Power Boards / Undertakings / PSU Closing in 0 days TDR #49464933

Tender For Maintenance Contract Of Turbine And Its Auxiliaries In A Thermal Power Plant Of Unit Size Upto 500 Mw - Round The Clock Up-Keeping And Maintenance Of Turbine And Its Auxiliaries As Per Scope Of Work Of Tender Specification. (One Job Means Round

Issued by Boards / Undertakings / PSU · anpara, Uttar Pradesh
Tender Value
1.12 Crore
Estimated cost
Bid Submission
02 Jul 2025
0 days left
EMD
1.50 Lakhs
Bank guarantee accepted
Document Fee
1180
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
anpara → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender For Maintenance Contract Of Turbine And Its Auxiliaries In A Thermal Power Plant Of Unit Size Upto 500 Mw - Round the clock up-keeping and maintenance of Turbine and its auxiliaries as per scope of work of Tender specification. (One Job means round the clock i.e. in all three shifts per day for one month) 2 1- For Anpara 210MW Unit-1 3 2- For Anpara 210MW Unit-2 4 3- For Anpara 210MW Unit-3 5 Overhauling of Centrifuging machine MAB103/206 as per scope of work. 6 Oil Flushing of H.P. Bypass oil system as per scope of work. 7 Transportation of lubricant/spares/consumables 8 Transportation of lubricant from Central Store to Site store. 9 Transportation of Empty Drums from site store to Central Store. 10 Running and up-keeping of 2 nos. portable centrifuging machine as per scope of work. 11 Replacement of the damaged L.P. diaphragms. 12 Cleaning of suction strainer of CEP 13 Cleaning of strainers of Raw Water Booster pumps 14 Round the clock up-keeping and maintenance of Boiler Feed Pumps and Condensate pumps as per Scope of work of tender Specification. .(One Job means round the clock i.e. in all three shifts per day for one month) 15 For Anpara 210MW Unit-1 16 For Anpara 210MW Unit-2 17 For Anpara 210MW Unit-3 18 Replacement of Old Turbine Oil cooler tube Nest Assembly with new one and installation and commissioning the same in unit#1/2/3 of 3x210 MW, ‘A’TPS, Anpara 19 Cleaning of Main oil tank room and spreading fresh sand (As per attached annexures) 20 Cleaning of Main Oil tank 21 Overhauling of gland seal vapour exhauster /Oil extraction fan 22 Replacement of damaged N2 gas bladder from Accumulator of HP Bypass system 23 Inspection / Replacement of HP Bypass Axial Piston Pump 24 Replacement of compensator of hotwell/ condensate Extraction pump 25 Cleaning of C.W. Duct inside the T.G. hall 26 Checking of through ness of drainpipe of Main Steam and hot reheat strainer 27 Repairing work of grating/chequred plate 28 Attending tube leakage of H. P. Heaters 5/6 of 3x210MW and commissioning of Heaters from water and steam side. 29 Attending water leakage from water box cover of H. P. Heaters 5/6. 30 Servicing of Pneumatically operated recirculation valves of BFP Nb 100mm 31 Servicing of solenoid operated drain valves DW-109 / DW-110 32 Servicing of motorized extraction valve ES-I / ES-4 Nb 200mm 33 Servicing of motorized Feed water discharge valves of BFP BF -7/8/9 of Nb200mm. 34 Servicing of H.P. motorized drain valve 25 to 50mm 35 Servicing of HP Manual valves & NRVs 36 Servicing of pneumatically operated drip line valve of LP heater, MC-23/19 ,DM-15 /16 37 Servicing of LP Hand operated/motorized valves at different elevations 25mm to 150mm. 38 Servicing of L.P. Hand operated/motorized valve/NRVs Nb 200mm to 500mm 39 Replacement of LP Valves (flange type) 100 to 500mm 40 Servicing of self-actuating feed water group protection valves FW-55/56 of H.P. Heaters of Nb-250mm and Np-250 Kg/cm². 41 Servicing of feed water motorized isolating valves of HP Heaters Nb 300mm. 42 Servicing & overhauling of Actuators K-150, F16A 43 Servicing of actuators type K-600, F14E 44 Servicing of pneumatic actuators 45 Servicing/Overhauling of Main Ejectors 46 Overhauling & Rectification of tube leakage from Turbine oil Coolers. 47 Overhauling/servicing of L. P. Heaters. 48 Servicing of drip control valves of H. P. Heater HD-20, HD-23, HD-14 49 Changing gaskets of flanges in feed line heaters, ejectors, Drain coolers etc. 50 Servicing of Actuators Limitorque/Siemens/ Acuma make 51 Replacement of HP valves steam line, oil line (motorized /hand operated) at different floors from (-) 4 meter to 11 meter level size more than Nb 15mm up to Nb 50mm 52 Replacement of HP valves steam line, oil line (motorized/hand operated) at different floors from (-) 4 meter to 11 meter level size more than Nb 50mm up to Nb 65mm 53 Replacement of HP valves steam line, drain line (motorized/hand operated) at different floors from (-) 4 meter to 11 meter level size more than Nb 65mm up to Nb 150mm 54 Replacement of gland packing of HP valves from Nb 50mm to Nb 500mm. 55 Replacement of gland packing of HP Bypass valve (BP-1 / BP-2). 56 Servicing of actuators of turbine gland seal steam /leak off controller along with valve. 57 Servicing of Electro hydraulically operated HP By pass valve (BP-1 / BP-2) 58 Attending leakages of pipeline & headers etc.of Turbine And It’s Auxiliaries by cutting grinding and H.P. welding of damaged portion putting new spools/bends if required. 59 Repair/Replacement of HP/LP Pipelines/drainlines by cutiing and re-welding on per mm basis 60 Inspection of Repaired TG Bearings No. 1 to 6: Dimension measurement and DP test 61 Performing condenser vacuum and tube leak test as per scope of work 62 Complete spray insulation and repair of spray insulation on following equipments including supply of self setting cement compound, spray wool alkali silicate binder retainers, M. S. Plate, aluminum shields, S.S. and G.I. wire nettings, removal of old and damaged insulation re-fixing of end shields plastering and finishing as per BHEL norms and specifications.1. H. P. casing 324 to 360 mm insulation thickness.2. Interceptor valves and I.P. control Valves 270mm thickness insulation. All the above equipments including their end shield on front and rear sides and other areas as per site requirements. 63 Supply and application of thermal insulation on critical steam pipes such as main steam hot reheat, cold reheat, cross around and feed cycles pipes etc. including fixing and fitting of protective covering insulation thickness 50mm silicate and 100mm mineral wool or by 180mm thickness of lightly resin bonded mineral/ rock wool and sheetings. 64 Checking & Refilling of Nitrogen Gas 65 Overhauling of ESV (1/2) / IP Stop valve (1/2) / HP Control valves (1/2) / IP Control valves(1/2) /LP Bypass control valve (1/2) as per scope of work. 66 Overhauling of Cold reheat NRVs (L&R) / L. P. Bypass stop valve (1/2) as per scope of work. 67 Overhauling ofESV / IP Stop valve /HP Control valves / IP Control valves /LP Bypass control valve / L. P. Bypass stop valve / Cold reheat NRV servomotor as per scope of work. 68 Checking and Rectification of Oil Guard Seal Rings of Bearing Pedestal No. 2/3. 69 Inspection/Overhauling of main turbine AOP 70 Inspection/Overhauling of main turbine EOP 71 Inspection/Overhauling of main turbine JOP 72 BOILER FEED PUMP TYPE FK-6D-30 (WEIR MAKE) 73 Inspection and Rectification of NDE mechanical seals of Boiler Feed Pumps. 74 Inspection and Rectification of DE mechanical seals of Boiler Feed Pumps. 75 Inspection and Rectification of NDE Thrust cum Journal bearings of BFP 76 Inspection of Thrust pads of NDE bearings of Boiler Feed pumps 77 Inspection and Rectification of DE journal bearing of BFP 78 Attending leakages from stuffing box of BFPs. 79 Inspection and Re-visioning of DE water-jackets of Boiler Feed Pumps 80 Inspection and Re-visioning of NDE water-jackets of Boiler Feed Pumps 81 Checking and adjustment of radial and axial alignment of BFP with hydraulic coupling 82 Threading out of BFP Cartridge 83 Minor overhauling of defective BFP Cartridge assembly 84 Threading in spare/repaired BFP cartridge assembly 85 Cleaning/ De-scaling and rectification of Mechanical seal coolers of BFPs 86 BOOSTER PUMP TYPE FA 1B-56 87 Inspection and Rectification ofNDE Thrust cum journal bearing of Booster pump 88 Inspection and Rectification of DE journal bearing of Booster pump 89 Inspection and Rectification of NDE mechanical seals of Booster pump. 90 Inspection and Rectification of DE mechanical seals of Booster pump 91 Checking and adjustment of radial and axial alignment of Booster pump with BFP motor. 92 Complete overhauling of suction strainer 93 Dis-assembly checking, overhauling and rectification of defective Booster pump assembly. 94 HYDRAULIC COUPLING TYPE R-16K (VOITH MAKE) 95 Inspection and Re-visioning of cam controller assembly. 96 Inspection and Rectification of thrust bearing no.3 and 4 of Hydraulic coupling. 97 Checking and adjustment of radial and axial alignment of hydraulic coupling with BFP motor. 98 Replacement of filter housing of Duplex Lub Oil filter of Hydraulic coupling 99 Dismantling/overhauling and rectification of the internals of the hydraulic coupling, their reassembly and commissioning. 100 CONDENSATE EXTRACTION PUMP TYPE EN 5J-40 101 Inspection and rectification of Thrust Bearing and journal bearing of condensate extraction pumps. 102 Re-alignment and adjustment of condensate extraction pump with motor. 103 Disassembly of CEP and head piece assembly from canister. 104 Minor overhauling of defective condensate Extraction pumps assembly. 105 Placement and commissioning of spare/repaired Condensate extraction pump and head piece assembly. 106 SMALL PUMPS &LO,WO COOLER OF BFP ETC. 107 Overhauling of Raw Water Booster Pumps 108 Overhauling of clarified water booster pumps 109 Cleaning of working oil/lub oil tubes and shell after removal of tube bunch from shell as per requirement 110 Revisioning of Unit Flash Tanks 111 Cleaning of Hot well of condenser 112 Maintenance of Unit Drain Tanks 113 Decoupling, coupling and alignment of clarified water Booster pump with motor. 114 Decoupling, coupling and alignment of Raw water Booster pump with motor. 115 Overhauling and rectification of Tube leakage of working oil coolers of Boiler Feed Pumps. 116 Shifting, fitting and commissioning of New Working oil Coolers. 117 Overhauling and rectification of tube leakage in lub oil Coolers of Boiler Feed Pumps. 118 Shifting, Fitting and commissioning of New lub oil coolers. 119 Repairs of strainer of BFP Raw Water line, MOT strainer & CEP strainer 120 Repairs of Long Angle Basket of BFP Suction Strainer 121 Repairs of Short Angle Basket of BFP Suction Strainer 122 Repairs of Suction strainer of CEP 123 Repairs of Large and SmallSuction Strainer Brackets ofRaw Water Line. (One large plus one small suction strainer bracket = 1Set) 124 Repairs of Main Oil Tank (MOT) Strainer.

BOQ

Name of Work: Maintenance contract of Turbine & Its Auxiliaries in a Thermal Power Plant of unit size upto 500 MW.
Sl. No. Item Description
1Round the clock up-keeping and maintenance of Turbine and its auxiliaries as per scope of work of Tender specification. (One Job means round the clock i.e. in all three shifts per day for one month)
21- For Anpara 210MW Unit-1
32- For Anpara 210MW Unit-2
43- For Anpara 210MW Unit-3
5Overhauling of Centrifuging machine MAB103/206 as per scope of work.
6Oil Flushing of H.P. Bypass oil system as per scope of work.
7Transportation of lubricant/spares/consumables
8Transportation of lubricant from Central Store to Site store.
9Transportation of Empty Drums from site store to Central Store.
10Running and up-keeping of 2 nos. portable centrifuging machine as per scope of work.
11Replacement of the damaged L.P. diaphragms.
12Cleaning of suction strainer of CEP
13Cleaning of strainers of Raw Water Booster pumps
14Round the clock up-keeping and maintenance of Boiler Feed Pumps and Condensate pumps as per Scope of work of tender Specification. .(One Job means round the clock i.e. in all three shifts per day for one month)
15For Anpara 210MW Unit-1
16For Anpara 210MW Unit-2
17For Anpara 210MW Unit-3
18Replacement of Old Turbine Oil cooler tube Nest Assembly with new one and installation and commissioning the same in unit#1/2/3 of 3x210 MW, ‘A’TPS, Anpara
19Cleaning of Main oil tank room and spreading fresh sand (As per attached annexures)
20Cleaning of Main Oil tank
21Overhauling of gland seal vapour exhauster /Oil extraction fan
22Replacement of damaged N2 gas bladder from Accumulator of HP Bypass system
23Inspection / Replacement of HP Bypass Axial Piston Pump
24Replacement of compensator of hotwell/ condensate Extraction pump
25Cleaning of C.W. Duct inside the T.G. hall
26Checking of through ness of drainpipe of Main Steam and hot reheat strainer
27Repairing work of grating/chequred plate
28Attending tube leakage of H. P. Heaters 5/6 of 3x210MW and commissioning of Heaters from water and steam side.
29Attending water leakage from water box cover of H. P. Heaters 5/6.
30Servicing of Pneumatically operated recirculation valves of BFP Nb 100mm
31Servicing of solenoid operated drain valves DW-109 / DW-110
32Servicing of motorized extraction valve ES-I / ES-4 Nb 200mm
33Servicing of motorized Feed water discharge valves of BFP BF -7/8/9 of Nb200mm.
34Servicing of H.P. motorized drain valve 25 to 50mm
35Servicing of HP Manual valves & NRVs
36Servicing of pneumatically operated drip line valve of LP heater, MC-23/19 ,DM-15 /16
37Servicing of LP Hand operated/motorized valves at different elevations 25mm to 150mm.
38Servicing of L.P. Hand operated/motorized valve/NRVs Nb 200mm to 500mm
39Replacement of LP Valves (flange type) 100 to 500mm
40Servicing of self-actuating feed water group protection valves FW-55/56 of H.P. Heaters of Nb-250mm and Np-250 Kg/cm².
41Servicing of feed water motorized isolating valves of HP Heaters Nb 300mm.
42Servicing & overhauling of Actuators K-150, F16A
43Servicing of actuators type K-600, F14E
44Servicing of pneumatic actuators
45Servicing/Overhauling of Main Ejectors
46Overhauling & Rectification of tube leakage from Turbine oil Coolers.
47Overhauling/servicing of L. P. Heaters.
48Servicing of drip control valves of H. P. Heater HD-20, HD-23, HD-14
49Changing gaskets of flanges in feed line heaters, ejectors, Drain coolers etc.
50Servicing of Actuators Limitorque/Siemens/ Acuma make
51Replacement of HP valves steam line, oil line (motorized /hand operated) at different floors from (-) 4 meter to 11 meter level size more than Nb 15mm up to Nb 50mm
52Replacement of HP valves steam line, oil line (motorized/hand operated) at different floors from (-) 4 meter to 11 meter level size more than Nb 50mm up to Nb 65mm
53Replacement of HP valves steam line, drain line (motorized/hand operated) at different floors from (-) 4 meter to 11 meter level size more than Nb 65mm up to Nb 150mm
54Replacement of gland packing of HP valves from Nb 50mm to Nb 500mm.
55Replacement of gland packing of HP Bypass valve (BP-1 / BP-2).
56Servicing of actuators of turbine gland seal steam /leak off controller along with valve.
57Servicing of Electro hydraulically operated HP By pass valve (BP-1 / BP-2)
58Attending leakages of pipeline & headers etc.of Turbine And It’s Auxiliaries by cutting grinding and H.P. welding of damaged portion putting new spools/bends if required.
59Repair/Replacement of HP/LP Pipelines/drainlines by cutiing and re-welding on per mm basis
60Inspection of Repaired TG Bearings No. 1 to 6: Dimension measurement and DP test
61Performing condenser vacuum and tube leak test as per scope of work
62Complete spray insulation and repair of spray insulation on following equipments including supply of self setting cement compound, spray wool alkali silicate binder retainers, M. S. Plate, aluminum shields, S.S. and G.I. wire nettings, removal of old and damaged insulation re-fixing of end shields plastering and finishing as per BHEL norms and specifications.1. H. P. casing 324 to 360 mm insulation thickness.2. Interceptor valves and I.P. control Valves 270mm thickness insulation. All the above equipments including their end shield on front and rear sides and other areas as per site requirements.
63Supply and application of thermal insulation on critical steam pipes such as main steam hot reheat, cold reheat, cross around and feed cycles pipes etc. including fixing and fitting of protective covering insulation thickness 50mm silicate and 100mm mineral wool or by 180mm thickness of lightly resin bonded mineral/ rock wool and sheetings.
64Checking & Refilling of Nitrogen Gas
65Overhauling of ESV (1/2) / IP Stop valve (1/2) / HP Control valves (1/2) / IP Control valves(1/2) /LP Bypass control valve (1/2) as per scope of work.
66Overhauling of Cold reheat NRVs (L&R) / L. P. Bypass stop valve (1/2) as per scope of work.
67Overhauling ofESV / IP Stop valve /HP Control valves / IP Control valves /LP Bypass control valve / L. P. Bypass stop valve / Cold reheat NRV servomotor as per scope of work.
68Checking and Rectification of Oil Guard Seal Rings of Bearing Pedestal No. 2/3.
69Inspection/Overhauling of main turbine AOP
70Inspection/Overhauling of main turbine EOP
71Inspection/Overhauling of main turbine JOP
72BOILER FEED PUMP TYPE FK-6D-30 (WEIR MAKE)
73Inspection and Rectification of NDE mechanical seals of Boiler Feed Pumps.
74Inspection and Rectification of DE mechanical seals of Boiler Feed Pumps.
75Inspection and Rectification of NDE Thrust cum Journal bearings of BFP
76Inspection of Thrust pads of NDE bearings of Boiler Feed pumps
77Inspection and Rectification of DE journal bearing of BFP
78Attending leakages from stuffing box of BFPs.
79Inspection and Re-visioning of DE water-jackets of Boiler Feed Pumps
80Inspection and Re-visioning of NDE water-jackets of Boiler Feed Pumps
81Checking and adjustment of radial and axial alignment of BFP with hydraulic coupling
82Threading out of BFP Cartridge
83Minor overhauling of defective BFP Cartridge assembly
84Threading in spare/repaired BFP cartridge assembly
85Cleaning/ De-scaling and rectification of Mechanical seal coolers of BFPs
86BOOSTER PUMP TYPE FA 1B-56
87Inspection and Rectification ofNDE Thrust cum journal bearing of Booster pump
88Inspection and Rectification of DE journal bearing of Booster pump
89Inspection and Rectification of NDE mechanical seals of Booster pump.
90Inspection and Rectification of DE mechanical seals of Booster pump
91Checking and adjustment of radial and axial alignment of Booster pump with BFP motor.
92Complete overhauling of suction strainer
93Dis-assembly checking, overhauling and rectification of defective Booster pump assembly.
94HYDRAULIC COUPLING TYPE R-16K (VOITH MAKE)
95Inspection and Re-visioning of cam controller assembly.
96Inspection and Rectification of thrust bearing no.3 and 4 of Hydraulic coupling.
97Checking and adjustment of radial and axial alignment of hydraulic coupling with BFP motor.
98Replacement of filter housing of Duplex Lub Oil filter of Hydraulic coupling
99Dismantling/overhauling and rectification of the internals of the hydraulic coupling, their reassembly and commissioning.
100CONDENSATE EXTRACTION PUMP TYPE EN 5J-40
101Inspection and rectification of Thrust Bearing and journal bearing of condensate extraction pumps.
102Re-alignment and adjustment of condensate extraction pump with motor.
103Disassembly of CEP and head piece assembly from canister.
104Minor overhauling of defective condensate Extraction pumps assembly.
105Placement and commissioning of spare/repaired Condensate extraction pump and head piece assembly.
106SMALL PUMPS &LO,WO COOLER OF BFP ETC.
107Overhauling of Raw Water Booster Pumps
108Overhauling of clarified water booster pumps
109Cleaning of working oil/lub oil tubes and shell after removal of tube bunch from shell as per requirement
110Revisioning of Unit Flash Tanks
111Cleaning of Hot well of condenser
112Maintenance of Unit Drain Tanks
113Decoupling, coupling and alignment of clarified water Booster pump with motor.
114Decoupling, coupling and alignment of Raw water Booster pump with motor.
115Overhauling and rectification of Tube leakage of working oil coolers of Boiler Feed Pumps.
116Shifting, fitting and commissioning of New Working oil Coolers.
117Overhauling and rectification of tube leakage in lub oil Coolers of Boiler Feed Pumps.
118Shifting, Fitting and commissioning of New lub oil coolers.
119Repairs of strainer of BFP Raw Water line, MOT strainer & CEP strainer
120Repairs of Long Angle Basket of BFP Suction Strainer
121Repairs of Short Angle Basket of BFP Suction Strainer
122Repairs of Suction strainer of CEP
123Repairs of Large and SmallSuction Strainer Brackets ofRaw Water Line. (One large plus one small suction strainer bracket = 1Set)
124Repairs of Main Oil Tank (MOT) Strainer.

AI Tender Summary

OUR REF NO 49464933
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE 1.12 Crore
LAST DATE 02-07-2025
Authority
Authority Name Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited
Work Description Tender For Maintenance Contract Of Turbine And Its Auxiliaries In A Thermal Power Plant Of Unit Size Upto 500 Mw - Round the clock up-keeping and maintenance of Turbine and its auxiliaries as per scope of work of Tender specification. (One Job means round the clock i.e. in all three shifts per day for one month) 2 1- For Anpara 210MW Unit-1 3 2- For Anpara 210MW Unit-2 4 3- For Anpara 210MW Unit-3 5 Overhauling of Centrifuging machine MAB103/206 as per scope of work. 6 Oil Flushing of H.P. Bypass oil system as per scope of work. 7 Transportation of lubricant/spares/consumables 8 Transportation of lubricant from Central Store to Site store. 9 Transportation of Empty Drums from site store to Central Store. 10 Running and up-keeping of 2 nos. portable centrifuging machine as per scope of work. 11 Replacement of the damaged L.P. diaphragms. 12 Cleaning of suction strainer of CEP 13 Cleaning of strainers of Raw Water Booster pumps 14 Round the clock up-keeping and maintenance of Boiler Feed Pumps and Condensate pumps as per Scope of work of tender Specification. .(One Job means round the clock i.e. in all three shifts per day for one month) 15 For Anpara 210MW Unit-1 16 For Anpara 210MW Unit-2 17 For Anpara 210MW Unit-3 18 Replacement of Old Turbine Oil cooler tube Nest Assembly with new one and installation and commissioning the same in unit#1/2/3 of 3x210 MW, ‘A’TPS, Anpara 19 Cleaning of Main oil tank room and spreading fresh sand (As per attached annexures) 20 Cleaning of Main Oil tank 21 Overhauling of gland seal vapour exhauster /Oil extraction fan 22 Replacement of damaged N2 gas bladder from Accumulator of HP Bypass system 23 Inspection / Replacement of HP Bypass Axial Piston Pump 24 Replacement of compensator of hotwell/ condensate Extraction pump 25 Cleaning of C.W. Duct inside the T.G. hall 26 Checking of through ness of drainpipe of Main Steam and hot reheat strainer 27 Repairing work of grating/chequred plate 28 Attending tube leakage of H. P. Heaters 5/6 of 3x210MW and commissioning of Heaters from water and steam side. 29 Attending water leakage from water box cover of H. P. Heaters 5/6. 30 Servicing of Pneumatically operated recirculation valves of BFP Nb 100mm 31 Servicing of solenoid operated drain valves DW-109 / DW-110 32 Servicing of motorized extraction valve ES-I / ES-4 Nb 200mm 33 Servicing of motorized Feed water discharge valves of BFP BF -7/8/9 of Nb200mm. 34 Servicing of H.P. motorized drain valve 25 to 50mm 35 Servicing of HP Manual valves & NRVs 36 Servicing of pneumatically operated drip line valve of LP heater, MC-23/19 ,DM-15 /16 37 Servicing of LP Hand operated/motorized valves at different elevations 25mm to 150mm. 38 Servicing of L.P. Hand operated/motorized valve/NRVs Nb 200mm to 500mm 39 Replacement of LP Valves (flange type) 100 to 500mm 40 Servicing of self-actuating feed water group protection valves FW-55/56 of H.P. Heaters of Nb-250mm and Np-250 Kg/cm². 41 Servicing of feed water motorized isolating valves of HP Heaters Nb 300mm. 42 Servicing & overhauling of Actuators K-150, F16A 43 Servicing of actuators type K-600, F14E 44 Servicing of pneumatic actuators 45 Servicing/Overhauling of Main Ejectors 46 Overhauling & Rectification of tube leakage from Turbine oil Coolers. 47 Overhauling/servicing of L. P. Heaters. 48 Servicing of drip control valves of H. P. Heater HD-20, HD-23, HD-14 49 Changing gaskets of flanges in feed line heaters, ejectors, Drain coolers etc. 50 Servicing of Actuators Limitorque/Siemens/ Acuma make 51 Replacement of HP valves steam line, oil line (motorized /hand operated) at different floors from (-) 4 meter to 11 meter level size more than Nb 15mm up to Nb 50mm 52 Replacement of HP valves steam line, oil line (motorized/hand operated) at different floors from (-) 4 meter to 11 meter level size more than Nb 50mm up to Nb 65mm 53 Replacement of HP valves steam line, drain line (motorized/hand operated) at different floors from (-) 4 meter to 11 meter level size more than Nb 65mm up to Nb 150mm 54 Replacement of gland packing of HP valves from Nb 50mm to Nb 500mm. 55 Replacement of gland packing of HP Bypass valve (BP-1 / BP-2). 56 Servicing of actuators of turbine gland seal steam /leak off controller along with valve. 57 Servicing of Electro hydraulically operated HP By pass valve (BP-1 / BP-2) 58 Attending leakages of pipeline & headers etc.of Turbine And It’s Auxiliaries by cutting grinding and H.P. welding of damaged portion putting new spools/bends if required. 59 Repair/Replacement of HP/LP Pipelines/drainlines by cutiing and re-welding on per mm basis 60 Inspection of Repaired TG Bearings No. 1 to 6: Dimension measurement and DP test 61 Performing condenser vacuum and tube leak test as per scope of work 62 Complete spray insulation and repair of spray insulation on following equipments including supply of self setting cement compound, spray wool alkali silicate binder retainers, M. S. Plate, aluminum shields, S.S. and G.I. wire nettings, removal of old and damaged insulation re-fixing of end shields plastering and finishing as per BHEL norms and specifications.1. H. P. casing 324 to 360 mm insulation thickness.2. Interceptor valves and I.P. control Valves 270mm thickness insulation. All the above equipments including their end shield on front and rear sides and other areas as per site requirements. 63 Supply and application of thermal insulation on critical steam pipes such as main steam hot reheat, cold reheat, cross around and feed cycles pipes etc. including fixing and fitting of protective covering insulation thickness 50mm silicate and 100mm mineral wool or by 180mm thickness of lightly resin bonded mineral/ rock wool and sheetings. 64 Checking & Refilling of Nitrogen Gas 65 Overhauling of ESV (1/2) / IP Stop valve (1/2) / HP Control valves (1/2) / IP Control valves(1/2) /LP Bypass control valve (1/2) as per scope of work. 66 Overhauling of Cold reheat NRVs (L&R) / L. P. Bypass stop valve (1/2) as per scope of work. 67 Overhauling ofESV / IP Stop valve /HP Control valves / IP Control valves /LP Bypass control valve / L. P. Bypass stop valve / Cold reheat NRV servomotor as per scope of work. 68 Checking and Rectification of Oil Guard Seal Rings of Bearing Pedestal No. 2/3. 69 Inspection/Overhauling of main turbine AOP 70 Inspection/Overhauling of main turbine EOP 71 Inspection/Overhauling of main turbine JOP 72 BOILER FEED PUMP TYPE FK-6D-30 (WEIR MAKE) 73 Inspection and Rectification of NDE mechanical seals of Boiler Feed Pumps. 74 Inspection and Rectification of DE mechanical seals of Boiler Feed Pumps. 75 Inspection and Rectification of NDE Thrust cum Journal bearings of BFP 76 Inspection of Thrust pads of NDE bearings of Boiler Feed pumps 77 Inspection and Rectification of DE journal bearing of BFP 78 Attending leakages from stuffing box of BFPs. 79 Inspection and Re-visioning of DE water-jackets of Boiler Feed Pumps 80 Inspection and Re-visioning of NDE water-jackets of Boiler Feed Pumps 81 Checking and adjustment of radial and axial alignment of BFP with hydraulic coupling 82 Threading out of BFP Cartridge 83 Minor overhauling of defective BFP Cartridge assembly 84 Threading in spare/repaired BFP cartridge assembly 85 Cleaning/ De-scaling and rectification of Mechanical seal coolers of BFPs 86 BOOSTER PUMP TYPE FA 1B-56 87 Inspection and Rectification ofNDE Thrust cum journal bearing of Booster pump 88 Inspection and Rectification of DE journal bearing of Booster pump 89 Inspection and Rectification of NDE mechanical seals of Booster pump. 90 Inspection and Rectification of DE mechanical seals of Booster pump 91 Checking and adjustment of radial and axial alignment of Booster pump with BFP motor. 92 Complete overhauling of suction strainer 93 Dis-assembly checking, overhauling and rectification of defective Booster pump assembly. 94 HYDRAULIC COUPLING TYPE R-16K (VOITH MAKE) 95 Inspection and Re-visioning of cam controller assembly. 96 Inspection and Rectification of thrust bearing no.3 and 4 of Hydraulic coupling. 97 Checking and adjustment of radial and axial alignment of hydraulic coupling with BFP motor. 98 Replacement of filter housing of Duplex Lub Oil filter of Hydraulic coupling 99 Dismantling/overhauling and rectification of the internals of the hydraulic coupling, their reassembly and commissioning. 100 CONDENSATE EXTRACTION PUMP TYPE EN 5J-40 101 Inspection and rectification of Thrust Bearing and journal bearing of condensate extraction pumps. 102 Re-alignment and adjustment of condensate extraction pump with motor. 103 Disassembly of CEP and head piece assembly from canister. 104 Minor overhauling of defective condensate Extraction pumps assembly. 105 Placement and commissioning of spare/repaired Condensate extraction pump and head piece assembly. 106 SMALL PUMPS &LO,WO COOLER OF BFP ETC. 107 Overhauling of Raw Water Booster Pumps 108 Overhauling of clarified water booster pumps 109 Cleaning of working oil/lub oil tubes and shell after removal of tube bunch from shell as per requirement 110 Revisioning of Unit Flash Tanks 111 Cleaning of Hot well of condenser 112 Maintenance of Unit Drain Tanks 113 Decoupling, coupling and alignment of clarified water Booster pump with motor. 114 Decoupling, coupling and alignment of Raw water Booster pump with motor. 115 Overhauling and rectification of Tube leakage of working oil coolers of Boiler Feed Pumps. 116 Shifting, fitting and commissioning of New Working oil Coolers. 117 Overhauling and rectification of tube leakage in lub oil Coolers of Boiler Feed Pumps. 118 Shifting, Fitting and commissioning of New lub oil coolers. 119 Repairs of strainer of BFP Raw Water line, MOT strainer & CEP strainer 120 Repairs of Long Angle Basket of BFP Suction Strainer 121 Repairs of Short Angle Basket of BFP Suction Strainer 122 Repairs of Suction strainer of CEP 123 Repairs of Large and SmallSuction Strainer Brackets ofRaw Water Line. (One large plus one small suction strainer bracket = 1Set) 124 Repairs of Main Oil Tank (MOT) Strainer.
Basic Detail
Tender No 08/TMD/OMC-II/ATPS/2025-26
Bidding Type Tender
Location
City anpara
State Uttar Pradesh
Key Dates
Publish Date 02 Jun 2025
Submission Date 02 Jul 2025
Open Date 03 Jul 2025
Finance
Tender Value 1.12 Crore
Tender Fee 1180
EMD 1.50 Lakhs
Exemption Not Available
Document List
Tendernotice_2.pdf
e1e9c396-dc14-47d2-bdce-841c3af2afa0.html
BOQ_1897015.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jun 02, 2025
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 02, 2025
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Jul 03, 2025

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
pdf

Tendernotice_2.pdf

html

e1e9c396-dc14-47d2-bdce-841c3af2afa0.html

xls

BOQ_1897015.xls

pdf

Tendernotice_1.pdf