|
| 1 | Cartage of following material from store center Meerut to JE Store including loading & unloading at both ends maximum distance up to 40 Km. :– (as per direction of Executive Engineer for Sucessful completion of work.) |
| 2 | A) PCC Pole 8.5 mrt long/PCC Pole 11 mrt long/ST pole 11 mtr long. |
| 3 | B) 11 KV XLPE Cable of Different sizes |
| 4 | C) 250 KVA T/f. |
| 5 | D) 11 KV CT/PT unit of Different size |
| 6 | E) 11 KV Jointing Kit of Different size |
| 7 | F) 11 KV Pilfer proof Cubical of Different size |
| 8 | Cartage of line material from store centre to dump site & then dump site to site of work on day to day basis, including loading & unloading at both ends maximum distance up to 20 Km. (App. 85 Qtl.) |
| 9 | Cartage of 10 KVA to 100 KVA Transformer from store centre to site of work including loading & unloading at both site |
| 10 | Cartage of following material from JE Store to site of work including loading & unloading at both ends maximum distance up to 40 Km. :– A) PCC Pole 8.5 mrt long/PCC Pole 11 mrt long/ST pole 11 mtr long. |
| 11 | B) 11 KV XLPE Cable of Different sizes |
| 12 | C) 250 KVA T/f. |
| 13 | D) 11 KV CT/PT unit of Different size |
| 14 | E) 11 KV Jointing Kit of Different size |
| 15 | F) 11 KV Pilfer proof Cubical of Different size |
| 16 | Dissmentling of Damaged & Broken P.C.C./ S.T.Pole/R.S. Joist by digging the pits & removel of complete H.T./L.T. line accessories . |
| 17 | Earthing of each 11 KV line pole & T/F properly after drive of electrodes if size 20mmx250mm and connection the earthing point with GL wire. |
| 18 | Erection ofA) PCC Pole 8.5 mrt long/PCC Pole 11 mrt long/ST pole 11 mtr long. after digging a pit of size 1.20 x 0.60 x 1.6 mtr in all type of Soil including back filling of the pole with proper ramming after completion of work. |
| 19 | Fabrication and fixing of all 11 KV H.T/L.T. line accessories. |
| 20 | Erection of Double pole on PCC pole 8.5/11 mtr.after digging of pit of required size including fabrication and fixing of Top channel, droper channel & base channel alongwith, fixing all 11 KV accessories TPMO, Fuse set 11 KV pin insulators and making connection properly. |
| 21 | Construction of new Plinth for 250 KVA |
| 22 | Providing and fixing wiremess fencing for 250 KVA |
| 23 | Water level Earthing for 250 KVA t/f neutral and body complete |
| 24 | Mounting of 10 to 100 KVA T/F with proper jumping of HT side and fixing of cable on LT. side of T/F making connection properly. |
| 25 | Making a section pole to exist pole after fabrication & fixing of T channel fixing of all 11 KV accessories. |
| 26 | Erection of stay rod complete after digging a pit of size 1.20 x 0.60 x 1.6 mtr and grouting the same in block of size 0.60 x 0.60 x 0.30 mtr and nuzzling at the both ends and filling the pit with excavated earth soil with proper ramming. |
| 27 | Laying lifting stringing of proper sagging of ACSR Weasel/Rabbit/Dog conductor for 3 phase, 3 wire 11 KV line including binding & jumpering properly. |
| 28 | Laying lifting stringing of proper sagging of 11 KV XLPE Cable of different sizes with filling jointing kit different size. |
| 29 | Laying lifting & sagging of LT line with A.B. Conductor of different size including proper binding & jumpring (3x50, 3x95, 3x120 sqmm.) |
| 30 | Laying lifting & sagging of LT line with Single Phase A.B. Conductor of size 1x16 sq.mm. including proper binding & jumpring. |
| 31 | Grouting of PCC/ST poles with Dust, Cement & Stone blast concreting. |
| 32 | Cutting & chopping tree branches near side of line for making the clearance between line and tree (near about 100 branches). |
| 33 | Fixing of LT distribution box along with providing clamp Nut & Bolts |
| 34 | Providing and fixing stay clamps . |
| 35 | Providing and fixing F Clamp |
| 36 | Providing and fixing Holding Clamp |
| 37 | Providing and fixing LT clamps . |
| 38 | Providing and fixing LTInsulator clamps . |
| 39 | Providing and fixing Piercing Clamp. |
| 40 | Providing and fixing Dead & End Clamp. |
| 41 | Providing and fixing Telless unit |
| 42 | Providing and fixing Suspension Clamp. |
| 43 | Providing and fixing Bolt and Nuts . |