| 1 | Survey of cable route as per instruction of site Engineer. |
| 2 | GIS Survey |
| 3 | Excavation of soil for making of Trial hole (Minm. Size 1.1x0.5x1.2M depth) as per instruction of Site Engineer incliding backfilling the excavated soil. |
| 4 | Excavation of soil for formation of cable trench having minimum size 1.1x0.5 and reinstatement for the cable trench with the excavated soil after completion of laying and dressingof 1 numbers 33 KV grade 3x400 SQMM XLPE UG cable and cable protection work as per specification and direction of the site Engineer.(R/L-3800 Mtr.) |
| 5 | Supply of kiln burnt 1st class bricks having proper size & shape suitable for cable protective cover as per instruction of site Engineer(24 Nos per mtr). |
| 6 | Laying of Bricks as per drawing and instruction of site Engineer. |
| 7 | Micro Tunneling work with laying of HDPEPipe as per instruction of site engineer and as per site condition including supply of PE-80, PN-6, 200 mm dia HDPE pipe as per IS:4984-2016 including preparation & submission of drawing. |
| 8 | Laying & dressing of 33KV XLPE 3x400 sqmm cable in the excavated cable trenches as per drawing no. PLN(D)/SS/126 dt. 23.06.2018 and as per instruction of site engineer. |
| 9 | Assistance for making Straight Through Joint |
| 10 | Assistance for making of End termination joint (outdoor & indoor). |
| 11 | Making Protective Duct for Cable Joint Complete as per WBSEDCL\"s approved drawing(Ref: PLN(D)/SS/128, dt: 23.06.2018 |
| 12 | Supply & fixing / laying of G.I. Pipe 200mm dia (medium) of make TATA / JINDAL / Equivalent as per I.S.I. suitable for cable protection as per instruction of site engineer. |
| 13 | Supply and Erection of cast iron cable marker on concrete foundation blocks for straight run, road crossing, joint location etc as per drawing no. PLN(D)/SS/128 dt. 23.06.2018 & as per instruction of site engineer. |
| 14 | Earthing complete at one side of laid cable as per instruction of site engineer with supply of materials. |
| 15 | Supply & filling of yellow sand in void portion of brick box after laying cable(with 75 mm sand level at base filling the space should between cable and bricks yellow sand (10 % of the total excavated portion. |
| 16 | Fixing of 33 KV LA and cable necessary fabrication of iron materials (LA & Iron materials will be supplied by WBSEDCL) |
| 17 | Supply & fixing of 33 KV Straight Through tapex joint (Denson)Jointing Kit for 3Cx400 SQmm XLPE Cable. |
| 18 | Supply & fixing of 33 KV O/D HS Joint for 3Cx400 Sqmm Cable (Raychem). |
| 19 | Flat earth for LA and cable (Earthing by G.I pipe electrode 50 mm dia and 3 mtr long with perforation of 12 mm dia holes @150 mm and G.I Flat 65X6 mm Made TATA/ JINDAL(All Materials to be supplied by the agency) |