| 1 | Supply and fabrication of embeded parts consisting of Wall liner-3000X140X8mm-2nos,Wall liner-3000X100X8mm-4nos,Sill beam-1500mm 1/2 CUT MB 200-1nos,Side seal SS seat-3000X60X6mm-2nos,Sill beam SS seat-1400X60X6mm-1nos,1st stage embedments Ø16 Studs, bolts, nuts, washers etc.-10kgs with all accessories including machinery, fixtures, labour, cutting, alligning, welding, cleaning, finishing, including consumables, all complete as per direction of Engineer- in-charge.The cost is inclusive of contractor profit @7.5% and labour cess @1%. |
| 2 | Supply and Fabrication of vertical lift sliding Gate leaf consisting ofSkin plate-1400X1500X8mm-1nos,End V girder-1500X65X10-2nos,Hor. Girder-1380mm-ISA 65x65x6-3nos.diaphrgm-1450mm 50X8-4nos,Side seal mounting-1500X40X8-2nos,Side seal clamp plate-1500X35X8-2 nos,Pad base-80X30X25mm-4nos,Bronze pad-80X30X12-4nos,Btm. Seal (10mm thick)-1.4 m long,Btm. Seal clamp plate-1400X50X8-1nos,Ø25 Side Seal-1.5 m long,Lifting bracket-600X115X12-2nos,Lifting Pin 130mm Dia 30-1nos,C/s Screw, bolt/nut etc-10 kgs with all accessories including machinery, fixtures, consumables, labour, cutting, drilling & boring, alligning, welding, cleaning, finishing all complete as per direction of Engineer-in- charge.The cost is inclusive of contractor profit @7.5% and labour cess @1%. |
| 3 | Supply and Fabrication of Steel hoist bridge for single stem Nut type screw gear box hoist consisting ofBase plate 400X 200 X 8mm-4nosCI gear box base plate 400 X 300 X 16mm-1nosSupporting beam 2000 X ISMB 150 - 2nosAnchor bar 350 X Dia 20 mm -16nosChequered plate 1700X 400X 6mm-1noswith all accessories including machinery, fixtures, consumables, labour, cutting, alligning, welding, cleaning, finishing all completeas per direction of Engineer-in- charge.The cost is inclusive of contractor profit @7.5% and labour cess @1%. |
| 4 | Erection, positioning, alligning, fixing, trial and commissioning including unloading and shifting upto location of all componentsof 1st stage and 2nd stage Embedded parts (consistingof sill beam, wall liners, track plates etc),Vertical Gate leaf (complete assembly with fixing of bronze pad, rubber seals), Steel hoist bridge assembly (consisting of hoist platform, Screw rod, lifting gear box,supporting beams, base plates, anchor bolts etc) with all accessories including machinery, fixtures, labour, cutting, alligning, welding, cleaning, finishing total 564.99 kgs per gate for 05 nos gate including consumables all complete as per direction of Engineer in charge. The cost is inclusive of contractor profit @7.5% and labour cess @1%. |
| 5 | Painting cost of Embeded part (With one coat Zinc primer & 3 coats of Coal tar epoxy paint),Paintingof GateLeaf (With one coat Zinc primer & 3 coats of Coal tar epoxy paint) and Painting of Hoisting Platform (With one coat Zinc primer & 3 coats of Aluminium paint)as per direction of Engineer in charge.The cost is inclusive of contractor profit @7.5% and labour cess @1%. |
| 6 | Labour charges for vent cleaning,Helper 2 Nos for one day 2 Man/day,Construction of coffer dam by sand bag @ Rs30/- and dismantling after completion of work including cost of labour and sand bag 40 Nos,Pump with 10HP diesel engine for dewatering of entrapped water. 4 Hrs,2nd stage Concrete cutting-0.92 Cum and 2nd stageconcreting-0.63 cum as per direction of Engineer- in-charge..The cost is inclusive of contractor profit @7.5% and labour cess @1%. |
| 7 | Supply of following bought out materials per gate LTB-1 Bronze pad of size 80mm x 30mm x 12mm(including cost of material, machining & countersunk holes) 4 Nos, Bottom Seal( Plate75 x 10mm)-1.4mm- 1nos,Side Seal( Ф25-70 x 10mm)-1.5mm- 2nos,1st stage embedments, Ø16 Studs, bolts, nuts, washers etc.-20kg,Nut type Screw Gear box assembly suitably square threaded for 63mm dia screw rod -1 nos,Anchor bars-16nos,Lifting pin -1nos,Screw rod 63 mm Dia suitable square threaded to M62x9 including cost of material, straightening and machining. 1.7mm- 1nos,63 mm dia round plane Rod0.9mm- 1nos,Lubricant like grease & mobil-2nos,Gate Lifting Handle-1nos as per direction of Engineer in charge. The cost is inclusive of contractor profit @7.5% and labour cess @1%. |
| 8 | Transportation charges (Truck & Tractor) Steel material from SAIL stockyard to workshop and finished gate from workshop to work site (110 Km) with all bought out and erection material including cost of loading & unloading round trip.(Rs30.95/Km/10 tonne, Ref. Works Deptt. SR -2022)The cost is inclusive of contractor profit @7.5% and labour cess @1%. |