| 1 | Laying and Jointing PVC Pipe. Heading |
| 2 | Dismantling R.B. or R.C.C work including stacking of material within 60 meter lead. |
| 3 | Dismantling of Brick Masonry in Cement I/C stacking within 60 M. |
| 4 | Earth work in filling in base of kharanja and for strenthening of banksi/c all lift & lead upto 1.0 Kmwith mechanical compaction, ramming and dressing etc. complete. |
| 5 | Earth work in fillingfor strenthening of banksi/c all lift & lead upto 1.0 Kmwith manual compaction, ramming and dressing etc. complete. |
| 6 | Earth work in Excavation in foundation in dry soil i/c lift up to 1.5 m and lead upto 30 m and i/c back filling, watering and ramming of excavated earth into the plinth with removal and disposal of surplus earth as directed by engineer in charge upto distance of 30 m from the foundation trenches. |
| 7 | Laying brick ballast of size 25-40 mm i/c all cost materials, labour, T&P etc. |
| 8 | Laying C.C. 1:2:4 (M-15) using size (10-20) mm graded crushed aggregatei/c all cost materials, labour, T&P etc. |
| 9 | Laying C.C.1:1.5:3 (M-20) using size (20-40) mm graded crushed aggregatei/c all cost materials, labour, T&P etc. |
| 10 | Brick work in 1:4 C.M. i/c all cost of material, labour and T&P etc. complete. |
| 11 | Ordinary centering& shuttering of plywood or steel for R.C.C. work |
| 12 | Supplying & fixing of Reinforcementsteel for R.C.C work i/c cutting ,bending ,binding and cost of binding wire and steel i/clabour and T&P etc |
| 13 | Laying R.C.C. 1:1.5:3 (M-20) using size (10-20) mm graded crushed aggregatei/c all cost materials, labour, T&P etc. |
| 14 | Brick on edge Kharanjja withbrick laid dry joints sand filled including preparation of 4 cm sand base to proper slope and its ramming including supply of all materials. laour and T&p etc. required for proper completion of the work. |
| 15 | Cement Pointing in 1:2 C.M incl. all cost ofmaterial, labourt&p etc completion of work. |
| 16 | Applying two coat ofAltima Weather proof cement paintincluding a primer coat with cement primer approved brand on old surfacei/c all cost of materials labour and T&P etc. |
| 17 | Letter writing up to 10 cm Height including prepraition of base with primer two coatenamel paintincluding all costmaterial, labour and T&P etc required for proper completion of work |
| 18 | Providing and Fixing R.C.C. (1:1:2)WHEEL GUARD incd all material labour t&p etc complete. |
| 19 | Supplying, Laying20 kg to 40 kg weight boulder in crate with all cost of material, labour, taxes, T&P etc. complete /M³. |
| 20 | Spplying and Laying ofmechanically woven double twisted hexagonal shaped wire mesh wire crate of size 1.5x1.5x0.5 m with mesh size 10x12 cm 10 swg GI Wire. |
| 21 | Spplying and Laying ofGeo Textile Sheet made of 200 GSM Woven multiflament polypropylene yarn below Pitching with pegs i/c preparation of surface i/c all cost of material, labour, T&P etc complete. |
| 22 | Supplying, Laying Dry stone pitching up to 3m height with 60 meters lead of material. i/c cost of all material, labour & T&P etc. complete. |
| 23 | S/Fixing mild steel or iron work in heavy size such as trusses,builts gates door, frames record racks roofs works, gates etc.including cost of all materials ,labour and T&P etc. complete . |
| 24 | Filling of filter using gravel/ RBM under the CC block i/c carriage, placing, labour etc. complete. |