| 1 | M&L Galvanised 2 strand steel barbed wire 2.24 mm dia barbed with 2 mm dia barbs at 75 mm spacing and straining and fixing of any type of standard rails straining bolts , including securing or tying at crossing with provision of galvanised mild steel wire, stapleor steel pins etc as directed(each line wire to be measured) all as specified and directed |
| 2 | S&F anglefor posts and struts in fencing including cutting tops to shape as directed , drilling holes, notching for wore, etc, flat iron fillets (for securing wire mesh etc) including all necessary drilling, bolting or riveting etc and similar work conforming to Fe- 290 Gde E-165 all as specified and directed |
| 3 | Material and labour for two coats of synthetic enameled paint on steel and iron surfaces over one coat of red oxide primer on surfaces over 10 cm width or girth including preparation of new surfaces complete all as specified & directed. |
| 4 | M&L PCC 1:2:4 type C1 (20 mm graded crushed stone aggregate) as in coping and like work complete all as specified and directed |
| 5 | Taking down cementplaster on brick or stone walls, etc. including raking out joints, hacking for key, scrubbing down with water etc . |
| 6 | M&L for rendering 15 mm thick on fair faces of brick work or concrete sur-faces in cement mortar 1:4 using water proofing compound(WPCwill be measured and paid separately) |
| 7 | Supply only liquid water proofing compound. |
| 8 | M&L for prepration of newly plastered surface andappplying two coatsofcement base paintover priming plastered and other surfaces with alkali resistant priming paint complete all as specified including providing necessary scaffolding , safety precautions and other requisite arrangements all as per site requirement |
| 9 | M&L for preparationof old decorated surfaces of walls and applying one coats of cement base painton wall complete as specified and directed |
| 10 | M&Lformwork to sides of pillars, posts, struts, piers, columns andrough finish surface of concrete for square and rectangular all as specified and directed |
| 11 | M&L RCC (nominal mix) Type B-1 1:2:4 (20 mm graded aggregate) in columns, pillars, piers, posts and strutsall as specified and directed |
| 12 | Demolition of brick work or stone/boulder masonary, built in cement mortar including all quoins, arches, pillar etc but excluding ashlar dressed stone-work and precast concrete articles complete all as specified |
| 13 | S&F concertina coil with punched tape concertina 600 mm dia 10 mtr openable length having 50 nos round per 6 mtr length over wall with existing \"Y\" shaped angle iron tied with necessary bolts with angle iron and GI staples with existing barbed wire concertina coil of core with diameter 2.5 mm blade thickness 0.50 mm blade length 12 mm, wodth of blade 15 mm and spacing of blade 26 mm complete all as specified and directed by Engr-in-charge |
| 14 | S&F mild steel screw bolts (machine made) or square heads at one end and screwed the other with length of bolt 50mm and diameter of shank 11 to 15 mm. |
| 15 | Supply and fixing LED street light fitting 70 Watt 230 V AC outdoor type with high pressure die cast aluminum hosing and heat resistant complete with driver, lamp bracket with impact and corrosion resistant including thermal management in multiple optics complete with IP 65/66 protection complete. |
| 16 | M&L for G.I (medium grade, ISI ) pipe 40mm dia, 1.5 Mtr long medium grade, bend to shape for street light fittings bracket, with 2 pairs of MS clamps of suitable lengthof size 40 mm x 5 mm of MSflat iron with nuts, bolts & washer including applying two coats Synthetic enamel aluminium paint over a coat of red-oxide taking out old unserviceable ones, complete all as specified and as directed. |
| 17 | S&F weather proof junction box made of thermoplastic polycarbonate with gasket comply with -IP 66, dust and jet water proof of size 155x210x92 mm (with Knockouts for cable entry) including Terminals , for cable size upto 10 to 16 sqmm alongwith cable inletincluding a pairs of MS flat iron Clampof size 40mmx5mm with10mm nuts, bolts of suitable length with washer, suitable to fix in Steel tubular pole/PCC pole |
| 18 | S&F cable PVC insulated flexible type 1.5 sqmm x 3 core copper conductor cable, complete all as specified and as directed. |
| 19 | Material and labour for fixing steel tubular swaged poles complete with cast iron base plate, finial taper plug, bolts, nuts & screws as specified type 410 SP-31 (9 metres long) including applying two coats of black bituminous paint internally and externally upto planting depth and applying two coats of aluminium paint over a coat of red oxide primer, externally from top of coping including taking down old one complete all as specified and as directed. |
| 20 | Supply, Laying, commissioning and testing of UG LT cable XLPE insulated screened PVC bedded, galvanized steel strip armored, electric power cable (heavy duty) 1100 volts grade with stranded aluminium conductor of size 10 sqmm 2 core including connecting the cables at both ends by providing suitable size aluminium lugs & glands at the termination ends, complete all as specified and as directed. |
| 21 | Excavation in trenches inany type of soil not exceeding 1.5 mtr wide and n.exe 1.5 mtr depth in foundation of pole/ laying of under ground cable and including getting out of any type of soft/loose soil, complete all as specified and as directed. |
| 22 | Returning filling in including spreading, leveling ,and well ramming, in layers not exceeding 25 cm each layer of any kind of soil, complete all as specified and as directed. |
| 23 | Removing surplus excavated material from site not exceeding 50 mtrs from starting point and depositing where directed at level not exceeding 1.5 mtr above the starting point, complete all as specified and as directed. |
| 24 | M&L sand covering /cushioning for under ground cable protection in-trenches with clean dry sand unwashed including gently pruning around cables complete all as specified and as directed Note:-Punned thickness to be measured for payment. |
| 25 | Material and labour for burntbricks sub class \"B laid flat in trenches over sand cushioning for cable protection complete all as specified and as directed. |
| 26 | Material and labour for plain cement concrete 1:2:4 type B-2 (using 40mm graded stone aggregates) as in foundation filling and mass concrete of earthing etc complete all as specified and as directed. |