Tender For Construction And Moderanization Of 33 11 Ss Chaudhary Charan Singh Ayodhya Pump Nahar Vikramjot 2X5 Mva Under The Edd Harraiya Basti Under The Head Of Deposit Scheme 2024 25 In Base Of Semi Ternkey - 33 KV Line items 2 Barbed Wire 3 Danger board with clamps for 33 KV 4 holding clamp 5 channel F-bracket for STP pole 6 F bracket 7 Nut and bolt 8 Red oxide paint 9 Alluminium paint 10 SS Items 11 6 Dia GI pipe3 mtr. for 33 Kv cable protection 12 24 Volt(12 volt*2) battery & Invertor / charger with cabinet for 33kv and 11 kv systems. 13 Copper Control Cable 4x2.5 mm² 14 Copper Control Cable 2x2.5 mm² 15 Transformer oil drum 16 Substation Works 17 Cartage charges complete materials of line,metering and substation. 18 Dismantalling of old switchyard structures and cc work etc. 19 Erection/grouting/Plinthing/mounting /installation/fittinng/connection of all items as requiredto complete the work with small items and works. 20 Main Bus Bar complete with structure(A-type steel structure) 21 33 KV Line Isolator 400 Amp. 22 33 KV Bus Isolator 400 Amp. 23 Structure for above 24 33 KV Post Insulator 25 Structure for above 26 33 KV Lightening Arresters 27 Structure for above 28 P.T. 33 KV 1 Ph/110 V 29 Structure for above 30 33 KVSingle T/F Control Pannel 31 33 KVdouble T/F Control Pannel 32 33kv CT 200/100/1A and 400/200/1A 33 33 kv vcb with structure 34 33 kv ct structure 35 11 KV Incoming VCB 600/300/5A 350 MVA 36 11 KV Outgoing VCB 200/100/5A 350 MVA 37 11 KV Bus Coupler 38 33kv Complete fuse set 39 Structure for above 40 250KVA 11/.4 KV T/F complete work 41 Bus bar jumering including all equipments 42 24 Volt battery(2*12 volts) & Invertor / charger with cabinet for control systems. 43 Laying of Copper Control Cable 4x2.5 mm² and 2*2.5mmsq. 44 Making interconnection drawing and connection with all protective,meteriing relays/equipments /control systems complete work. 45 Digging of Kaccha/Pakka Road for completion of work as per site req. 46 Dismounting/ dismantalling of old existing power Transformer and keeping it at suitable place including all works. 47 Plinth of foundationfor power T/F 48 Shifting/installation of 5MVA Tf on plinth complete work required as per req site condition. 49 Plinth & Foundation of VCB 50 Repairing of old permanent trench with cover as per site req. 51 construction of permanent trench base and cc wall in hanger side and brick wall 9inch in other side with cc cover of suitable sizes of 90cm depth 90cm width with installation of 2 no. parallel cable hangers made of ms angleat 1 mtr width in run as per requirement including material .(from control to pump house) and from Power TF to Control room Repairing of old permanent trench with cover as per site req. 52 Laying of 11 KV Cable Double ckt , LT cable D/C from both TF to incoming panel and outgoing panels to pump house with sand filling and cable tags,suitable size lugs etc. 53 Fabrication of cable tray of GI perforated sheet with support stand weldingat proper places for laying of cable including all material and work Repairing of old permanent trench with cover as per site req. 54 Laying of double ckt 11kv cable on existing and new cable tray double ckt complete work for outgoing panel to pump house. 55 Fabrication of cable flatform/cable rest for safely keeping standby cables in pump house and 33/11kv control room Repairing of old permanent trench with cover as per site req. 56 11 kv cable boxes coupling with switchgear and TF 57 Jointing charges off 11 kv C/J Kit 58 Earthing of S/S Outdoor equipement (Fabrication Full switchyard Earthmat) by cutting of CC work as per site req. 59 Earthing of complete Indoor equipement with 25 mm ms flat as per site req. 60 Power Transformer Delta neutral Earthing/ Body Earthing with providing neutal support(with gi pipe 1.5inch inch 40ft length of each using one copper strip at the endeand 6 mmsq. Copper wire) 61 LT transformer Earthing with 20ft gi pipe neutral and body. 62 Dismantalling of pale fencing and gate etc.of switchyard and resetting of completeion of work as per site req. 63 Outdoor Switchyard & approach road lightening with 70w led light 16 sets including LT 4*16 mmsq. cable as per requirement including supply of 4 no. branded blowers and its power wiring , sockets,switches,mcb`s etc. and also supply and exhaust arrangement 4 no. in control room with control room lighting arrangement and wiring ,supply and installation of fans etc and 1no. branded cooler arrangement as per site req. 64 Plinth of foundation for LT 250 KVA T/F in switchyard including cable stand with supply and installation of 11kv bakelite fuse system and partition wall between both TF with wire mesh fencing for two no tf as per site req. 65 painting of old and new switchyard fencing complete and switchyard structures. 66 Sub-station Name & Arrow shine Board complete(1.5*1.5 mtr. Iron sheet with stand) 67 Furniture of S/S (8 chair, 2 table(1 executuve office table and one 4*5 feet wooden table with racks), 1 bench, 2 stool),2 office chair(1 executive chair),1 chowki. 68 writing name on S/S building and all 11 KV switchgear pannels 69 T & P of S/S & switchgears (as per specifications)T & P of S/S as per specification,pliers 4 no, meggar 5 kv 1 no, wrench 1 set whole, hammer 1 no, 2 no Saw, 2 no. Axe, 2 no. long rope, 2 no. earth chain, 2 no. bamboo ladder,tongue tester, multimeter,leather bag, Ladder trolley 1 no.,safety belt 2no., pulley 1 no.,Expandable Discharge earth Rod for Earthing(01no.) 70 4.5 Kg. CO₂ fire extinguisher portable type 71 5 Kg. dry powder fire extinguisherportable type 72 Fire buckets (6 No.) with stand filled with dry sand 73 Max./Min. line diagram keyboard, hand gloves, earthing chain etc. 74 Other small items & works required to complete the work. 75 Flooring/reapairing of switchyard complete with CC work with 4 inch base with bricks and sand ,cement with 3 inch cc flooring as per site req. 76 Cable stand of MS Channel for 33 KV for Cable stand and neutral stand and grouting,errectionm,plinthing in switchyard with (3200 mm two length jointed with 4 no.intermediatechannel with clamp ) and also cable stand for 33kv incoming cable to switchyard from PPMC room. 77 Dismantalling of existing old damage switchgear panels in old control room. 78 Repairing of existing control room floor and trench complete work with materials as per site req. 79 Opening of trench cover for windup of existing cable and resetting after work completion 80 Cleaning of existing trench filled with soil and debrises, etc. 81 Laying out and windup of old and usedexisting cables complete work. 82 laying of LT cable as per requirement/instruction of pump canal officials 83 Dismounting/ dismantalling of old existing LT Transformer and keeping it at suitable place including all works. 84 Opening of cable of old switchgear panels . 85 Repairingof old switchyard fencing complete with ms flats and strips etc 86 Rubber Mat 87 Flooring of switchyard complete with CC work with 4 inch base with bricks and sand ,cement with 3 inch cc flooring 88 Labour charges for dismentalling of old xlpe cable from same route of new cable 89 Fabrication of highmast arrangement structure at STP pole for fitting of LED lights at top including all materials and also installation of LED lights with control circuit,wires and power switches, mcb`s.The work includes pole erection , grouting, painting, plinthing etc complete work and also making climbing arrangements as per site req. 90 Centrifusing and gasket change of Power Transformer as per requirement complete Work including Material,T&P and labour as per site req. 91 Installtion of capacitor bank with complete work and labour,etc. as per anx 92 Erection STP poles for lighting work complete work including all materials and also installation of LED lights with control circuit,wires and power switches, mcb`s.The work includes pole erection , grouting, painting, plinthing etc complete work and also making climbing arrangements as per site req. 93 Cleaning of site and old scrap material management as per site condition complete work. 94 Testing of S/S complete with arrangement of three phase generator,cables,etc T&P and labour. 95 Metering Work 96 Shifting, Loading & Carriage of following material on private truck at site 97 3x300 mmsq xlpe cable 98 33 KV C.T./P.T. Metering unit 99 33 KV Pilfer Proof Metering Unit 100 Mounting & Fitting of following equipment on erected structure 101 CT/PT 102 33 KV TVM 103 construction of permanent trench with cover. From CT/PT to PPMC and PPMC to Terminal Gantry including cost of sand & brick with 104 Laying of 33 KV Cable Double ckt from CT/PT to PPMC and PPMC to Terminal Gantry including cost of sand 105 Jointing charges for 33 kv jointing kit 106 Fabrication of Structure for mounting CT/PT unitwith materialwith grouting ,earthing complete work. 107 Construction of 3x3.5 mtr PPMC room with gate as per requirement including trench , 1.5 mtr wide interlocking approach road from main road and flooring,lighting arrangement,power wiring and giving connection from control room,power sockets including supply of 2no. branded blower and power switches,mcb`s complete work. 108 6 Dia GI pipe3 mtr. for 33 Kv cable protection 109 Earthing outdoor and indoor equipment with G.I. strip 110 Installation of 33 KV Pilfer Proof resistant M/C in PPMC room. 111 Other small materials and jobs to complete the work. 112 Line work 113 Erection of Poles including all work as per norms 114 Laying,spreading,sagging of ACSR dog conductor complete work. 115 cutting of tree branches 116 Fixing of stay complete with work 117 Openeningof existing damaged X Arm and f bracket 118 Fitting of new X arms,F bracket,pin insu,disc insu, etc complete work. 119 opening of jumpering, winding of pin insulator, disc insulator for tightening of loos conductor 120 Straightning of tilted poles with grouting including all work 121 Tightening/resagging of loose span including all work. 122 Rewinding of jumpering / winding of pin insulator/ disc insutor of tightening of loose conductor. 123 extra cost of pole grouting including all work. 124 Plinthing of old./new STP pole . 125 Opening and dismantalling, collecting and bundling of old and damage weasel conductor(5km line three phases). 126 Painting of STP pole 127 Gaurding work complete 128 Other small works required to complete work. 129 cartage of old scrap conductor and dumping as per instruction. 130 drawing,Design,Apporval and NOC charges of complete work.