| 1 | Attendingpreventive as well as Breakdown Maintenance & Overhauling of 1350 TR RCC Cooling Towers at CAP as per the Clause No. 1 of Technical Specification. |
| 2 | Quarterly Maintenance of 8 Nos of Cooling Towers (8 Nosx 12 qtr = 96 Nos ) |
| 3 | Overhauling of 7 Nos of cooling towers in each year in contract period (5 Nos. x 3 Years = 15 Nos. and 2 Nos. x 1 Year = 2 Nos.) |
| 4 | Attendingpreventive as well as Breakdown Maintenance & Overhauling of 1000 TR FRP Cooling Tower at Boiler House as per the Clause No. 2 of Technical Specification. |
| 5 | Quarterly Maintenance of 2 Nos of Cooling Towers (2 Nos x 12 qtr = 24 Nos) |
| 6 | Overhauling of 2 Nos of cooling towers in each year in contract period (2 Nos. x 3 Years = 6 Nos.) |
| 7 | Supply, Fabrication, Installation and Commissioning of SS 304 crimped wire mesh fills assembly of size 1.2 meter length x 0.6 meter width x 0.6 meter height made with 24 layers of wire mesh of 1mm dia. with 12mmx12mm spacing as per Clause No. 3 of Technical Specifications. |
| 8 | Supply & Installation of PVC Mist Eliminators as per the Clause No. 4 of Technical Specification. |
| 9 | Supply, Installation, Testing and Commissioning of ABS Body Spray Nozzle as per Clause No. 5 of technical Specification. |
| 10 | Supply, Installation, Testing and Commissioning of 1900 mm (approx) dia. 6bladed fan with motor assembly complete with Aluminium blades, SS fan hub with welded sleeve, SS U clamps for forced draft cooling toweras per the Clause No. 6 of Technical Specification. |
| 11 | Supply, Installation, Testing and Commissioning of 1900 mm (approx) dia. 6 bladed fan with motor assembly complete with FRP blades, SS fan hub with welded sleeve, U clamps for induced draft cooling tower as per the Clause No. 7 of Technical Specifications. |
| 12 | Fabrication, Supply, Installation, Testing and Commissioning of1900 mm (approx) dia. 6 bladed fan assembly complete with Aluminium blades, SS fan hub with welded sleeve, U clamps suitable for existing forced draft cooling tower as per the Clause No. 8 of Technical Specification. |
| 13 | Fabrication, Supply, Installation, Testing and commissioning of1900 mm (approx) dia. 6 bladed fan assembly complete with FRP Blades, SS fan hub with welded sleeve, U clamps suitable for existing induced draft cooling tower as per the Clause No. 9 of Technical Specification. |
| 14 | Supply & periodic dosing of algaecide chemical in cooling tower as per the Clause No.10 of Technical Specification. |
| 15 | Supply & Installation of HDG structure as per the Clause No. 11 of Technical Specifications. |
| 16 | Supply, Installation, Testing and Commissioning of 15KVA Three Phase Synchronous Generator (750RPM), Self-excitation type with Automatic Voltage Regulator as per the Clause No. 12 of Technical Specification. |
| 17 | Attending emergency break down jobs of underground/over ground chilled water pipe line complete with pipe welding and carrying out civil work as per clause No. 13 of Technical Specifications of the tender. |
| 18 | Welding joints of different sizes of MS pipe |
| 19 | Casting of PCC (1:2:4) |
| 20 | Casting of RCC (M30 grade) |
| 21 | Excavation of dry soil including back filling and surface finishing |
| 22 | Excavation of wet soil including back filling and surface finishing |
| 23 | Excavation of rock/road cutting including back filling and surface finishing |
| 24 | Repairing of thermal insulation provided on overhead chilled water piping headers of size 18\" dia. to 30\" dia.as per the Clause No. 14 of Technical Specifications. |
| 25 | Installation, Testing and Commissioning of 500 NB gate valve in existing chiller water pipe line complete with insulation and plaster as per the Clause No. 15 of Technical Specification. |
| 26 | Cleaning of weeds at turbine inlet point at PP lake as per the Clause No. 16 of Technical Specification. |