| 1 | Carriage of following material from store center PVVNL to site & vice-versa of work including loading & unloading at both ends maximum distance up to 100 Km. as per direction of Supervising Engineer. |
| 2 | PCC/STP Pole 8.5/11/13 Mtr Long. |
| 3 | 10 to 400 KVA T/F. |
| 4 | Line material such as HT/LT Cross Arms, HT/LT pin insulator, HT/LT pin, HT/LT disc insulator with fitting, stay rod, stay wire, LT AB cable (3x120) sq.mm/(3x95) sq.mm, ACSR conductor, GI wire, MS Angle, iron and MS channel, TPMO, Fuse set, Earthing, J Hook, GI wire for guarding, MS Nuts & bolts, suspension clamp etc. |
| 5 | Distribution box single phase/three phase. |
| 6 | Erection of PCC/STP pole 8.5/11/13 mtr long after digging a pit of size 1.6 mtr deep in all type of Soil including groutingratio (1:4:8)& back filling of the pole with proper ramming after completion of work. (as per UPPCL Respo). |
| 7 | Fabrication and fixing of all HT/LT line accessories (as per UPPCL Respo). |
| 8 | Mounting of 10 to 400 KVA T/F (as per UPPCL Respo). |
| 9 | Erection of Double pole on PCC/STP pole 8.5/11/13 mtr long after digging a pitt of size 1.6 mtr. Deep in all type of soil for each pole including groutingratio (1:4:8) & back filling of the pole with proper ramming after completion of work.(as per UPPCL Respo). |
| 10 | Fabrication and fixingof MS angle and MS channel, fixing all HT/LT accessories TPMO, Fuse set HT/LT pin insulators on Double pole. (as per UPPCL Respo). |
| 11 | Erection of stay set complete after digging a pit of size 1.6 mtr deep and grouting the same in block of size 0.60 x 0.60 x 0.30 mtr and nuzzling at the both ends and filling the pit with excavated earth soil with proper ramming. (as per UPPCL Respo). |
| 12 | Laying, lifting, stringing & proper sagging of Old ACSR conductor for 3 phase 3 wire HT/LT line including binding & jumpering properly (as per UPPCL Respo). |
| 13 | Laying of LT ABC Cable of various size including fixing of all LT ABC Cable accessories on suport (as per UPPCL Respo). |
| 14 | Fixing of distribution box including fixing the cable from transformer and consumer service cable(as per UPPCL Respo). |
| 15 | Earthing of each HT/LT line pole & T/F properly after drive of electrodes if size 20mm x 250 mm and connection the earthing point with GI wire. (as per UPPCL Respo). |
| 16 | Guarding of line with G.I. wire having 2 no. horizontal wire & 3 Mtr distance odf laces of ten 6 SWG/8 SWG G.I. wire complete work in all respect (as per UPPCL Respo). |
| 17 | Open the binding & resagging of existing HT/LT line. |
| 18 | Dismentling of STP pole/R.S Joist by digging the pits & removal of complete HT/LT line accessories(as per UPPCL Respo). |
| 19 | Straighting Tilted pole due to storm & resagging of conductor/cable after opening the binding and making properly (as per UPPCL Respo). |
| 20 | Providing and fixing ofF clamps (As Per Direction of Supervising Engineer). |
| 21 | Providing and fixing of Holding Clamp (As Per Direction of Supervising Engineer). |
| 22 | Providing and fixing of MS Nut & Bolts (As Per Direction of Supervising Engineer). |
| 23 | Cuttoing & chopping tree branches near side of line for making the clearance between line and tree. |
| 24 | Back cartageST pole/R.S Joist from work site central to Store Meerut LS. |
| 25 | Back cartage 10 to 400 KVA T/F. |