T/F\"s. |
| 33 | Providing and fixing LT Fuse set Installed in SMC BOX for 25 KVA, 63 KVA & 100 KVA Distribution T/F. |
| 34 | Cutting & chopping tree branches near side of line for making the clearance between line and tree. |