|
| 1 | Dismantling roofing including ridges, hips valleys and gutters etc., and stacking the material within 50 metres lead of: Asbestos Sheet |
| 2 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. |
| 3 | Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in- charge) 0.50 mm (+ 0.05 %) total coated thickness with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired by Engineer-in-charge. The sheet shall be fixed using self drilling /self tapping screws of size (5.5x 55 mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. |
| 4 | Providing and fixing precoated galvanised steel sheet roofing accessories 0.50 mm (+0.05 %) total coated thickness, Zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns using self drilling/ self tapping screws complete : Ridges plain (500 - 600mm) |
| 5 | Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete |
| 6 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer , over the plastered wall surface to prepare the surface even and smooth complete. |
| 7 | Distempering with 1st quality acrylic distemper (ready mixed) having VOC content less than 50 gms/litre, of approved manufacturer, of required shade and colour all complete, to achieve even shade and colour: New work ( Two or more coats) over over and including waterthinnable priming coat with cement primerhavingVOC content less than 50 gms/litre |
| 8 | Finishing wall with smooth exterior paint of required shed:( New work two or more coat applied @ 1.67 liters / 10 sqm over and including wall primer of exterior paint @.90 liter /10 sqm ) |
| 9 | Providing and applying two coats of synthetic enamel paint of approved colour to new /old structural steel work and wood work in buildings, including scaffolding if necessary,cleaning and preparing the surface (excluding primer coat) etc. complete. |
| 10 | Repairing of wooden false ciling by providing plywood/wooden sheet in any level & fixed it to main ceiling with connecting clip,screws, wooden bidding etc. complete as per direction of Engineer-In -Charge. |
| 11 | Repairs to plaster of thickness 12mm to 20mm in patches of area 2.5 sq. meters and under including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete including disposal of rubbish to the dumping ground within 50 metres lead:\"With cement mortar 1:4 (1 cement: 4 coarse sand). |