Upgradation of the road from Karattampatti nadu Street road in Karattampatti panchayat Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
2
Collection and supply of U.S. Gravel from approved site including cost and conveyance of all materials to site and stacking to departmental gauge for takingremeasurements including all labour charges for spreading in berms etc., complete in Base course.
3
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
4
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
5
Providing and laying Tack Coat Over the WMM Surface using 2.5Kg of Emulsion bitumen and binder for 10 Sqm. Area including cost and conveyanceof bitumen which will be supplied departmentally at departmental section store at Union Office and cost of the same which will be recovered fro the contractor`s bill at the rates specified in the special condition appended herewith including conveyance of bitumen from section stores to worksite handling charges of bitumen at both ends and including all labour charges for cleaning the surface before the application of bitumen binder labour charges for applying tack coat uniformly including hire charges of bitumen sprayer and all other tools and plants employed and also as directed by the Engineer incharge and all other incidental Charges etc., complete as per clause 505 of most specifications.
6
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat \"A\" over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rollingseparately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges formini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
7
Provision for Name board etc.,
8
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package}
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.