|
| 1 | Operation and daily checkup of weighing scales including preventive & breakdown maintenance as per requirement by deploying One Skilled Labour - Mechanic /Electrician on round the clock basis for smooth and trouble free operation of the system installed at Hajj Terminal for departure flights during Hajj Operation complete as required as per the instruction and to the satisfaction of the Engineer in Charge. (Note: The deputation period shall be decided based on the flight schedule and in consultation with the Engineer-in-Charge. Payment against this item shall be based on the actual deputation period). |
| 2 | First year |
| 3 | Second year |
| 4 | Complete overhauling including cleaning, servicing of the following baggage conveyor system, checking the electrical control panels, control wiring, cabling, earthing etc. for successful run in auto and manual mode of arrival baggage conveyor system as per site requirement including carrying out necessary repairing / servicing of bearings, etc. as per site requirement. Supply and fixing of required quantity of consumables, all small hardware materials and electrical materials like fuses, terminals, cables etc. complete as required as per the instruction and to the satisfaction of the Engineer in Charge. Glidepath make Arrival Baggage Conveyor system consisting majorly of following: (i) Crescent pallet type Arrival Baggage Break up carousel of 82.327 mtr. length - 01 nos. (ii) Control & Power Panels - 01 Nos. (iii) Rolling Shutters – 02 Nos. (Note: Any other items not specifically mentioned above but a part of the installation shall be deemed to be inclusive under this item) |
| 5 | First year |
| 6 | Second year |
| 7 | Operation and daily maintenance of Arrival conveyors including routine maintenance, preventive maintenance, breakdown maintenance as per site requirement and as per maintenance schedule, including supplying and fixing of required quantity of consumables like french chalk, soap, duster, cotton waste, and all small hardware materials and electrical materials like fuses, terminals etc. The arrival system has to be maintained on round the clock basis (One Skilled Labour - Mechanic /Electrician in each shift, One Unskilled Labour - Helper in each Shift) for smooth and trouble free operation of the total system installed at Old DTB complete as required as per the instruction and to the satisfaction of the Engineer in Charge. (Note: The deputation period shall be decided based on the flight schedule and in consultation with the Engineer-in-Charge. Payment against this item shall be based on the actual deputation period). |
| 8 | First year |
| 9 | Second year |
| 10 | Transportation of Weighing scales from AAI Store/terminal Building to Hajj House for departure flights & bringing it back from Hajj House upto the AAI store at Old ITB after completion of Departing Hajj movement. |
| 11 | First year |
| 12 | Second year |
| 13 | Repairing & servicing to make the system in serviceable state i/c supply & fixing of all electrical, mechanical & electronic component required for the weighing scale incase of break down along with verification & stampingfrom office of the Directorate of Legal Metrology, weighs & Measure, Govt. of W.B. 300Kg. / 200 Kg. capacity scale.Note: Supply of Major spares are covered under separate item. However fixing of same is considered under this item (as mentioned in SCC). |
| 14 | First year |
| 15 | Second year |
| 16 | Letter writings with synthetic enamel paint of approved brand and manufacturer on the M.S. sheet / S.S. sheet / Painted Wall in English language complete as required as per the instruction and to thesatisfaction of the Engineer in Charge of the following sizes. |
| 17 | 60 CM |
| 18 | (a) First year |
| 19 | (b) Second year |
| 20 | 45 CM |
| 21 | (a) First year |
| 22 | (b) Second year |
| 23 | 30 CM |
| 24 | (a) First year |
| 25 | (b) Second year |
| 26 | 15 CM |
| 27 | (a) First year |
| 28 | (b) Second year |
| 29 | 10 CM |
| 30 | (a) First year |
| 31 | (b) Second year |
| 32 | 5 CM |
| 33 | (a) First year |
| 34 | (b) Second year |
| 35 | 2 CM |
| 36 | (a) First year |
| 37 | (b) Second year |
| 38 | 1 CM |
| 39 | (a) First year |
| 40 | (b) Second year |
| 41 | Supply & Fixing of Transparent Nylon Curtain at Conveyor belt windows at X-ray Rooms at Terminal-2 at NSCBI Airport, Kolkata. |
| 42 | First year |
| 43 | Second year |
| 44 | Supply of C.P.U. card along with power supply card i/c two nos. display with wire for any make electronic weighing scale for faulty digitiser. |
| 45 | First year |
| 46 | Second year |
| 47 | Supply of load cell i/c cord for different make & capacity weighing scale. |
| 48 | First year |
| 49 | Second year |
| 50 | Supply of power ON / OFF switch of different make weighing scale. |
| 51 | First year |
| 52 | Second year |
| 53 | Supply of Jack of Load Cell for different make & capacity weighing scale. |
| 54 | First year |
| 55 | Second year |
| 56 | Supply of Front Disply Sticker for different make & capacity weighing scale. |
| 57 | First year |
| 58 | Second year |
| 59 | Supply of transformer for different make & capacity weighing scale. |
| 60 | First year |
| 61 | Second year |
| 62 | Supply of power cord for input power supply of different make & capacity weighing scale. |
| 63 | First year |
| 64 | Second year |
| 65 | Supply of Display board along with necessary cable for different make & capacity weighing scale. |
| 66 | First year |
| 67 | Second year |
| 68 | Supply & fixing of Check-in display sheet made of acrylic suitable for interaction of weighing scale calibration certificate and to be fixed on check-in counters at Kolkata Airport. |
| 69 | First year |
| 70 | Second year |
| 71 | Scrubbing, cleaning the existing surface of cubicle panel, rounded roller, rectangle body or any other structure made of MS plate / tubes / sheets and spray painting the same with two coats of ISI marked synthetic enamel paint of approved colour over one coat of red oxide metal primer etc. as per direction of engineer - in - charge. |
| 72 | First year |
| 73 | Second year |
| 74 | Dismantling, repairing, servicing & overhauling of defective geared motor of arrival corousal including re-winding of burnt out motor, providing new bearings, new super enamel coated copper wire with heat varnishing, backing, fitting etc. replacement & fixing of damaged spare parts, refilling of gear oil of recommended lubricant of Castrol / Indian Oil brand etc. as required of all types/ make of gear boxes for smooth functioning of the system complete as required as per the instruction and to the satisfaction of the Engineer in Charge. |
| 75 | First year |
| 76 | Second year |
| 77 | Steel work in M.S. C section/ angle iron/ I section / MS flat / MS Plates including cutting to required length welding & fixing the members to existing structure with suitable means as per the direction by the Engg. -in-Charge including spray/manual painting the same with two coats of ISI marked synthetic enamel paint of approved colour over one coat of red oxide metal primer etc. as per direction of engineer - in - charge. |
| 78 | First year |
| 79 | Second year |
| 80 | Complete overhauling and rewinding of 3 phase 415 volts, 50Hz, 13 HP/9.5 KW KSB make raw water sewage submersible pump motor set of including replacement of mechanical & oil seal, o-ring, motor oil, moisture sensor, replacement of defective bearing, coupling, impellers, shaft, bush and other necessory parts, new super enamel coated coper wire with heat varnishing, backing, fitting etc. as required to make the pump motors serviceable and in healthy condition and as per direction of Engineer-in-charge complete etc. as required. |
| 81 | 9.5 KW |
| 82 | (a) First year |
| 83 | (b) Second year |
| 84 | Providing and placing on terrace (at all floor levels) polyethylene water storage tank, IS : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank. |
| 85 | First year |
| 86 | Second year |
| 87 | Providing and placing on terrace (at all floor levels) polyethylene water storage chemical dosing tank, IS : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank. |
| 88 | First year |
| 89 | Second year |
| 90 | Complete overhauling and rewinding the following capacity defective motor suitable for 230 volts with necessary PVC insulated copper winding etc. complete as required including dismantling and reinstallation etc. to be used for water body fountain etc. complete as required. |
| 91 | 2.2 KW |
| 92 | (a) First year |
| 93 | (b) Second year |
| 94 | 1.5 KW |
| 95 | (a) First year |
| 96 | (b) Second year |
| 97 | 0.75 KW |
| 98 | (a) First year |
| 99 | (b) Second year |
| 100 | Replacement of defective bush of following capacity pump-motor set including dismantling and reinstallation etc. to be used for water body fountain etc. complete as required. |
| 101 | 2.2 KW |
| 102 | (a) First year |
| 103 | (b) Second year |
| 104 | 1.5 KW |
| 105 | (a) First year |
| 106 | (b) Second year |
| 107 | 0.75 KW |
| 108 | (a) First year |
| 109 | (b) Second year |