Sales : +91-777 804 8217
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 17-06-2025 | corrigendom | Other | 23-06-2025 |
| Sl. No. | Item Description |
| 1 | PART - A (Road work) |
| 2 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlierand disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201.By Mechanical Means In area of thorny jungle |
| 3 | Renewal of Non Patchable road Basai Gheeyaram to Sultanpur km0/0 to 2/0 |
| 4 | Renewal of Non Patchable Road A/R to Dan km 0/0 to 2/0 |
| 5 | Construction of missing link road Dandoli village to Govt. college maniya upto NH-44km 0/0 to 0/700 |
| 6 | Renewal ofroadDharampura to Kalyanpura km 0/0 t0 0/200 |
| 7 | Renewal of Non Patchable Road Kherli to Balgovind ka pura km 0/0 to 1/000 |
| 8 | Renewal of Non Patchable Road Kotpura to Harpoolpura km 0/0 to 1/000 |
| 9 | Renewal of Non Patchable Road Lathwali mata to Khubipura km 0/0 to 1/200 |
| 10 | Renewal of Non Patchable Road Mankhaki to Bichola km 0/0 to 1/000 |
| 11 | Renewal of Non Patchable Road A/R Mishriyapura km 1/0 to 2/300 |
| 12 | Construction of Missing link road from Nagarghata to Rehnawali Mata km 0/0 to 1/500 |
| 13 | Renewal ofroadDandolivillage toNH-3 |
| 14 | Renewal of Non Patchable road Phoolpur road to Kasgang school 0/0 to 1/500 |
| 15 | Renewal of Non Patchable Road Pipri to Tomaro ki Madhaiya km 0/0 to 1/500 |
| 16 | Renewal of Non Patchable Road Shahpura Radhepura to Padmapura km 1/300 to 2/300 |
| 17 | Renewal of Non Patchable Road Tor Shankara to Madhabhau km 0/0 to 1/500 |
| 18 | Renewal of Non Patchable Road Virondha to Rawatpura km 0/0 to 2/0 |
| 19 | Kherali Kotpura Road to Baldevkapura km 0/0 to 1/500 |
| 20 | Renewal of Non Patchable Road A/R to Nagarghata km 0/0 to 1/600 |
| 21 | Construction of missing link road Beeech Ka Pura Jatav Basti Suresh ke Makan to Jatav Basti Beechkapura GP Ghanedi Km 0/0 to 1/0 |
| 22 | Renewal ofroad Buchapura to Latiyapura km 0/0 t0 1/00 |
| 23 | Renewal of Non Patchable Road A/R to Chandiyan ka pura km 0/0 to 0/400 |
| 24 | Renewal of Non Patchable A/R Road Shrinagar to Chhitapura 0/0 to 1/800 |
| 25 | Construction of missing link road Dharapura Jarah Road to Dalelkapura SchoolKm 0/0 to 1/500 |
| 26 | Construction of Missing link road from Gwalmatolawala Pul to Kolipura km 0/0 to 1/500 |
| 27 | Construction of Missing link road from Kathuamara to Kareelpur km 0/0 to 1/00 |
| 28 | Renewal of Non Patchable Road A/R to Nagar km 2/0 to 5/0 |
| 29 | Construction of missing link road Karan Singh ki Madaiya to Mankhaki via Pinku ki Madaiya |
| 30 | Construction of missing link road Sikroda road to Ramsingh thaarkm 0/0 to 1/500 |
| 31 | Renewal of Non Patchable Road A/R Samona km 2/0 to 4/0 |
| 32 | Renewal of Non Patchable road Didwar to Shreepalkigadikm0/0 to 1/200 |
| 33 | Renewal of Non Patchable A/R to Shrinagar 0/0 to 0/600 |
| 34 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300-1 and 300-2 with a lead upto 50 m as per MoRTH Specification Clause 305.3 |
| 35 | Renewal of Non Patchable road Basai Gheeyaram to Sultanpur km0/0 to 2/0 |
| 36 | Renewal of Non Patchable Road A/R to Dan km 0/0 to 2/0 |
| 37 | Construction of missing link road Dandoli village to Govt. college maniya upto NH-44km 0/0 to 0/700 |
| 38 | Renewal ofroadDharampura to Kalyanpura km 0/0 t0 0/200 |
| 39 | Renewal of Non Patchable Road Kherli to Balgovind ka pura km 0/0 to 1/000 |
| 40 | Renewal of Non Patchable Road Kotpura to Harpoolpura km 0/0 to 1/000 |
| 41 | Renewal of Non Patchable Road Lathwali mata to Khubipura km 0/0 to 1/200 |
| 42 | Renewal of Non Patchable A/R road Machhariyakm0/0 to 0/700 |
| 43 | Renewal of Non Patchable Road Mankhaki to Bichola km 0/0 to 1/000 |
| 44 | Renewal of Non Patchable Road A/R Mishriyapura km 1/0 to 2/300 |
| 45 | Construction of Missing link road from Nagarghata to Rehnawali Mata km 0/0 to 1/500 |
| 46 | Renewal ofroadDandolivillage toNH-3 |
| 47 | Renewal of Non Patchable road Phoolpur road to Kasgang school 0/0 to 1/500 |
| 48 | Renewal of Non Patchable Road Pipri to Tomaro ki Madhaiya km 0/0 to 1/500 |
| 49 | Renewal of Non Patchable Road Shahpura Radhepura to Padmapura km 1/300 to 2/300 |
| 50 | Renewal of Non Patchable Road Tor Shankara to Madhabhau km 0/0 to 1/500 |
| 51 | Renewal of Non Patchable Road Virondha to Rawatpura km 0/0 to 2/0 |
| 52 | Kherali Kotpura Road to Baldevkapura km 0/0 to 1/500 |
| 53 | Renewal of Non Patchable Road A/R to Nagarghata km 0/0 to 1/600 |
| 54 | Construction of missing link road Beeech Ka Pura Jatav Basti Suresh ke Makan to Jatav Basti Beechkapura GP Ghanedi Km 0/0 to 1/0 |
| 55 | Renewal ofroad Buchapura to Latiyapura km 0/0 t0 1/00 |
| 56 | Renewal of Non Patchable Road A/R to Chandiyan ka pura km 0/0 to 0/400 |
| 57 | Renewal of Non Patchable A/R Road Shrinagar to Chhitapura 0/0 to 1/800 |
| 58 | Construction of missing link road Dharapura Jarah Road to Dalelkapura SchoolKm 0/0 to 1/500 |
| 59 | Construction of Missing link road from Gwalmatolawala Pul to Kolipura km 0/0 to 1/500 |
| 60 | Construction of Missing link road from Kathuamara to Kareelpur km 0/0 to 1/00 |
| 61 | Renewal of Non Patchable Road A/R to Nagar km 2/0 to 5/0 |
| 62 | Construction of missing link road Karan Singh ki Madaiya to Mankhaki via Pinku ki Madaiya |
| 63 | Construction of missing link road Sikroda road to Ramsingh thaarkm 0/0 to 1/500 |
| 64 | Renewal of Non Patchable Road A/R Samona km 2/0 to 4/0 |
| 65 | Renewal of Non Patchable road Didwar to Shreepalkigadikm0/0 to 1/200 |
| 66 | Renewal of Non Patchable A/R to Shrinagar 0/0 to 0/600 |
| 67 | Providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per Table 400-1,400-2 or any other course material as per design mix, as per CBR in sub base course including premixing the material at OMC in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader F.E loader on a prepared base and compacting with vibratory roller to achieve desired density (as per I.S.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[MoRTH specification : Clause 401]. By mechanical means.For Grading-I Material |
| 68 | Construction of missing link road Dandoli village to Govt. college maniya upto NH-44km 0/0 to 0/700 |
| 69 | Renewal ofroadDharampura to Kalyanpura km 0/0 t0 0/200 |
| 70 | Renewal of Non Patchable A/R road Machhariyakm0/0 to 0/700 |
| 71 | Construction of Missing link road from Nagarghata to Rehnawali Mata km 0/0 to 1/500 |
| 72 | Renewal ofroadDandolivillage toNH-3 |
| 73 | Renewal of Non Patchable road Phoolpur road to Kasgang school 0/0 to 1/500 |
| 74 | Construction of missing link road Beeech Ka Pura Jatav Basti Suresh ke Makan to Jatav Basti Beechkapura GP Ghanedi Km 0/0 to 1/0 |
| 75 | Renewal ofroad Buchapura to Latiyapura km 0/0 t0 1/00 |
| 76 | Renewal of Non Patchable Road A/R to Chandiyan ka pura km 0/0 to 0/400 |
| 77 | Construction of missing link road Dharapura Jarah Road to Dalelkapura SchoolKm 0/0 to 1/500 |
| 78 | Construction of Missing link road from Gwalmatolawala Pul to Kolipura km 0/0 to 1/500 |
| 79 | Construction of Missing link road from Kathuamara to Kareelpur km 0/0 to 1/00 |
| 80 | Construction of missing link road Karan Singh ki Madaiya to Mankhaki via Pinku ki Madaiya |
| 81 | Construction of missing link road Sikroda road to Ramsingh thaarkm 0/0 to 1/500 |
| 82 | Maintenance of WBM road including filling up of pot holes, ruts and rectifying corrugated surface, damaged edges and ravelling as per MoRTH specification Clause 404 |
| 83 | Renewal ofroadDandolivillage toNH-3 |
| 84 | Renewal of Non Patchable road Phoolpur road to Kasgang school 0/0 to 1/500 |
| 85 | Renewal ofroad Buchapura to Latiyapura km 0/0 t0 1/00 |
| 86 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smoothwheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening & binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 1 as per MoRTH Specification Clause 404.Using Crusher Broken Aggregate, By Mechanical Means |
| 87 | Construction of missing link road Dandoli village to Govt. college maniya upto NH-44km 0/0 to 0/700 |
| 88 | Renewal ofroadDharampura to Kalyanpura km 0/0 t0 0/200 |
| 89 | Renewal of Non Patchable road Phoolpur road to Kasgang school 0/0 to 1/500 |
| 90 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with threewheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per MoRTH Specification Clause 404. Using Crusher Broken aggregate By Mechanical Means |
| 91 | Construction of missing link road Dandoli village to Govt. college maniya upto NH-44km 0/0 to 0/700 |
| 92 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smoothwheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening & binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 1 as per MoRTH Specification Clause 404. Using Crusher Broken Aggregate |
| 93 | Construction of Missing link road from Nagarghata to Rehnawali Mata km 0/0 to 1/500 |
| 94 | Construction of missing link road Beeech Ka Pura Jatav Basti Suresh ke Makan to Jatav Basti Beechkapura GP Ghanedi Km 0/0 to 1/0 |
| 95 | Construction of missing link road Dharapura Jarah Road to Dalelkapura SchoolKm 0/0 to 1/500 |
| 96 | Construction of Missing link road from Gwalmatolawala Pul to Kolipura km 0/0 to 1/500 |
| 97 | Construction of Missing link road from Kathuamara to Kareelpur km 0/0 to 1/00 |
| 98 | Construction of missing link road Karan Singh ki Madaiya to Mankhaki via Pinku ki Madaiya |
| 99 | Construction of missing link road Sikroda road to Ramsingh thaarkm 0/0 to 1/500 |
| 100 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per MoRTH Specification Clause 401. FOR GRADING I Material |
| 101 | Renewal of Non Patchable road Basai Gheeyaram to Sultanpur km0/0 to 2/0 |
| 102 | Renewal of Non Patchable Road A/R to Dan km 0/0 to 2/0 |
| 103 | Renewal of Non Patchable Road Kherli to Balgovind ka pura km 0/0 to 1/000 |
| 104 | Renewal of Non Patchable Road Kotpura to Harpoolpura km 0/0 to 1/000 |
| 105 | Renewal of Non Patchable Road Lathwali mata to Khubipura km 0/0 to 1/200 |
| 106 | Renewal of Non Patchable Road Mankhaki to Bichola km 0/0 to 1/000 |
| 107 | Renewal of Non Patchable Road A/R Mishriyapura km 1/0 to 2/300 |
| 108 | Renewal of Non Patchable Road Pipri to Tomaro ki Madhaiya km 0/0 to 1/500 |
| 109 | Renewal of Non Patchable Road Shahpura Radhepura to Padmapura km 1/300 to 2/300 |
| 110 | Renewal of Non Patchable Road Tor Shankara to Madhabhau km 0/0 to 1/500 |
| 111 | Renewal of Non Patchable Road Virondha to Rawatpura km 0/0 to 2/0 |
| 112 | Kherali Kotpura Road to Baldevkapura km 0/0 to 1/500 |
| 113 | Renewal of Non Patchable Road A/R to Nagarghata km 0/0 to 1/600 |
| 114 | Renewal of Non Patchable A/R Road Shrinagar to Chhitapura 0/0 to 1/800 |
| 115 | Renewal of Non Patchable Road A/R to Nagar km 2/0 to 5/0 |
| 116 | Renewal of Non Patchable Road A/R Samona km 2/0 to 4/0 |
| 117 | Renewal of Non Patchable road Didwar to Shreepalkigadikm0/0 to 1/200 |
| 118 | Renewal of Non Patchable A/R to Shrinagar 0/0 to 0/600 |
| 119 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smoothwheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per MoRTH Specification Clause 404. using Crusher borken aggregate |
| 120 | Renewal of Non Patchable road Basai Gheeyaram to Sultanpur km0/0 to 2/0 |
| 121 | Renewal of Non Patchable Road A/R to Dan km 0/0 to 2/0 |
| 122 | Renewal of Non Patchable Road Kherli to Balgovind ka pura km 0/0 to 1/000 |
| 123 | Renewal of Non Patchable Road Kotpura to Harpoolpura km 0/0 to 1/000 |
| 124 | Renewal of Non Patchable Road Lathwali mata to Khubipura km 0/0 to 1/200 |
| 125 | Renewal of Non Patchable A/R road Machhariyakm0/0 to 0/700 |
| 126 | Renewal of Non Patchable Road Mankhaki to Bichola km 0/0 to 1/000 |
| 127 | Renewal of Non Patchable Road A/R Mishriyapura km 1/0 to 2/300 |
| 128 | Construction of Missing link road from Nagarghata to Rehnawali Mata km 0/0 to 1/500 |
| 129 | Renewal of Non Patchable Road Pipri to Tomaro ki Madhaiya km 0/0 to 1/500 |
| 130 | Renewal of Non Patchable Road Shahpura Radhepura to Padmapura km 1/300 to 2/300 |
| 131 | Renewal of Non Patchable Road Tor Shankara to Madhabhau km 0/0 to 1/500 |
| 132 | Renewal of Non Patchable Road Virondha to Rawatpura km 0/0 to 2/0 |
| 133 | Kherali Kotpura Road to Baldevkapura km 0/0 to 1/500 |
| 134 | Renewal of Non Patchable Road A/R to Nagarghata km 0/0 to 1/600 |
| 135 | Construction of missing link road Beeech Ka Pura Jatav Basti Suresh ke Makan to Jatav Basti Beechkapura GP Ghanedi Km 0/0 to 1/0 |
| 136 | Renewal of Non Patchable Road A/R to Chandiyan ka pura km 0/0 to 0/400 |
| 137 | Renewal of Non Patchable A/R Road Shrinagar to Chhitapura 0/0 to 1/800 |
| 138 | Construction of missing link road Dharapura Jarah Road to Dalelkapura SchoolKm 0/0 to 1/500 |
| 139 | Construction of Missing link road from Gwalmatolawala Pul to Kolipura km 0/0 to 1/500 |
| 140 | Construction of Missing link road from Kathuamara to Kareelpur km 0/0 to 1/00 |
| 141 | Renewal of Non Patchable Road A/R to Nagar km 2/0 to 5/0 |
| 142 | Construction of missing link road Karan Singh ki Madaiya to Mankhaki via Pinku ki Madaiya |
| 143 | Construction of missing link road Sikroda road to Ramsingh thaarkm 0/0 to 1/500 |
| 144 | Renewal of Non Patchable Road A/R Samona km 2/0 to 4/0 |
| 145 | Renewal of Non Patchable road Didwar to Shreepalkigadikm0/0 to 1/200 |
| 146 | Renewal of Non Patchable A/R to Shrinagar 0/0 to 0/600 |
| 147 | PART - B (BT work) |
| 148 | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base(WBM/WMM) including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per MoRTH Specification Clause 502 |
| 149 | Construction of missing link road Dandoli village to Govt. college maniya upto NH-44km 0/0 to 0/700 |
| 150 | Construction of Missing link road from Nagarghata to Rehnawali Mata km 0/0 to 1/500 |
| 151 | Renewal of Non Patchable road Phoolpur road to Kasgang school 0/0 to 1/500 |
| 152 | Renewal of Non Patchable Road A/R to Nagarghata km 0/0 to 1/600 |
| 153 | Construction of missing link road Beeech Ka Pura Jatav Basti Suresh ke Makan to Jatav Basti Beechkapura GP Ghanedi Km 0/0 to 1/0 |
| 154 | Construction of missing link road Dharapura Jarah Road to Dalelkapura SchoolKm 0/0 to 1/500 |
| 155 | Construction of Missing link road from Gwalmatolawala Pul to Kolipura km 0/0 to 1/500 |
| 156 | Construction of Missing link road from Kathuamara to Kareelpur km 0/0 to 1/00 |
| 157 | Construction of missing link road Karan Singh ki Madaiya to Mankhaki via Pinku ki Madaiya |
| 158 | Construction of missing link road Sikroda road to Ramsingh thaarkm 0/0 to 1/500 |
| 159 | Providing and applying tack coat with Bitumen emulsion (RS-1)using emulsiondistributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per MoRTH Specification Clause 503. |
| 160 | Renewal of Non Patchable road Basai Gheeyaram to Sultanpur km0/0 to 2/0 |
| 161 | Renewal of Non Patchable Road A/R to Dan km 0/0 to 2/0 |
| 162 | Construction of missing link road Dandoli village to Govt. college maniya upto NH-44km 0/0 to 0/700 |
| 163 | Renewal of Non Patchable Road Kherli to Balgovind ka pura km 0/0 to 1/000 |
| 164 | Renewal of Non Patchable Road Kotpura to Harpoolpura km 0/0 to 1/000 |
| 165 | Renewal of Non Patchable Road Lathwali mata to Khubipura km 0/0 to 1/200 |
| 166 | Renewal of Non Patchable Road Mankhaki to Bichola km 0/0 to 1/000 |
| 167 | Renewal of Non Patchable Road A/R Mishriyapura km 1/0 to 2/300 |
| 168 | Construction of Missing link road from Nagarghata to Rehnawali Mata km 0/0 to 1/500 |
| 169 | Renewal ofroadDandolivillage toNH-3 |
| 170 | Renewal of Non Patchable road Phoolpur road to Kasgang school 0/0 to 1/500 |
| 171 | Renewal of Non Patchable Road Pipri to Tomaro ki Madhaiya km 0/0 to 1/500 |
| 172 | Renewal of Non Patchable Road Shahpura Radhepura to Padmapura km 1/300 to 2/300 |
| 173 | Renewal of Non Patchable Road Tor Shankara to Madhabhau km 0/0 to 1/500 |
| 174 | Renewal of Non Patchable Road Virondha to Rawatpura km 0/0 to 2/0 |
| 175 | Kherali Kotpura Road to Baldevkapura km 0/0 to 1/500 |
| 176 | Renewal of Non Patchable Road A/R to Nagarghata km 0/0 to 1/600 |
| 177 | Construction of missing link road Beeech Ka Pura Jatav Basti Suresh ke Makan to Jatav Basti Beechkapura GP Ghanedi Km 0/0 to 1/0 |
| 178 | Renewal ofroad Buchapura to Latiyapura km 0/0 t0 1/00 |
| 179 | Renewal of Non Patchable A/R Road Shrinagar to Chhitapura 0/0 to 1/800 |
| 180 | Construction of missing link road Dharapura Jarah Road to Dalelkapura SchoolKm 0/0 to 1/500 |
| 181 | Construction of Missing link road from Gwalmatolawala Pul to Kolipura km 0/0 to 1/500 |
| 182 | Construction of Missing link road from Kathuamara to Kareelpur km 0/0 to 1/00 |
| 183 | Renewal of Non Patchable Road A/R to Nagar km 2/0 to 5/0 |
| 184 | Construction of missing link road Karan Singh ki Madaiya to Mankhaki via Pinku ki Madaiya |
| 185 | Construction of missing link road Sikroda road to Ramsingh thaarkm 0/0 to 1/500 |
| 186 | Renewal of Non Patchable Road A/R Samona km 2/0 to 4/0 |
| 187 | Renewal of Non Patchable road Didwar to Shreepalkigadikm0/0 to 1/200 |
| 188 | Renewal of Non Patchable A/R to Shrinagar 0/0 to 0/600 |
| 189 | Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using Viscosity grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per MoRTH Specification Clause 510.Case - IIBy Mechanical Means Bitumen (VG-30) |
| 190 | Renewal of Non Patchable road Basai Gheeyaram to Sultanpur km0/0 to 2/0 |
| 191 | Renewal of Non Patchable Road A/R to Dan km 0/0 to 2/0 |
| 192 | Construction of missing link road Dandoli village to Govt. college maniya upto NH-44km 0/0 to 0/700 |
| 193 | Renewal of Non Patchable Road Kherli to Balgovind ka pura km 0/0 to 1/000 |
| 194 | Renewal of Non Patchable Road Kotpura to Harpoolpura km 0/0 to 1/000 |
| 195 | Renewal of Non Patchable Road Lathwali mata to Khubipura km 0/0 to 1/200 |
| 196 | Renewal of Non Patchable Road Mankhaki to Bichola km 0/0 to 1/000 |
| 197 | Renewal of Non Patchable Road A/R Mishriyapura km 1/0 to 2/300 |
| 198 | Construction of Missing link road from Nagarghata to Rehnawali Mata km 0/0 to 1/500 |
| 199 | Renewal ofroadDandolivillage toNH-3 |
| 200 | Renewal of Non Patchable road Phoolpur road to Kasgang school 0/0 to 1/500 |
| 201 | Renewal of Non Patchable Road Pipri to Tomaro ki Madhaiya km 0/0 to 1/500 |
| 202 | Renewal of Non Patchable Road Shahpura Radhepura to Padmapura km 1/300 to 2/300 |
| 203 | Renewal of Non Patchable Road Tor Shankara to Madhabhau km 0/0 to 1/500 |
| 204 | Renewal of Non Patchable Road Virondha to Rawatpura km 0/0 to 2/0 |
| 205 | Kherali Kotpura Road to Baldevkapura km 0/0 to 1/500 |
| 206 | Renewal of Non Patchable Road A/R to Nagarghata km 0/0 to 1/600 |
| 207 | Construction of missing link road Beeech Ka Pura Jatav Basti Suresh ke Makan to Jatav Basti Beechkapura GP Ghanedi Km 0/0 to 1/0 |
| 208 | Renewal ofroad Buchapura to Latiyapura km 0/0 t0 1/00 |
| 209 | Renewal of Non Patchable A/R Road Shrinagar to Chhitapura 0/0 to 1/800 |
| 210 | Construction of missing link road Dharapura Jarah Road to Dalelkapura SchoolKm 0/0 to 1/500 |
| 211 | Construction of Missing link road from Gwalmatolawala Pul to Kolipura km 0/0 to 1/500 |
| 212 | Construction of Missing link road from Kathuamara to Kareelpur km 0/0 to 1/00 |
| 213 | Renewal of Non Patchable Road A/R to Nagar km 2/0 to 5/0 |
| 214 | Construction of missing link road Karan Singh ki Madaiya to Mankhaki via Pinku ki Madaiya |
| 215 | Construction of missing link road Sikroda road to Ramsingh thaarkm 0/0 to 1/500 |
| 216 | Renewal of Non Patchable Road A/R Samona km 2/0 to 4/0 |
| 217 | Renewal of Non Patchable road Didwar to Shreepalkigadikm0/0 to 1/200 |
| 218 | Renewal of Non Patchable A/R to Shrinagar 0/0 to 0/600 |
| 219 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per MoRTH Specification Clause 511By Mechanical Means Bitumen (VG-30) |
| 220 | Renewal of Non Patchable road Basai Gheeyaram to Sultanpur km0/0 to 2/0 |
| 221 | Renewal of Non Patchable Road A/R to Dan km 0/0 to 2/0 |
| 222 | Construction of missing link road Dandoli village to Govt. college maniya upto NH-44km 0/0 to 0/700 |
| 223 | Renewal of Non Patchable Road Kherli to Balgovind ka pura km 0/0 to 1/000 |
| 224 | Renewal of Non Patchable Road Kotpura to Harpoolpura km 0/0 to 1/000 |
| 225 | Renewal of Non Patchable Road Lathwali mata to Khubipura km 0/0 to 1/200 |
| 226 | Renewal of Non Patchable Road Mankhaki to Bichola km 0/0 to 1/000 |
| 227 | Renewal of Non Patchable Road A/R Mishriyapura km 1/0 to 2/300 |
| 228 | Construction of Missing link road from Nagarghata to Rehnawali Mata km 0/0 to 1/500 |
| 229 | Renewal ofroadDandolivillage toNH-3 |
| 230 | Renewal of Non Patchable road Phoolpur road to Kasgang school 0/0 to 1/500 |
| 231 | Renewal of Non Patchable Road Pipri to Tomaro ki Madhaiya km 0/0 to 1/500 |
| 232 | Renewal of Non Patchable Road Shahpura Radhepura to Padmapura km 1/300 to 2/300 |
| 233 | Renewal of Non Patchable Road Tor Shankara to Madhabhau km 0/0 to 1/500 |
| 234 | Renewal of Non Patchable Road Virondha to Rawatpura km 0/0 to 2/0 |
| 235 | Kherali Kotpura Road to Baldevkapura km 0/0 to 1/500 |
| 236 | Renewal of Non Patchable Road A/R to Nagarghata km 0/0 to 1/600 |
| 237 | Construction of missing link road Beeech Ka Pura Jatav Basti Suresh ke Makan to Jatav Basti Beechkapura GP Ghanedi Km 0/0 to 1/0 |
| 238 | Renewal ofroad Buchapura to Latiyapura km 0/0 t0 1/00 |
| 239 | Renewal of Non Patchable A/R Road Shrinagar to Chhitapura 0/0 to 1/800 |
| 240 | Construction of missing link road Dharapura Jarah Road to Dalelkapura SchoolKm 0/0 to 1/500 |
| 241 | Construction of Missing link road from Gwalmatolawala Pul to Kolipura km 0/0 to 1/500 |
| 242 | Construction of Missing link road from Kathuamara to Kareelpur km 0/0 to 1/00 |
| 243 | Renewal of Non Patchable Road A/R to Nagar km 2/0 to 5/0 |
| 244 | Construction of missing link road Karan Singh ki Madaiya to Mankhaki via Pinku ki Madaiya |
| 245 | Construction of missing link road Sikroda road to Ramsingh thaarkm 0/0 to 1/500 |
| 246 | Renewal of Non Patchable Road A/R Samona km 2/0 to 4/0 |
| 247 | Renewal of Non Patchable road Didwar to Shreepalkigadikm0/0 to 1/200 |
| 248 | Renewal of Non Patchable A/R to Shrinagar 0/0 to 0/600 |
| 249 | PART - C (CC work) |
| 250 | Dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately |
| 251 | Construction of Missing link road from Nagarghata to Rehnawali Mata km 0/0 to 1/500 |
| 252 | Renewal of Non Patchable Road A/R to Chandiyan ka pura km 0/0 to 0/400 |
| 253 | Providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per Table 400-1,400-2 or any other course material as per design mix, as per CBR in sub base course including premixing the material at OMC in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader F.E loader on a prepared base and compacting with vibratory roller to achieve desired density (as per I.S.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[MoRTH specification : Clause 401]. By mechanical means.For Grading-I Material |
| 254 | Renewal of Non Patchable road Basai Gheeyaram to Sultanpur km0/0 to 2/0 |
| 255 | Renewal of Non Patchable Road Kherli to Balgovind ka pura km 0/0 to 1/000 |
| 256 | Renewal of Non Patchable Road Kotpura to Harpoolpura km 0/0 to 1/000 |
| 257 | Renewal of Non Patchable Road Mankhaki to Bichola km 0/0 to 1/000 |
| 258 | Construction of Missing link road from Nagarghata to Rehnawali Mata km 0/0 to 1/500 |
| 259 | Renewal of Non Patchable Road Pipri to Tomaro ki Madhaiya km 0/0 to 1/500 |
| 260 | Renewal of Non Patchable Road Tor Shankara to Madhabhau km 0/0 to 1/500 |
| 261 | Renewal of Non Patchable Road A/R to Nagarghata km 0/0 to 1/600 |
| 262 | Construction of missing link road Beeech Ka Pura Jatav Basti Suresh ke Makan to Jatav Basti Beechkapura GP Ghanedi Km 0/0 to 1/0 |
| 263 | Renewal of Non Patchable A/R Road Shrinagar to Chhitapura 0/0 to 1/800 |
| 264 | Construction of missing link road Dharapura Jarah Road to Dalelkapura SchoolKm 0/0 to 1/500 |
| 265 | Construction of Missing link road from Kathuamara to Kareelpur km 0/0 to 1/00 |
| 266 | Renewal of Non Patchable Road A/R to Nagar km 2/0 to 5/0 |
| 267 | Construction of missing link road Karan Singh ki Madaiya to Mankhaki via Pinku ki Madaiya |
| 268 | Construction of missing link road Sikroda road to Ramsingh thaarkm 0/0 to 1/500 |
| 269 | Renewal of Non Patchable Road A/R Samona km 2/0 to 4/0 |
| 270 | Renewal of Non Patchable road Didwar to Shreepalkigadikm0/0 to 1/200 |
| 271 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smoothwheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per MoRTH Specification Clause 404. using Crusher borken aggregate |
| 272 | Renewal of Non Patchable road Basai Gheeyaram to Sultanpur km0/0 to 2/0 |
| 273 | Renewal of Non Patchable Road Kherli to Balgovind ka pura km 0/0 to 1/000 |
| 274 | Renewal of Non Patchable Road Kotpura to Harpoolpura km 0/0 to 1/000 |
| 275 | Renewal of Non Patchable Road Lathwali mata to Khubipura km 0/0 to 1/200 |
| 276 | Renewal of Non Patchable Road Mankhaki to Bichola km 0/0 to 1/000 |
| 277 | Construction of Missing link road from Nagarghata to Rehnawali Mata km 0/0 to 1/500 |
| 278 | Renewal of Non Patchable Road Pipri to Tomaro ki Madhaiya km 0/0 to 1/500 |
| 279 | Renewal of Non Patchable Road Tor Shankara to Madhabhau km 0/0 to 1/500 |
| 280 | Renewal of Non Patchable Road A/R to Nagarghata km 0/0 to 1/600 |
| 281 | Construction of missing link road Beeech Ka Pura Jatav Basti Suresh ke Makan to Jatav Basti Beechkapura GP Ghanedi Km 0/0 to 1/0 |
| 282 | Renewal of Non Patchable A/R Road Shrinagar to Chhitapura 0/0 to 1/800 |
| 283 | Construction of missing link road Dharapura Jarah Road to Dalelkapura SchoolKm 0/0 to 1/500 |
| 284 | Construction of Missing link road from Kathuamara to Kareelpur km 0/0 to 1/00 |
| 285 | Renewal of Non Patchable Road A/R to Nagar km 2/0 to 5/0 |
| 286 | Construction of missing link road Karan Singh ki Madaiya to Mankhaki via Pinku ki Madaiya |
| 287 | Construction of missing link road Sikroda road to Ramsingh thaarkm 0/0 to 1/500 |
| 288 | Renewal of Non Patchable Road A/R Samona km 2/0 to 4/0 |
| 289 | Renewal of Non Patchable road Didwar to Shreepalkigadikm0/0 to 1/200 |
| 290 | Construction ofun-reinforced , plain cement concrete pavement M30 (Grade), thickness as per design, over a prepared sub base, with 43/53 grade cementas per Clause 602.2.2 , coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a in fullyautomatic Batching Plant andtransported to site intransit mixer for having continous agitated mixer, manufactured as per approved mix designincluding pumping of R.M.C. from transit mixer to site of laying , with all lead and lift including cost of admixtures in recommended portion as per IS 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer in charge laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using Fixed Form Paver and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days using water finishing to lines and grade as per drawingand MoRTH Specification Clause 602 including vaccum dewatering process with all required equipments (Dowel Bars will be paid seprately). |
| 291 | Renewal of Non Patchable road Basai Gheeyaram to Sultanpur km0/0 to 2/0 |
| 292 | Construction of missing link road Dandoli village to Govt. college maniya upto NH-44km 0/0 to 0/700 |
| 293 | Renewal ofroadDharampura to Kalyanpura km 0/0 t0 0/200 |
| 294 | Renewal of Non Patchable Road Kherli to Balgovind ka pura km 0/0 to 1/000 |
| 295 | Renewal of Non Patchable Road Kotpura to Harpoolpura km 0/0 to 1/000 |
| 296 | Renewal of Non Patchable Road Lathwali mata to Khubipura km 0/0 to 1/200 |
| 297 | Renewal of Non Patchable A/R road Machhariyakm0/0 to 0/700 |
| 298 | Renewal of Non Patchable Road Mankhaki to Bichola km 0/0 to 1/000 |
| 299 | Renewal of Non Patchable Road A/R Mishriyapura km 1/0 to 2/300 |
| 300 | Construction of Missing link road from Nagarghata to Rehnawali Mata km 0/0 to 1/500 |
| 301 | Renewal ofroadDandolivillage toNH-3 |
| 302 | Renewal of Non Patchable road Phoolpur road to Kasgang school 0/0 to 1/500 |
| 303 | Renewal of Non Patchable Road Pipri to Tomaro ki Madhaiya km 0/0 to 1/500 |
| 304 | Renewal of Non Patchable Road Shahpura Radhepura to Padmapura km 1/300 to 2/300 |
| 305 | Renewal of Non Patchable Road Tor Shankara to Madhabhau km 0/0 to 1/500 |
| 306 | Renewal of Non Patchable Road Virondha to Rawatpura km 0/0 to 2/0 |
| 307 | Renewal of Non Patchable Road A/R to Nagarghata km 0/0 to 1/600 |
| 308 | Construction of missing link road Beeech Ka Pura Jatav Basti Suresh ke Makan to Jatav Basti Beechkapura GP Ghanedi Km 0/0 to 1/0 |
| 309 | Renewal ofroad Buchapura to Latiyapura km 0/0 t0 1/00 |
| 310 | Renewal of Non Patchable Road A/R to Chandiyan ka pura km 0/0 to 0/400 |
| 311 | Renewal of Non Patchable A/R Road Shrinagar to Chhitapura 0/0 to 1/800 |
| 312 | Construction of missing link road Dharapura Jarah Road to Dalelkapura SchoolKm 0/0 to 1/500 |
| 313 | Construction of Missing link road from Kathuamara to Kareelpur km 0/0 to 1/00 |
| 314 | Renewal of Non Patchable Road A/R to Nagar km 2/0 to 5/0 |
| 315 | Construction of missing link road Karan Singh ki Madaiya to Mankhaki via Pinku ki Madaiya |
| 316 | Construction of missing link road Sikroda road to Ramsingh thaarkm 0/0 to 1/500 |
| 317 | Renewal of Non Patchable Road A/R Samona km 2/0 to 4/0 |
| 318 | Renewal of Non Patchable road Didwar to Shreepalkigadikm0/0 to 1/200 |
| 319 | Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructrue complete as per drawings and MoRTH specification Clauses 1009,1600 & 2202 |
| 320 | Renewal of Non Patchable Road A/R to Chandiyan ka pura km 0/0 to 0/400 |
| 321 | Providing and fixing in position pipe railing consisting of IS Rolled steel joist posts designation IS MB 100 (100x75) at 2.5 m interval and three rows of 50 mm dia steel pipes (light) including fixing in position on bridge deck complete as per drawing and MoRTH specifications Clause 2703.2 |
| 322 | Renewal of Non Patchable Road A/R to Chandiyan ka pura km 0/0 to 0/400 |
| 323 | PART - D (Syphon work) |
| 324 | Earthwork in excavation for structures as per drawing and MoRTH specifications Clause 304.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitablematerial.Ordinary soil Upto 3 m depth |
| 325 | Construction of Missing link road from Nagarghata to Rehnawali Mata km 0/0 to 1/500 |
| 326 | Construction of missing link road Beeech Ka Pura Jatav Basti Suresh ke Makan to Jatav Basti Beechkapura GP Ghanedi Km 0/0 to 1/0 |
| 327 | Construction of missing link road Dharapura Jarah Road to Dalelkapura SchoolKm 0/0 to 1/500 |
| 328 | Construction of Missing link road from Gwalmatolawala Pul to Kolipura km 0/0 to 1/500 |
| 329 | Construction of Missing link road from Kathuamara to Kareelpur km 0/0 to 1/00 |
| 330 | Construction of missing link road Karan Singh ki Madaiya to Mankhaki via Pinku ki Madaiya |
| 331 | Construction of missing link road Sikroda road to Ramsingh thaarkm 0/0 to 1/500 |
| 332 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and MoRTH specifications Clause 1702, 1703, 2102 & 2104 P.C.C grade M 15 Nominal mix (1:2.5:5) |
| 333 | Construction of Missing link road from Nagarghata to Rehnawali Mata km 0/0 to 1/500 |
| 334 | Construction of missing link road Beeech Ka Pura Jatav Basti Suresh ke Makan to Jatav Basti Beechkapura GP Ghanedi Km 0/0 to 1/0 |
| 335 | Construction of missing link road Dharapura Jarah Road to Dalelkapura SchoolKm 0/0 to 1/500 |
| 336 | Construction of Missing link road from Gwalmatolawala Pul to Kolipura km 0/0 to 1/500 |
| 337 | Construction of Missing link road from Kathuamara to Kareelpur km 0/0 to 1/00 |
| 338 | Construction of missing link road Karan Singh ki Madaiya to Mankhaki via Pinku ki Madaiya |
| 339 | Construction of missing link road Sikroda road to Ramsingh thaarkm 0/0 to 1/500 |
| 340 | Stone masonry work in cement mortar in foundation complete as per drawing and MoRTH specifications Clauses 1402, 1405, 2102 & 2104.Random Rubble Masonry In 1:4 cement mortar |
| 341 | Construction of Missing link road from Nagarghata to Rehnawali Mata km 0/0 to 1/500 |
| 342 | Construction of missing link road Beeech Ka Pura Jatav Basti Suresh ke Makan to Jatav Basti Beechkapura GP Ghanedi Km 0/0 to 1/0 |
| 343 | Construction of missing link road Dharapura Jarah Road to Dalelkapura SchoolKm 0/0 to 1/500 |
| 344 | Construction of Missing link road from Gwalmatolawala Pul to Kolipura km 0/0 to 1/500 |
| 345 | Construction of Missing link road from Kathuamara to Kareelpur km 0/0 to 1/00 |
| 346 | Construction of missing link road Karan Singh ki Madaiya to Mankhaki via Pinku ki Madaiya |
| 347 | Construction of missing link road Sikroda road to Ramsingh thaarkm 0/0 to 1/500 |
| 348 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granularmaterial in single row includingfixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 2905.300 mm dia |
| 349 | Construction of Missing link road from Nagarghata to Rehnawali Mata km 0/0 to 1/500 |
| 350 | Construction of missing link road Beeech Ka Pura Jatav Basti Suresh ke Makan to Jatav Basti Beechkapura GP Ghanedi Km 0/0 to 1/0 |
| 351 | Construction of missing link road Dharapura Jarah Road to Dalelkapura SchoolKm 0/0 to 1/500 |
| 352 | Construction of Missing link road from Gwalmatolawala Pul to Kolipura km 0/0 to 1/500 |
| 353 | Construction of Missing link road from Kathuamara to Kareelpur km 0/0 to 1/00 |
| 354 | Construction of missing link road Karan Singh ki Madaiya to Mankhaki via Pinku ki Madaiya |
| 355 | Construction of missing link road Sikroda road to Ramsingh thaarkm 0/0 to 1/500 |
| 356 | Providing PCC M-20 architectural coping on the top of wing wall, return wall etc. complete as per drawing and MoRTH specification Clauses 1313, 1411 and 2206.6 75 mm thick |
| 357 | Renewal ofroadDharampura to Kalyanpura km 0/0 t0 0/200 |
| 358 | Construction of Missing link road from Nagarghata to Rehnawali Mata km 0/0 to 1/500 |
| 359 | Construction of missing link road Beeech Ka Pura Jatav Basti Suresh ke Makan to Jatav Basti Beechkapura GP Ghanedi Km 0/0 to 1/0 |
| 360 | Construction of missing link road Dharapura Jarah Road to Dalelkapura SchoolKm 0/0 to 1/500 |
| 361 | Construction of Missing link road from Gwalmatolawala Pul to Kolipura km 0/0 to 1/500 |
| 362 | Construction of Missing link road from Kathuamara to Kareelpur km 0/0 to 1/00 |
| 363 | Construction of missing link road Karan Singh ki Madaiya to Mankhaki via Pinku ki Madaiya |
| 364 | Construction of missing link road Sikroda road to Ramsingh thaarkm 0/0 to 1/500 |
| 365 | Plastering with cement mortar (1:4), 20 mm thick on Stone work. |
| 366 | Renewal of Non Patchable Road A/R to Chandiyan ka pura km 0/0 to 0/400 |
| 367 | Pointing with cement mortar (1:3) on Stone work as per drawing and MoRTH specification Clauses 1406 and 2200 |
| 368 | Construction of Missing link road from Nagarghata to Rehnawali Mata km 0/0 to 1/500 |
| 369 | Construction of missing link road Beeech Ka Pura Jatav Basti Suresh ke Makan to Jatav Basti Beechkapura GP Ghanedi Km 0/0 to 1/0 |
| 370 | Construction of missing link road Dharapura Jarah Road to Dalelkapura SchoolKm 0/0 to 1/500 |
| 371 | Construction of Missing link road from Gwalmatolawala Pul to Kolipura km 0/0 to 1/500 |
| 372 | Construction of Missing link road from Kathuamara to Kareelpur km 0/0 to 1/00 |
| 373 | Construction of missing link road Karan Singh ki Madaiya to Mankhaki via Pinku ki Madaiya |
| 374 | Construction of missing link road Sikroda road to Ramsingh thaarkm 0/0 to 1/500 |
| 375 | PART - E (vented causeway) |
| 376 | Earthwork in excavation for structures as per drawing and MoRTH specifications Clause 304.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitablematerial.Ordinary soil Upto 3 m depth |
| 377 | Construction of Missing link road from Nagarghata to Rehnawali Mata km 0/0 to 1/500 |
| 378 | Construction of Missing link road from Gwalmatolawala Pul to Kolipura km 0/0 to 1/500 |
| 379 | Construction of missing link road Sikroda road to Ramsingh thaarkm 0/0 to 1/500 |
| 380 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and MoRTH specifications Clause 1702, 1703, 2102 & 2104 P.C.C grade M 15 Nominal mix (1:2.5:5) |
| 381 | Construction of Missing link road from Nagarghata to Rehnawali Mata km 0/0 to 1/500 |
| 382 | Construction of Missing link road from Gwalmatolawala Pul to Kolipura km 0/0 to 1/500 |
| 383 | Construction of missing link road Sikroda road to Ramsingh thaarkm 0/0 to 1/500 |
| 384 | Providing and laying reinforced cement concrete pipe NP3for culverts on first class bedding of granularmaterial in double row includingfixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets as per Clause 2905.1200 mm dia |
| 385 | Construction of Missing link road from Nagarghata to Rehnawali Mata km 0/0 to 1/500 |
| 386 | Construction of Missing link road from Gwalmatolawala Pul to Kolipura km 0/0 to 1/500 |
| 387 | Construction of missing link road Sikroda road to Ramsingh thaarkm 0/0 to 1/500 |
| 388 | Stone masonry work in cement mortar in foundation complete as per drawing and MoRTH specifications Clauses 1402, 1405, 2102 & 2104.Random Rubble Masonry In 1:4 cement mortar |
| 389 | Construction of Missing link road from Nagarghata to Rehnawali Mata km 0/0 to 1/500 |
| 390 | Construction of Missing link road from Gwalmatolawala Pul to Kolipura km 0/0 to 1/500 |
| 391 | Construction of missing link road Sikroda road to Ramsingh thaarkm 0/0 to 1/500 |
| 392 | Pointing with cement mortar (1:3) on Stone work as per drawing and MoRTH specification Clauses 1406 and 2200 |
| 393 | Construction of Missing link road from Nagarghata to Rehnawali Mata km 0/0 to 1/500 |
| 394 | Construction of Missing link road from Gwalmatolawala Pul to Kolipura km 0/0 to 1/500 |
| 395 | Construction of missing link road Sikroda road to Ramsingh thaarkm 0/0 to 1/500 |
| 396 | Providing PCC M-20 architectural coping on the top of wing wall, return wall etc. complete as per drawing and MoRTH specification Clauses 1313, 1411 and 2206.6 75 mm thick |
| 397 | Construction of Missing link road from Nagarghata to Rehnawali Mata km 0/0 to 1/500 |
| 398 | Construction of Missing link road from Gwalmatolawala Pul to Kolipura km 0/0 to 1/500 |
| 399 | Construction of missing link road Sikroda road to Ramsingh thaarkm 0/0 to 1/500 |
| 400 | PART - F (Protection Work) |
| 401 | Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and MoRTH specification Clause 2903 includding setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.Ordinary soilUpto 3 m depth |
| 402 | Construction of Missing link road from Nagarghata to Rehnawali Mata km 0/0 to 1/500 |
| 403 | Construction of Missing link road from Gwalmatolawala Pul to Kolipura km 0/0 to 1/500 |
| 404 | Construction of missing link road Sikroda road to Ramsingh thaarkm 0/0 to 1/500 |
| 405 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and MoRTH specifications Clause 1702, 1703, 2102 & 2104 P.C.C grade M 15Nominal mix (1:2.5:5) |
| 406 | Construction of Missing link road from Nagarghata to Rehnawali Mata km 0/0 to 1/500 |
| 407 | Construction of Missing link road from Gwalmatolawala Pul to Kolipura km 0/0 to 1/500 |
| 408 | Construction of missing link road Sikroda road to Ramsingh thaarkm 0/0 to 1/500 |
| 409 | Stone masonry work in cement mortar in foundation complete as per drawing and MoRTH specifications Clauses 1402, 1405, 2102 & 2104.Random Rubble Masonry In 1:4 cement mortar |
| 410 | Construction of Missing link road from Nagarghata to Rehnawali Mata km 0/0 to 1/500 |
| 411 | Construction of Missing link road from Gwalmatolawala Pul to Kolipura km 0/0 to 1/500 |
| 412 | Construction of missing link road Sikroda road to Ramsingh thaarkm 0/0 to 1/500 |
| 413 | Pointing with cement mortar (1:3) on Stone work as per drawing and MoRTH specification Clauses 1406 and 2200 |
| 414 | Construction of Missing link road from Nagarghata to Rehnawali Mata km 0/0 to 1/500 |
| 415 | Construction of Missing link road from Gwalmatolawala Pul to Kolipura km 0/0 to 1/500 |
| 416 | Construction of missing link road Sikroda road to Ramsingh thaarkm 0/0 to 1/500 |
| 417 | Providing A.C pipe Weep holes 150mm dia in Masonry/Plain Concrete/.Reinforced Concrete abutment, wing wall/return wall complete as per drawing and technical specfication as per MoRTH Specification Clause 2205 |
| 418 | Construction of Missing link road from Nagarghata to Rehnawali Mata km 0/0 to 1/500 |
| 419 | Construction of Missing link road from Gwalmatolawala Pul to Kolipura km 0/0 to 1/500 |
| 420 | Construction of missing link road Sikroda road to Ramsingh thaarkm 0/0 to 1/500 |
| 421 | Providing PCC M-20 architectural coping on the top of wing wall, return wall etc. complete as per drawing and MoRTH specification Clauses 1313, 1411 and 2206.6 |
| 422 | Construction of Missing link road from Nagarghata to Rehnawali Mata km 0/0 to 1/500 |
| 423 | Construction of Missing link road from Gwalmatolawala Pul to Kolipura km 0/0 to 1/500 |
| 424 | Construction of missing link road Sikroda road to Ramsingh thaarkm 0/0 to 1/500 |
| 425 | Stone masonry work in cement mortar in foundation complete as per drawing and MoRTH specifications Clauses 1402, 1405, 2102 & 2104.Random Rubble MasonryIn 1:4 cement mortar |
| 426 | Renewal of Non Patchable Road A/R to Chandiyan ka pura km 0/0 to 0/400 |
| 427 | Pointing with cement mortar (1:3) on Stone work as per drawing and MoRTH specification Clauses 1406 and 2200 |
| 428 | Renewal of Non Patchable Road A/R to Chandiyan ka pura km 0/0 to 0/400 |
| 429 | Providing PCC M-20 architectural coping on the top of wing wall, return wall etc. complete as per drawing and MoRTH specification Clauses 1313, 1411 and 2206.6 |
| 430 | Renewal of Non Patchable Road A/R to Chandiyan ka pura km 0/0 to 0/400 |
| 431 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and MoRTH specifications Clause 1702, 1703, 2102 & 2104 P.C.C grade M 15 Nominal mix (1:2.5:5) |
| 432 | Construction of missing link road Beeech Ka Pura Jatav Basti Suresh ke Makan to Jatav Basti Beechkapura GP Ghanedi Km 0/0 to 1/0 |
| 433 | PART - F (Road Furniture) |
| 434 | Reinforced cement concrete M15grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and MoRTH Specification Clause 801 |
| 435 | Killometer stone |
| 436 | Renewal of Non Patchable road Basai Gheeyaram to Sultanpur km0/0 to 2/0 |
| 437 | Renewal of Non Patchable Road A/R to Dan km 0/0 to 2/0 |
| 438 | Construction of missing link road Dandoli village to Govt. college maniya upto NH-44km 0/0 to 0/700 |
| 439 | Renewal of Non Patchable Road Kherli to Balgovind ka pura km 0/0 to 1/000 |
| 440 | Renewal of Non Patchable Road Kotpura to Harpoolpura km 0/0 to 1/000 |
| 441 | Renewal of Non Patchable Road Lathwali mata to Khubipura km 0/0 to 1/200 |
| 442 | Renewal of Non Patchable A/R road Machhariyakm0/0 to 0/700 |
| 443 | Renewal of Non Patchable Road Mankhaki to Bichola km 0/0 to 1/000 |
| 444 | Renewal of Non Patchable Road A/R Mishriyapura km 1/0 to 2/300 |
| 445 | Construction of Missing link road from Nagarghata to Rehnawali Mata km 0/0 to 1/500 |
| 446 | Renewal ofroadDandolivillage toNH-3 |
| 447 | Renewal of Non Patchable road Phoolpur road to Kasgang school 0/0 to 1/500 |
| 448 | Renewal of Non Patchable Road Pipri to Tomaro ki Madhaiya km 0/0 to 1/500 |
| 449 | Renewal of Non Patchable Road Shahpura Radhepura to Padmapura km 1/300 to 2/300 |
| 450 | Renewal of Non Patchable Road Tor Shankara to Madhabhau km 0/0 to 1/500 |
| 451 | Renewal of Non Patchable Road Virondha to Rawatpura km 0/0 to 2/0 |
| 452 | Kherali Kotpura Road to Baldevkapura km 0/0 to 1/500 |
| 453 | Renewal of Non Patchable Road A/R to Nagarghata km 0/0 to 1/600 |
| 454 | Construction of missing link road Beeech Ka Pura Jatav Basti Suresh ke Makan to Jatav Basti Beechkapura GP Ghanedi Km 0/0 to 1/0 |
| 455 | Renewal ofroad Buchapura to Latiyapura km 0/0 t0 1/00 |
| 456 | Renewal of Non Patchable A/R Road Shrinagar to Chhitapura 0/0 to 1/800 |
| 457 | Construction of missing link road Dharapura Jarah Road to Dalelkapura SchoolKm 0/0 to 1/500 |
| 458 | Construction of Missing link road from Gwalmatolawala Pul to Kolipura km 0/0 to 1/500 |
| 459 | Construction of Missing link road from Kathuamara to Kareelpur km 0/0 to 1/00 |
| 460 | Renewal of Non Patchable Road A/R to Nagar km 2/0 to 5/0 |
| 461 | Construction of missing link road Karan Singh ki Madaiya to Mankhaki via Pinku ki Madaiya |
| 462 | Construction of missing link road Sikroda road to Ramsingh thaarkm 0/0 to 1/500 |
| 463 | Renewal of Non Patchable Road A/R Samona km 2/0 to 4/0 |
| 464 | Renewal of Non Patchable road Didwar to Shreepalkigadikm0/0 to 1/200 |
| 465 | Renewal of Non Patchable A/R to Shrinagar 0/0 to 0/600 |
| 466 | 200m Stone |
| 467 | Renewal of Non Patchable road Basai Gheeyaram to Sultanpur km0/0 to 2/0 |
| 468 | Renewal of Non Patchable Road A/R to Dan km 0/0 to 2/0 |
| 469 | Construction of missing link road Dandoli village to Govt. college maniya upto NH-44km 0/0 to 0/700 |
| 470 | Renewal of Non Patchable Road Kherli to Balgovind ka pura km 0/0 to 1/000 |
| 471 | Renewal of Non Patchable Road Kotpura to Harpoolpura km 0/0 to 1/000 |
| 472 | Renewal of Non Patchable Road Lathwali mata to Khubipura km 0/0 to 1/200 |
| 473 | Renewal of Non Patchable A/R road Machhariyakm0/0 to 0/700 |
| 474 | Renewal of Non Patchable Road Mankhaki to Bichola km 0/0 to 1/000 |
| 475 | Renewal of Non Patchable Road A/R Mishriyapura km 1/0 to 2/300 |
| 476 | Construction of Missing link road from Nagarghata to Rehnawali Mata km 0/0 to 1/500 |
| 477 | Renewal ofroadDandolivillage toNH-3 |
| 478 | Renewal of Non Patchable road Phoolpur road to Kasgang school 0/0 to 1/500 |
| 479 | Renewal of Non Patchable Road Pipri to Tomaro ki Madhaiya km 0/0 to 1/500 |
| 480 | Renewal of Non Patchable Road Shahpura Radhepura to Padmapura km 1/300 to 2/300 |
| 481 | Renewal of Non Patchable Road Tor Shankara to Madhabhau km 0/0 to 1/500 |
| 482 | Renewal of Non Patchable Road Virondha to Rawatpura km 0/0 to 2/0 |
| 483 | Kherali Kotpura Road to Baldevkapura km 0/0 to 1/500 |
| 484 | Renewal of Non Patchable Road A/R to Nagarghata km 0/0 to 1/600 |
| 485 | Construction of missing link road Beeech Ka Pura Jatav Basti Suresh ke Makan to Jatav Basti Beechkapura GP Ghanedi Km 0/0 to 1/0 |
| 486 | Renewal ofroad Buchapura to Latiyapura km 0/0 t0 1/00 |
| 487 | Renewal of Non Patchable A/R Road Shrinagar to Chhitapura 0/0 to 1/800 |
| 488 | Construction of missing link road Dharapura Jarah Road to Dalelkapura SchoolKm 0/0 to 1/500 |
| 489 | Construction of Missing link road from Gwalmatolawala Pul to Kolipura km 0/0 to 1/500 |
| 490 | Construction of Missing link road from Kathuamara to Kareelpur km 0/0 to 1/00 |
| 491 | Renewal of Non Patchable Road A/R to Nagar km 2/0 to 5/0 |
| 492 | Construction of missing link road Karan Singh ki Madaiya to Mankhaki via Pinku ki Madaiya |
| 493 | Construction of missing link road Sikroda road to Ramsingh thaarkm 0/0 to 1/500 |
| 494 | Renewal of Non Patchable Road A/R Samona km 2/0 to 4/0 |
| 495 | Renewal of Non Patchable road Didwar to Shreepalkigadikm0/0 to 1/200 |
| 496 | Renewal of Non Patchable A/R to Shrinagar 0/0 to 0/600 |
| 497 | Providing and fixing Mukhya Mantri Sadak Yojana/ Mahatma Gandhi Rajya Sadak Yojana informatory sign board with logo for roads funded by State road fund having M.S. Definition plate of 1.60 mm thickness frame to steel hollow dsection of 75mm x 75mm, 2.5m long stove enamelled paint with hold fast including paint logo as per approved design and colours. The logo shall be made out of 1.6mm thick circular plate duly framed with MS angle 25x25x5 mm on back and fix on 1200mm x 150mm rectangular steel base plate 1.6mm thick, the base of circular shall be plain at the junction of base plate. The size of definition plate shall be 1500x600mm and embedding the posts by M-15 cement concrete block45 cm x 45 cm x 60 cm, 60 cm below ground levelincluding lettering / writing and painting etc. complete in all respect.as per MoRTH Specification Clause 801. |
| 498 | Renewal of Non Patchable road Basai Gheeyaram to Sultanpur km0/0 to 2/0 |
| 499 | Renewal of Non Patchable Road A/R to Dan km 0/0 to 2/0 |
| 500 | Construction of missing link road Dandoli village to Govt. college maniya upto NH-44km 0/0 to 0/700 |
| 501 | Renewal ofroadDharampura to Kalyanpura km 0/0 t0 0/200 |
| 502 | Renewal of Non Patchable Road Kherli to Balgovind ka pura km 0/0 to 1/000 |
| 503 | Renewal of Non Patchable Road Kotpura to Harpoolpura km 0/0 to 1/000 |
| 504 | Renewal of Non Patchable Road Lathwali mata to Khubipura km 0/0 to 1/200 |
| 505 | Renewal of Non Patchable A/R road Machhariyakm0/0 to 0/700 |
| 506 | Renewal of Non Patchable Road Mankhaki to Bichola km 0/0 to 1/000 |
| 507 | Renewal of Non Patchable Road A/R Mishriyapura km 1/0 to 2/300 |
| 508 | Construction of Missing link road from Nagarghata to Rehnawali Mata km 0/0 to 1/500 |
| 509 | Renewal ofroadDandolivillage toNH-3 |
| 510 | Renewal of Non Patchable road Phoolpur road to Kasgang school 0/0 to 1/500 |
| 511 | Renewal of Non Patchable Road Pipri to Tomaro ki Madhaiya km 0/0 to 1/500 |
| 512 | Renewal of Non Patchable Road Shahpura Radhepura to Padmapura km 1/300 to 2/300 |
| 513 | Renewal of Non Patchable Road Tor Shankara to Madhabhau km 0/0 to 1/500 |
| 514 | Renewal of Non Patchable Road Virondha to Rawatpura km 0/0 to 2/0 |
| 515 | Kherali Kotpura Road to Baldevkapura km 0/0 to 1/500 |
| 516 | Renewal of Non Patchable Road A/R to Nagarghata km 0/0 to 1/600 |
| 517 | Construction of missing link road Beeech Ka Pura Jatav Basti Suresh ke Makan to Jatav Basti Beechkapura GP Ghanedi Km 0/0 to 1/0 |
| 518 | Renewal ofroad Buchapura to Latiyapura km 0/0 t0 1/00 |
| 519 | Renewal of Non Patchable Road A/R to Chandiyan ka pura km 0/0 to 0/400 |
| 520 | Renewal of Non Patchable A/R Road Shrinagar to Chhitapura 0/0 to 1/800 |
| 521 | Construction of missing link road Dharapura Jarah Road to Dalelkapura SchoolKm 0/0 to 1/500 |
| 522 | Construction of Missing link road from Gwalmatolawala Pul to Kolipura km 0/0 to 1/500 |
| 523 | Construction of Missing link road from Kathuamara to Kareelpur km 0/0 to 1/00 |
| 524 | Renewal of Non Patchable Road A/R to Nagar km 2/0 to 5/0 |
| 525 | Construction of missing link road Karan Singh ki Madaiya to Mankhaki via Pinku ki Madaiya |
| 526 | Construction of missing link road Sikroda road to Ramsingh thaarkm 0/0 to 1/500 |
| 527 | Renewal of Non Patchable Road A/R Samona km 2/0 to 4/0 |
| 528 | Renewal of Non Patchable road Didwar to Shreepalkigadikm0/0 to 1/200 |
| 529 | Renewal of Non Patchable A/R to Shrinagar 0/0 to 0/600 |
| 530 | Providing and erecting direction and place identification of semi reflective sign boards as perIRC-67 made of 2 mm thick M.S. Sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70 mm width and required message, letters, figures with reflective tape of engineering grade of required shade and colour.Supported and welded on two nos. 47 mm x 47 mm of 12 SWG square tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to the ground by means of properly designed foundations with M-15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per approved drawing and Specification with size more than 0.9 sqm size board |
| 531 | Construction of missing link road Dandoli village to Govt. college maniya upto NH-44km 0/0 to 0/700 |
| 532 | Renewal ofroadDharampura to Kalyanpura km 0/0 t0 0/200 |
| 533 | Renewal ofroadDandolivillage toNH-3 |
| 534 | Renewal of Non Patchable road Phoolpur road to Kasgang school 0/0 to 1/500 |
| 535 | Renewal ofroad Buchapura to Latiyapura km 0/0 t0 1/00 |
| 536 | Providing and erecting direction and place identification of semi reflective sign boards as perIRC-67 made of 2 mm thick M.S. Sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70 mm width and required message, letters, figures with reflective tape of engineering grade of required shade and colour.Supported and welded on two nos. 47 mm x 47 mm of 12 SWG square tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to the ground by means of properly designed foundations with M-15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per approved drawing and Specification with size more than 0.9 sqm size board |
| 537 | Renewal of Non Patchable road Basai Gheeyaram to Sultanpur km0/0 to 2/0 |
| 538 | Renewal of Non Patchable Road A/R to Dan km 0/0 to 2/0 |
| 539 | Renewal of Non Patchable Road Kherli to Balgovind ka pura km 0/0 to 1/000 |
| 540 | Renewal of Non Patchable Road Kotpura to Harpoolpura km 0/0 to 1/000 |
| 541 | Renewal of Non Patchable Road Lathwali mata to Khubipura km 0/0 to 1/200 |
| 542 | Renewal of Non Patchable A/R road Machhariyakm0/0 to 0/700 |
| 543 | Renewal of Non Patchable Road Mankhaki to Bichola km 0/0 to 1/000 |
| 544 | Renewal of Non Patchable Road A/R Mishriyapura km 1/0 to 2/300 |
| 545 | Construction of Missing link road from Nagarghata to Rehnawali Mata km 0/0 to 1/500 |
| 546 | Renewal of Non Patchable Road Pipri to Tomaro ki Madhaiya km 0/0 to 1/500 |
| 547 | Renewal of Non Patchable Road Shahpura Radhepura to Padmapura km 1/300 to 2/300 |
| 548 | Renewal of Non Patchable Road Tor Shankara to Madhabhau km 0/0 to 1/500 |
| 549 | Renewal of Non Patchable Road Virondha to Rawatpura km 0/0 to 2/0 |
| 550 | Kherali Kotpura Road to Baldevkapura km 0/0 to 1/500 |
| 551 | Renewal of Non Patchable Road A/R to Nagarghata km 0/0 to 1/600 |
| 552 | Renewal of Non Patchable Road A/R to Chandiyan ka pura km 0/0 to 0/400 |
| 553 | Renewal of Non Patchable A/R Road Shrinagar to Chhitapura 0/0 to 1/800 |
| 554 | Construction of missing link road Dharapura Jarah Road to Dalelkapura SchoolKm 0/0 to 1/500 |
| 555 | Construction of Missing link road from Gwalmatolawala Pul to Kolipura km 0/0 to 1/500 |
| 556 | Construction of Missing link road from Kathuamara to Kareelpur km 0/0 to 1/00 |
| 557 | Renewal of Non Patchable Road A/R to Nagar km 2/0 to 5/0 |
| 558 | Construction of missing link road Karan Singh ki Madaiya to Mankhaki via Pinku ki Madaiya |
| 559 | Construction of missing link road Sikroda road to Ramsingh thaarkm 0/0 to 1/500 |
| 560 | Renewal of Non Patchable Road A/R Samona km 2/0 to 4/0 |
| 561 | Renewal of Non Patchable road Didwar to Shreepalkigadikm0/0 to 1/200 |
| 562 | Renewal of Non Patchable A/R to Shrinagar 0/0 to 0/600 |
| 563 | Supply& Fixing of flood gauge (water Gauge) as per I.R.C. 67 standard 200 cm long fixed on angle iron posts 50x50x6 mm, 2.6 M. long. |
| 564 | Renewal of Non Patchable Road A/R to Chandiyan ka pura km 0/0 to 0/400 |
Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail