| 1 | Construction of C.C. road in village Sabua Block Charkhari, Construction of C.C. road in village Babedi Block Kabrai and Construction of Baratshala in village Kahara Block Kabrai Distt.-Mahoba |
| 2 | Construction of C.C. Road from Shri Ajay Pal Yadav House to towards Shri Mukundi Joshi House in village Sabua Block Charkhari Distt.-Mahoba |
| 3 | Earth work in excavation in foundation and Nali |
| 4 | Earth work in embankment by cartage of earth from 1.00km by tractor tralley including ramming dressing and watering complete |
| 5 | Stone dust filling in blanket coat includingsupply of necessary qty of sand ,ramming dressing ,watering complete |
| 6 | P.C.C. with 40 gaug G.S.B. with approved Coarse sand and cement in the porportion of 1:6:12 I/e supply of all material labour T&P etc. Required for propar complation of work . |
| 7 | M-150 brickwork in 1:4 cement and fine sand mortor including cost of material , labour, T&P complete |
| 8 | Providing & Laying of Polythene Sheet 125 micron thick before laying the c.c.road for making separation with base coat concrete and prevention of pumpingI/e supply of all material labour T&P. |
| 9 | P.C.C. with 20mm. Stone grit with approved Coarse sand and cement in the porportion of 1:1.5:3 I/e supply of all material labour T&P etc. Required for propar complation of work |
| 10 | Making expansion /construction joint and transverse or longitudinal contraction joint in interval of 3 mtr each in c.c.road slab by full depth form at header joint and one third depth saw cuts on other joint with cleaning and sealing with Asphalt I/e supply of all material labour T&P etc. |
| 11 | 12mm. Thick plaster work in 1:4 brick work minimum thickness not less then 10mm. With cement and Fine sand of 1.25 F.m. Mortor. |
| 12 | RCC work in 1:1.5:3 cement c sand and 20mm stone grit in patiya /Slab |
| 13 | M.S. work in RCC |
| 14 | Fixing of sign board & photography |
| 15 | Construction of C.C. road from Ram Swaroop House to towards Maikasur in village Babedi Block Kabrai Distt.-Mahoba |
| 16 | Earth work in excavation in foundation and Nali |
| 17 | Earth work in embankment by cartage of earth from 1.00km by tractor tralley including ramming dressing and watering complete |
| 18 | Stone dust filling in blanket coat includingsupply of necessary qty of sand ,ramming dressing ,watering complete |
| 19 | P.C.C. with 40 gaug G.S.B. with approved Coarse sand and cement in the porportion of 1:6:12 I/e supply of all material labour T&P etc. Required for propar complation of work . |
| 20 | M-150 brickwork in 1:4 cement and fine sand mortor including cost of material , labour, T&P complete |
| 21 | Providing & Laying of Polythene Sheet 125 micron thick before laying the c.c.road for making separation with base coat concrete and prevention of pumpingI/e supply of all material labour T&P. |
| 22 | P.C.C. with 20mm. Stone grit with approved Coarse sand and cement in the porportion of 1:1.5:3 I/e supply of all material labour T&P etc. Required for propar complation of work |
| 23 | Making expansion /construction joint and transverse or longitudinal contraction joint in interval of 3 mtr each in c.c.road slab by full depth form at header joint and one third depth saw cuts on other joint with cleaning and sealing with Asphalt I/e supply of all material labour T&P etc. |
| 24 | 12mm. Thick plaster work in 1:4 brick work minimum thickness not less then 10mm. With cement and Fine sand of 1.25 F.m. Mortor. |
| 25 | RCC work in 1:1.5:3 cement c sand and 20mm stone grit in patiya /Slab |
| 26 | M.S. work in RCC |
| 27 | Fixing of sign board & photography |
| 28 | Construction of Baratshala in village Kahara Block Kabrai Distt.-Mahoba |
| 29 | Boring of 25cm dia piles of double under reamed of 50cm dia of bulb and 3.50 meter depth in B.C. Soil with hand operated auger machine |
| 30 | R.C.C . Work in cement coarse sand and 20mm gauge stone gride in proportion 1:1.5:3 in piles grade beam excluding supply of reinforcement and also including supply of all material labour T&P centeringand shuttering etc. |
| 31 | R.C.C . Work in cement coarse sand and 20mm gauge stone gride in proportion 1:1.5:3 in columns excluding supply of reinforcement and also including supply of all material labour T&P centeringand shuttering etc. |
| 32 | M-150 brickwork in 1:6 cement and fine sand mortor including cost of material , labour, T&P complete |
| 33 | 40mm thick D.P.C. in 1:2:4 cement C. sandand 12.5mm nominal size stone grit and waterproofing material complete DSR 4.10 |
| 34 | M-150 brickwork in 1:6 cement and fine sand mortor including cost of material , labour, T&P complete in super structure(S.I. No 303+309+310) |
| 35 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15\" landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 11.53 (1 cement 1.5 coarse sand(zone-III) derived from natural sources 3 graded stone aggregate 20 mm nominal size derived from natural sources) DSR 5.3 |
| 36 | M.S. Work in R.C.C. Incluing supply of steel its wastage and hooks and authorised overlap As per DSR Code No 5.22A .1 |
| 37 | S/F M.S Fan box with 12mm Ms bar |
| 38 | Earth work in filling by cartage of earth from 1.00km by tractor trolly. |
| 39 | E/W in Excavation DSR 2.1 |
| 40 | Cartage 1.00 Km.(217.55x0.639)= 139.01 (DSR Page 83 Cartage of material) |
| 41 | 12mm thick plaster work in 1:4 cement and fine sand mortor DSR 13.1.1 |
| 42 | sand filling under floor DSR 2.27 |
| 43 | Laying of PCC in 1:4:8 DSR 4.1.8 |
| 44 | 4cm thick CC floor in 1:1.5:3 cement c sand and 20mm stone grit in panells finished by 3mm floating coat of neat cement. |
| 45 | P/laying 8to 10mm thick ivory or light shad vitryfied tiles of 600mm x 600mm size in flooring laid with 1:3 cement sand mortor finishing with cement slurry pigment grouting and polishing complete DSR Code No 11.41.2 |
| 46 | P/applying white cemnent based putty of avg. thickness 1mm of appd. Brand over the plastered wall surface to prepare to surface even and smooth DSR 13.80 |
| 47 | finishing wall with tex tured exterior paint of required shade ( two or more coad applied ) @3.28 lt /10sqm over and including priming coat at the @2.20kg per10sqm DSR 13.45.1 |
| 48 | S/F of MS angle iron 40x40x6mm chaukhatD DSR 10.1 |
| 49 | S/F of M.S. grill in window frame |
| 50 | S/f of 35mm thick Sitapur com. Qualityply wood shutters |
| 51 | S/f of oxidise iron fitting |
| 52 | Painting or varnishing three coat over one priming coat on newly metal surface DSR 13.48.3 |
| 53 | Providing and fixing glass strips in joints of terrazo/ cement concrete floors.11.13.1 40 mm wide and 4 mm thick |
| 54 | Rough cost plaster with 1:3 cement and c sand mortor over slab as per Item No 583+595 |
| 55 | site clearence before and after completion the work |
| 56 | imformation board + photography |
| 57 | GST Extra as per applicable |