}

Tender For 2000169046 - Pressure Filter Jobs, vizianagaram-Andhra Pradesh

Arcelor Mittal Nippon Steel India Limited has published Tender For 2000169046 - Pressure Filter Jobs. Submission Date for this Tender is 09-06-2025. Conveyors and Accessories Tenders in vizianagaram Andhra Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

49445737
Tender For 2000169046 - Pressure Filter Jobs
Tender
Indian
Andhra Pradesh
Vizianagaram
09-06-2025

Tender Details

Tender For 2000169046 - Pressure Filter Jobs 2000169046 10 10 10 PULLEY REPLACEMENT 1 NO Email : Sreerama.Kishoregurram@amns.in Contact : Name : Sree Rama Gurram Item Details : 1. Scope of work for 144 Conveyor Pulleys replacement Quantity: 01 No’s, Dimensions: 650mmDiaX2800mmlength, Approx. Weight of each Pulley – 2.5 Ton 1. New pulleys ( Tail Pulley) to be shifted from the store to Pressure filter area. 2. Permit to work must be taken from the concerned engineer. 4. After removing the belt by AMNS team, Tail pulley and bearing covers to be opened to remove pulley from position. 5. Suitable chain blocks to be positioned to shift the pulley from position to zero meter. As crane approach is not available, rigging activity to be done by chain blocks. 6. Remove the old pulley from position, 11. Tail Pulley to be dismantled from the position and dismantle bearings and housings from the pulley. 12. Assemble new tail pulley with new bearings and housing. Erect the new pulley into position. 13. Fix the take-up screws, align the pulley <(>&<)> fix the accessories <(>&<)> fittings. 14. Housekeeping to be done and removed pulleys to be shifted to workshop. ü Estimated Manpower: o A team should consist of minimum 8 members as listed below • M.W.Fitter - 1 No • Cutter - 1 No • Welder - 1 No • Rigger - 6 No • Helper - 1 No o Approximate 10-12 Hr is required to complete 1 pulley replacement. ü AMNS Scope: • Pulleys, Bearings <(>&<)> other material accessories will be provided AMNS • All Fasteners will be provided by AMNS • Electricity will be provided by AMNS • Consumables like gas, welding rods, grease will be provided by AMNS. ü Vendor Scope: • Cutting set with Flash Back Arrestor, Oxygen, DA -1 set for Team • Grinding Machine AG5/AG7 • Welding machine along with 2 cables (1- welding cable, 1 – earth cable) • Chain Blocks 05MT – 4 no’s / as per requirement. • Alignment tools like Dial Gauge with magnetic stand, feeler gauge etc., Item Note : 2 2000169046 20 20 10 HEAD PULLEY REPLACEMENT 1 NO Email : Sreerama.Kishoregurram@amns.in Contact : Name : Sree Rama Gurram Item Details : 1. Scope of work for 144 Conveyor Pulleys replacement Quantity: 01 No’s, Dimensions: 650mmDiaX2800mmlength, Approx. Weight of each Pulley – 2.5 Ton 1. New pulleys (Drive pulley ) to be shifted from the store to Pressure filter area. 2. Permit to work must be taken from the concerned engineer. 3. Drive Pulley to be assembled with drive side bearing and Coupling half to be fixed. 4. After removing the belt by AMNS team, Drive pulley coupling and bearing covers to be opened to remove pulley from position. 5. Suitable chain blocks to be positioned to shift the pulley from Page 2 of 3 ArcelorMittal Nippon Steel India Pvt Ltd AM/NS PELLETS VIZAG Near Flyover, Scindia Road,Visakhapatnam,530004,Andhra Pradesh,India GSTIN 37AAACE1741P1ZG PAN AAACE1741P CIN U27100GJ1976FTC013787 Request for Quotation Number 6000135048 Date 29.05.2025 Submission Date 09.06.2025 Coll Req No AMNS deals with OEMs directly. We are very well equipped in every way to import / buy our goods directly from OEMs from any part of the world in a professional manner. We also use the vast global networks of our parent companies where necessary. We do not welcome any contact from intermediaries or Indian Agents of vendors. We assure all OEMs that you do not need to engage anyone to manage your transactions with us.Kindly respond to our RFQs and deal with our officials directly without involving any agents or intermediaries. Offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. Contact for this RFQ null Sravan Lanka Contact Email sravan.lanka@ext.amns.in MATERIALS / SERVICES Please acknowledge receipt of the RFQ And provide your best quote for below given RFQ details. SR. No PR No. PR Item RFQ Item Services for line Item Quantity UOM Technical Details Other Details position to zero meter. As crane approach is not available, rigging activity to be done by chain blocks. 6. Remove the old pulley from position, remove the half coupling from gearbox output shaft. 7. Fix new coupling half on the gearbox output shaft. 8. Clean <(>&<)> prepare the plummer blocks for fixing the new pulley into position. 9. Erect the new pulley into position, Fix the non-drive side bearing into position. Align the bearing centers and fix the pulley with the plummer blocks. 10. Gearbox to Pulley coupling alignment to be done. ü Estimated Manpower: o A team should consist of minimum 8 members as listed below • M.W.Fitter - 1 No • Cutter - 1 No • Welder - 1 No • Rigger - 6 No • Helper - 1 No o Approximate 10-12 Hr is required to complete 1 pulley replacement. ü AMNS Scope: • Pulleys, Bearings <(>&<)> other material accessories will be provided AMNS • All Fasteners will be provided by AMNS • Electricity will be provided by AMNS • Consumables like gas, welding rods, grease will be provided by AMNS. ü Vendor Scope: • Cutting set with Flash Back Arrestor, Oxygen, DA -1 set for Team • Grinding Machine AG5/AG7 • Welding machine along with 2 cables (1- welding cable, 1 – earth cable) • Chain Blocks 05MT – 4 no’s / as per requirement. • Alignment tools like Dial Gauge with magnetic stand, feeler gauge etc., Item Note : 3 2000169046 30 30 10 Belt conveyor carrying/Impact idler 114 NO Email : Sreerama.Kishoregurram@amns.in Contact : Name : Sree Rama Gurram Item Details : 2. Scope of work for 143 <(>&<)> 144 Conveyor rollers replacement: Roller Dimensions(mm): Roller dia. - 230, Face length - 2800, Bearing Center - 2950, overall length – 3030. Bearing No. 22215 EK. Ø Total quantity – 114 rollers (57 no’s in each conveyor) Ø Bearing / Plummer blocks / Rollers inspection: 93 rollers. Ø Rolls replacement based on inspection: 30 rollers Ø Removing 3-piece impact idler <(>&<)> frames and fixing with new rollers – 07 rollers. Ø Removing return idlers and fixing new rollers – 14 no’s As per scope and quantity of work, the following activities need to be carried: 1. New roller to be shifted from the store to Pressure filter area. 2. Permit to work must be taken from the concerned engineer. 3. Plummer blocks to cleaned and opened for bearings inspection. 4. Clean the grease and inspect the plumber block, bearing and shaft for condition. 5. If all are good, bearing clearance need to be checked. Bearing Sleeve tightness to be checked and retightened. Fill new grease in the block and assemble. 6. If bearing / Plummer block is damaged, replace the component and assemble the roller. 7. If roller shaft is worn out, replace the roller with a new roller. 8. Impact idlers frames – 07 no’s to be dismantled and shifted to ground Page 3 of 3 ArcelorMittal Nippon Steel India Pvt Ltd AM/NS PELLETS VIZAG Near Flyover, Scindia Road,Visakhapatnam,530004,Andhra Pradesh,India GSTIN 37AAACE1741P1ZG PAN AAACE1741P CIN U27100GJ1976FTC013787 Request for Quotation Number 6000135048 Date 29.05.2025 Submission Date 09.06.2025 Coll Req No AMNS deals with OEMs directly. We are very well equipped in every way to import / buy our goods directly from OEMs from any part of the world in a professional manner. We also use the vast global networks of our parent companies where necessary. We do not welcome any contact from intermediaries or Indian Agents of vendors. We assure all OEMs that you do not need to engage anyone to manage your transactions with us.Kindly respond to our RFQs and deal with our officials directly without involving any agents or intermediaries. Offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. Contact for this RFQ null Sravan Lanka Contact Email sravan.lanka@ext.amns.in MATERIALS / SERVICES Please acknowledge receipt of the RFQ And provide your best quote for below given RFQ details. SR. No PR No. PR Item RFQ Item Services for line Item Quantity UOM Technical Details Other Details floor. Replace the slots with new rollers. 9. Dismantle the existing return idlers and fix new rollers in that position. 10. After fixing new rollers, Plummer blocks to be opened, bearings clearance to be adjusted, filled with new grease and to be assembled. 11. To replace bearing / roller, Skirt boards need to be removed and to be fixed after the job is completed. 12. Suitable chain blocks to be positioned to remove and fix the rollers. 13. To follow instructions of engineer in charge based on the in-situ conditions. ü Estimated Manpower: o A team should consist of minimum 8 members as listed below • M.W.Fitter - 4 No • Fitter - 4 No • Cutter - 2 No • Welder - 2 No • Rigger - 8 No • Helper - 8 No o Approximate 03 days for each conveyor. ü AMNS Scope: • Rollers, Bearings <(>&<)> other material accessories will be provided AMNS • All Fasteners will be provided by AMNS • Electricity will be provided by AMNS • Consumables like gas, welding rods, grease will be provided by AMNS. ü Vendor Scope: • Cutting set with Flash Back Arrestor, Oxygen, DA -2 sets • Grinding Machine AG5/AG7 • Welding machine along with 2 cables (1- welding cable, 1 – earth cable) – 02 no’s • Chain Blocks 02MT – 8 no’s / as per requirement. • Alignment tools like Dial Gauge with magnetic stand, feeler gauge

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail