| 1 | Providing and applying tack coat using hot straight run bitumen ofgrade VG - 10, including heating the bitumen, spraying the bitumenwith mechanically operated spray unit fitted on bitumen boiler,cleaning and preparing the existing road surface as perspecifications : |
| 2 | On bituminous surface @ 0.50 Kg / sqm |
| 3 | Providing and laying bituminous macadam using crushed stone aggregates of specified grading premixed with bituminous binder, transported to site by tippers, laid over a previously prepared surface with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density, complete as per specificatons and directions of Engineer-in-Charge. |
| 4 | 50 to 100 mm average compacted thickness with bitumen of grade VG-30 @ 3.50% (percentage by weight of total mix) prepared in Hot Mix Plant of 40-60 TPH capacity. |
| 5 | Providing and laying Bituminous concrete using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete and as per directions of Engineer-in-Charge. |
| 6 | 40/50 mm compacted thickness with bitumen of grade VG-30 @ 5.5% (percentage by weight of total mix) and cement @ 3% and waste plastic additive @8% (percentage by weight of bitumen) prepared in Hot Mix Plant of 40-60 TPH capacity. |
| 7 | Providing and applying 2.5 mm thick road marking strips (retro- reflective) of specified shade/ colour using hot thermoplastic material by fully/ semi automatic thermoplastic paint applicator machine fitted with profile shoe, glass beads dispenser, propane tank heater and profile shoe heater, driven by experienced operator on road surface including cost of material, labour, T&P, cleaning the road surface of all dirt, seals, oil, grease and foreign material etc. complete as per direction of Engineer-in-charge and accordance with applicable specifications. |
| 8 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. |
| 9 | All kinds of soil |
| 10 | Providingandlayinginpositioncementconcreteof specified grade excluding the cost of centering and shuttering - All work up to plinth level : |
| 11 | 1:3:6 (1Cement : 3 coarse sand (zone-Ill) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 12 | 1:2:4 (1cement : 2 coarse sand (zone-Ill) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 13 | Centering and shuttering including strutting, propping etc. and removal of form for |
| 14 | Foundations,footings,basesof columns,etc.formass concrete |
| 15 | Disposal ofearth by mechanical transport including loading, unloadingetc. completefor an average lead of 10.00Km |
| 16 | Total of A(Sum of total amount) |
| 17 | 05 Year Maintenance Provision |
| 18 | For 1stYear 0.25% ofRs.2873785.20 |
| 19 | For 2nd Year 1.00% ofRs.2873785.20 |
| 20 | For 3rd Year 1.50% of Rs.2873785.20 |
| 21 | For 4th Year 2.00% ofRs.2873785.20 |
| 22 | For 5th Year 2.75% of Rs.2873785.20 |