Tender For Arc Of Various Maintenance Works In Completed Jjm Schemes Under Div Bhiwadi Ncr ARC of O and M of various JJM completed schemes under Division Bhiwadi NCR under District Khairthal Tijara Sl. No. Item Description 1 RepairingofleakageinexistingDistribution/RisingMain/Transmission MainAC/PVC/HDPEpipeline upto1.5mtrdepthofsizesasgiven below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T&P& labour and will arrangetransportationofmaterialrequiredfromJenstore.(Required material such as pipe piece, CID Joints shall be provided by Departmentfree of cost) 2 In all type Soil AC/PVC/HDPE pipe 3 50/63/75mm 4 80/90mm 5 100/110mm 6 125/140mm 7 150/160mm /180mm 8 RepairingofleakageinexistingDistribution/RisingMain/Transmission Main AC/PVC/HDPEpipelinecontractor will use his own T&P& labour and will arrangetransportationofmaterialrequiredfromJenstore.(Required material such as pipe piece, CID Joints shall be provided by Departmentfree of cost) In all type Soil AC/PVC/HDPE pipe Add on above itemfor C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. (15.00 %) 9 In all type Soil AC/PVC/HDPE pipe 10 50/63/75mm 11 80/90mm 12 100/110mm 13 125/140mm 14 150/160mm /180mm 15 Replacement of CI/ DI Double fiange sluice va1ves,non returnva1ves,butter flyvalvesetc.inexistingDistribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given belowby diggingoutsuitablesizeofpitatsiteofworkincluding providingand fixingMS Nut and Boltand rubber gasket,dewatering and providing adequate safety arrangement at site and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level forentirejobcontractorwillusehisownT&P&labourandwill arrange transportation ofrequired material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost) 16 In all type Soil 17 80 mm 18 100 mm 19 125 mm 20 150 mm 21 200 mm 22 250 mm 23 Replacement of CI/ DI Double fiange sluice va1ves,non returnva1ves,butter flyvalvesetc.inexistingDistribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given belowby diggingoutsuitablesizeofpitatsiteofworkincluding providingand fixingMS Nut and Boltand rubber gasket,dewatering and providing adequate safety arrangement at site and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level forentirejobcontractorwillusehisownT&P&labourandwill arrange transportation ofrequired material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost) Add on above item no. 1.4.1 for CC Road.Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 24 In all type Soil 25 80 mm 26 100 mm 27 125 mm 28 150 mm 29 Repairing of leakage in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and thenrefilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T&P & labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) 30 In all type Soil 31 100mm 32 150mm 33 200mm 34 250mm 35 Repairing of leakage in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and thenrefilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T&P & labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost)Add on above item no. 1.2.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 36 In all type Soil 37 100mm 38 150mm 39 Disconnectionof waterconnectionfrom existingpipe line in all type of soils up to 1.5 mtr depth by digging out suitable size of pit at site of work, with cutting of service line and refixing of clamp revolvingit180degreerefillthepitfromexcavatedsandby ramming it & upto ground level for entire job contractorwill use his own T&P & labour. 40 Disconnectionof waterconnectionfrom existingpipe line in all type of soils up to 1.5 mtr depth by digging out suitable size of pit at site of work, with cutting of service line and refixing of clamp revolvingit180degreerefillthepitfromexcavatedsandby ramming it & upto ground level for entire job contractorwill use his own T&P & labour. Add on above item no. 1.7 for CC Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 41 Restoration of cement concreteroad including making of pit in regular shape, ramming and consolidation of surface, laying, positioning and compactingcement concrete ( M-20 ) minimum thickness 200 mm upto the satisfaction ofengineer incharge.The rate includes the makingof pit in regular shape, all labour, material and T&P charge complete job. 42 Unlowering of submersible pump set along with lowering pipes with depth up to 120 mtr and submersible cable with safety from tube well, checking the pump set, transportation of pump set from tube well site to storeas direction,receiving repaired / new pump set from store/ divisional store , testing the same, transportation tosite and lowering back into tube well along with submersible cable, lowering pipes,specials etc and commissioning of the tube well. The job also includes cable jointing,checking of discharge of pump set,interconnection of lowering pipe from nearby distribution pipe line,checking of starter and reporting for completion of Job or fault/problem if any. (Upto 20 Km distance run by lowering machine) For three Phase pump set 43 G.I. Double Flanged Pipe Lowering Assembly of nominal dia 50mm (depth up to 120 mtr) 44 G.I. Double Flanged Pipe Lowering Assembly of nominal dia 50mm (depth up from 121 mtr to 130 mtr) 45 G.I. Double Flanged Pipe Lowering Assembly of nominal dia 50mm (depth up from 131 mtr to 140 mtr) 46 G.I. Double Flanged Pipe Lowering Assembly of nominal dia 50mm (depth up from 141 mtr to 150 mtr) 47 G.I. Double Flanged Pipe Lowering Assembly of nominal dia 50mm (depth up from 151 mtr to 160 mtr) 48 G.I. Double Flanged Pipe Lowering Assembly of nominal dia 50mm (depth up from 161 mtr to 170 mtr) 49 Increasing of lowering pipes intube wells including cost of nut bolts and rubber gaskets / jointing material and PVC rope and transporatation of cable and extra lowering pipe from store.. However submersible cable and extra lowering pipe shall be provided by the department at store. For three phase pump set 50 G.I. Double Flanged Pipe Lowering Assembly of nominal dia ( For incease up to 30 Mtr length of pipe) 50 mm dia 51 Rewinding of three phase squirrel cage induction motor ofMonoblock pump sets including all necessary material and of the same characteristics as original with required size of super enameled copper wire (including cost of copper wire),E class insulation material and testing of motor on no load but to be guaranteed against testing on load at site, including transportation of motor pump to and from Div/AEn/JEn store complete as per direction of engineer in charge. 52 7.5 HP 53 10.00 HP 54 12.5 HP 55 15.00 HP 56 17.50 HP 57 20.00 HP 58 Repair Rewinding of Submersible motorand pump includes full servicing and rewinding (wherever required) as per manufacturers specification and to the satisfaction of Engineer Incharge. It includes the replacement of minor parts such as bushes (oil seal bush) Nut Bolts, washers, cable seal, gland ring, vent plug, water drain plug, etc. complete job 59 Above 5HP to 7.5 HP V-6 60 Above 7-5 HP to 10 HP V-6 61 Above 10 HP to 12.5 HP 62 Above 12.5 HP to 15 HP 63 Motor opening cable jointing & refitting charges when rewinding is not required. For V-6 64 Labour charges for removing electric fault in wiring / making connection through lugs (with the help of cramping tool) of motor pump set with starter atheadworks of water supply scheme/Tubewell/ openwell including cost of insulation tape etc..