Sinking Resinking And Maintenance Of Tubewell Of All Sansad Of Barasat Gp , Sinking Resinking And Maintenance Of Tubewell Of All Sansad , Taking Out 40Mm. Dia.Tube-Well Pipe At Site (Upto 100 Ft.). , Taking Out 40Mm. Dia.Tube-Well Pipe At Site (From 101 Ft. To 200 Ft.). , Taking Out 40Mm. Dia.Tube-Well Pipe At Site (From 201 Ft. To Above). , Supplying,Fitting And Fixing Plastic Filter (9 Ft Long) Of 40Mm.Dia At Site , Supplying,Fitting And Fixing Filter Cap Of 40Mm.Dia At Site , Supplying,Fitting And Fixing Tata(M) Of 40Mm.Dia At Site , Supplying,Fitting And Fixing P.V.C.Pipe Of 40Mm.Dia At Site (Ordinary) , Supplying,Fitting And Fixing P.V.C.Pipe Of 40Mm.Dia At Site (I.S.I. Mark) , Cutting Thread Of G.I.Pipe Of 40Mm.Dia At Site , Supplying,Fitting And Fixing Iron Socket Of 40Mm.Dia At Site , Supplying,Fitting And Fixing Nipple Pipe(G.I.) Of 40Mm.Dia (4 Ft Long) At Site. , Supplying,Fitting And Fixing Plastic Washer Ofat Site , Supplying,Fitting And Fixing Dhapa Ofat Site , Supplying,Fitting And Fixing Full Pump Body(Populer-6Nos,Maya Etc.) Of 40Mm.Dia At Site , Supplying,Fitting And Fixing Plunjar For 40Mm.Dia Tube-Well At Site , Supplying,Fitting And Fixing Handle Nuts & Bolts At Site. , Supplying,Fitting And Fixing Base Nuts & Bolts At Site. , Supplying,Fitting And Fixing Plunjer Nuts & Bolts At Site. , Supplying,Fitting And Fixing Head Nuts & Bolts At Site. , Supplying,Fitting And Fixing Clamp Set For 40 Mm. Dia. Tube-Well At Site , Supplying,Fitting And Fixing Base Plate For 40 Mm. Dia. Tube-Well At Site. , Supplying,Fitting And Fixing Wet For 40 Mm. Dia. Tube-Well At Site. , Supplying,Fitting And Fixing Handel For 40 Mm. Dia. Tube-Well At Site. , Supplying,Fitting And Fixing Pump Body (Barrel) For 40 Mm. Dia. Tube-Well At Site. , Supplying,Fitting And Fixing Piston Rod For 40 Mm. Dia. Tube-Well At Site. , Supplying,Fitting And Fixing Head Cover For 40 Mm. Dia. Tube-Well At Site. , Supplying Of Bleaching Powder At Site. , Supplying,Fitting And Fixing Point For 40 Mm. Dia. Tube-Well At Site. , Boring Of G.I./Pvc Pipe Of 40Mm Dia.At Site (Upto 100 Ft.). , Boring Of G.I./Pvc Pipe Of 40Mm Dia.At Site (From 101 Ft. To 200 Ft.). , Boring Of G.I./Pvc Pipe Of 40Mm Dia.At Site (From 201 Ft. To Above). , Washing And Developing Tube Well With Air Compressor Pump And Enginefor 8 (Eight) Hours Continuous Pumping Per Day With Necessary Arrangements For Testing , Mark-Ii Bearing , Mark-Ii Shaft , Mark-Ii Chain , Mark-Ii Cylinder , Mark-Ii Cylinder Rod , Boring Of Gi/Pvc Pipe 100 Mm Dia , Boring Of Gi/Pvc Pipe 150Mm Dia , Supply Of 150Mm Dia Pvc Pipe (Approved Brand) , Supply Of 150Mm Dia Gipipe (Tata Make) , Supply,Fitting,Fixing Of Cc Ring Including Cover ( 750Dia , 250 Mm Height ) , Supply Of 20Mm Down Stonechips , Construction Of Platform (Bw,Pcc,Plaster,Net Cement Comp.) 5’X4’ , Sff Of1000 Litr Pvc Water Storage Tank(Isi Brand) , Sff Of1.5 Inch Pvc Pipe (Supreme Or Same) , Sff Of1 Inch Pvc Pipe (Supreme Or Same) , Sff Of ½ Inch Pvc Pipe (Supreme Or Same) , Sff Of 1Hp Pump ( Isi Approved Brand) , Sff Of 0.5 Hp Pump ( Isi Approved Brand) , Repairing Chocked Up Tube Well By Cleaning And Washing With Chemical Including Pumping With Powerful Pump. (I) 40 Mm To 50 Mm Dia. Tube Well Upto 100 Metre Deep