| 1 | Cartage of following material from store center Meerut to J.E. store including loading & unloading at both ends maximum distance up to 40 km. :-(as per direction of Executive Engineer, for successful completion of work.) |
| 2 | A) P.C.C. Pole 8.5 Mtr Long. |
| 3 | B) Round Pole/STP Pole 11 Mrt Long. |
| 4 | C) Line material such as 11 KV Cross arm/conductor/GI wire/MS angle & MS Channel/Stay rod, disk fitting etc. |
| 5 | Cartage of the following material from store J.E. to site of work including loading & unloading at both ends (maximum distance up to 15 km.)A) P.C.C. Pole 8.5 Mtr Long. |
| 6 | B) Round Pole/STP Pole 11 Mrt Long. |
| 7 | C) Line material such as 11 KV Cross arm/conductor/GI wire/MS angle & MS Channel/Stay rod, disk fitting etc. |
| 8 | Safe cartage of Transformer from Central store Meerut to J.E. Store of work Including loading & unloading at both ends ( maximum distance up to 40 km.)A) 630 KVA TO 250 KVA |
| 9 | B) 100 KVA to 63 KVA |
| 10 | C) 25 KVA to 10 KVA |
| 11 | Safe cartage of Transformer from J.E. Store to side of work Including loading & unloading at both ends ( maximum distance up to 15 km.)A) 630 KVA TO 250 KVA |
| 12 | B) 100 KVA to 63 KVA |
| 13 | C) 25 KVA to 10 KVA |
| 14 | Erection of Round pole/PCC pole 8.5 Mtr long including fixing all accessories and fabrication as required after digging a pit of size 1.20x0.75x1.75 mtrs. As follows.A) PCC Pole. |
| 15 | B) Round Pole/ST Pole 11 mtr. Long. |
| 16 | Erection of D/P on PCC/Round Pole after digging a pit of size 1.20x0.75x1.75 mtrs including fabrication of structure as per RESPO Noms. |
| 17 | Earthing of PCC/STP support with MS Earth rod of 2.5 mtr. Long including excavation of pit & driving of MS rod up toproper depth & connection the earth eletrode with the help of GI wire. |
| 18 | Grouting of STP support with Dust, sement & stone Blast |
| 19 | Laying Lifting stringing and sagging of conductor complete in all respects as per RESPO norms. As follows : -A) Rabbit Conductor/ Weasel Conductor. |
| 20 | B) Dog Conductor. |
| 21 | Erection fixing & grouting of stay rod size 16x1800 mm after digging the pit of size 0.60x0.30x0.30 meter in ratio 1:4:8 including fixing of stay wire clamp and nuzzling at the both ends. |
| 22 | Straightening of tilled PCC Pole of 11 KV/LT Lines after opening the binding from insulators and digging the pit for require depth and refilling the same pit after completion of work including rebinding the conductor with insulators & sagging the conductor. |
| 23 | Mounting fo 11/0.4 KV T/F on pilnth & making Connection of PCC Cables & Lead of HT/LT line. As follows :-A) 630 KVA to 250 KVA |
| 24 | B) 100 KVA to 63 KVA |
| 25 | C) 25 KVA to 10 KVA |
| 26 | Providing & Fixing of following clamps for PCC Poles/ STP, made of MS flat of size 50x50 mm complete in all respects.A) LT Pin Clamps with nut & bolt. |
| 27 | B) Shackle Insulator with nut & bolt. |
| 28 | C) Holding Clamps with nut & bolt. |
| 29 | D) F Clamps with nut & bolt. |
| 30 | E) Double Pole Clamps with nut & bolt. |
| 31 | Providing & fixing of stay clamp for PCC Pole/STP made of MS flat of size 50x6 mm complete in all respect. |
| 32 | Providing & fixing of Stay insulator in stay wire as per site requirement. |
| 33 | Fabrication of cross arm from given MS Channel from making T/Section of HT Lines. |
| 34 | Providing D-Type loop on each face & neutral. |
| 35 | providing & fixing of bamboo sticks of required size on LT Line as per instruction of JE. Concerned. |
| 36 | Making section T-off for 11 KV/LT Line. |
| 37 | Reflxing of old stay after digging of pole of regard size & then groting of stay on site required. |
| 38 | Cutting & Chopping of tree branches. |
| 39 | Jumpering of 11 KV/LT Line at different places/T points. |
| 40 | Fixing of meter Cubicle & making connection & other related works. |
| 41 | Guarding of 11 KV Line as per norms. |
| 42 | Cartage of11 KV XLPE Cable of various sizefrom store center Meerut to J.E. store including loading & unloading at both ends maximum distance up to 40 km. :- |
| 43 | Cartage of11 KV XLPE Cable of various sizefrom JE store to site including loading & unloading at both ends maximum distance up to 15 km. :- |
| 44 | Laying Lifting Stringing of proper Sagging of11 KV XLPE Cable of various size with fitting jointing Kit different size |
| 45 | Repair/Replacement of damaged burnt jumpers of double pole/section pole of 11 KV/LT Line. |
| 46 | Cartage of ABC Cable with junction box & other store materials related with the work of ABC for each site/Transformer. |
| 47 | Laying Lifting of ABC Cable complete in all respect as per instrution of JE/SDO. |
| 48 | Fixing of Junction Box & making connection & other related works. |
| 49 | Fixing of TPMO at D/P. |
| 50 | Fixing of fuse set at D/P. |
| 51 | New LT PVC Cable ofT/F, :- 100 KVA to 63 KVA, 25 KVA |
| 52 | Water level Earthing (Neutral/Body) by providing & fixing 30 mtrs 30 mm dia GI Pipe with MS Strip 40x6 mm, lowering the same after boring of earth by 4\" dia upto 30 Mtr depth/water level. |
| 53 | Fixing of 11KV Jointing Kit of Different Size 3x185, 3x120, 3x70 |
| 54 | Fixing of 11KV CT/PT Unitof Different Size |
| 55 | Making new Plinth for 250/630 KVA T/F for imstallation new T/F, as per RESPO Norms ( all the material used shall be Provide by the conractor), |
| 56 | Wireness Fancing of 250/630 KVA T/F. Complate |