| 1 | WORK |
| 2 | Cartage ofPole & material from store centrefrom any other place to the respective site of work through the Kachha Pacca road inclading the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. |
| 3 | 11 mtr. STP |
| 4 | 8.5 mtr. PCC pole |
| 5 | 25/63 Transformer |
| 6 | Safe cartage of line material viz. conductor, cable, GI earth wire, cross arm, angle, channel, insulator, clamps and other line material from store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging. |
| 7 | Erectionof single support 8.5M PCC Poles including complete. H.T/L.T fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 8 | Erectionof 11 mtr long STPincluding the work of complete H.T./L.T. fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 9 | Erectionof Double Pole support 8.5M PCC Poles including complete. H.T/L.T fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 10 | Grouting of Double Polesas per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 11 | Grouting of ST Polesas per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 12 | Grouting of PCC Polesas per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 13 | Erection and Grouting of Stay Set including the work of nozelling etc. as per RESPO manual and also including the cost of all grouting material, labour, T&P etc required for proper completion of work. |
| 14 | Laying & Sagging and Binding ACSR weasel conductor as per direction of Supervising Engineer. It including the cost of Labour T&P carrier etc required for proper completion of work. |
| 15 | Fixing of Earthing Rodas per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 16 | Straightening of tilled pole |
| 17 | Dismentling all accessories from exiting damage pole & all accessories including the cost of labour, T&P carrier etc required for proper completion of work. |
| 18 | Erection and installation of 25/63 kva T/F on DP, which been damaged under storm condition |
| 19 | Laying & Sagging and Binding AB Cable (Different Size) as per direction of Supervising Engineer. It including the cost of Labour T&P carrier etc required for proper completion of work. |
| 20 | Resagging and tightening loose conductor as per direction of Supervising Engineer. It including the cost of Labour T&P carrier etc required for proper completion of work. |
| 21 | Digging hard & Rocky Pits |
| 22 | Tree looping Chooping |