| 1 | PART-A |
| 2 | Design, Detailed Engineering, Manufacturing/ Procurment of equipment, packing, Transportation, loading,unloading & SITC of following MRL & Gear less electrical driven Passenger cum Stretcher Lifts as per detailed specification. |
| 3 | G+3 Building 15 Passenger/ Stretcher (1020 kg) Lift |
| 4 | Major Civil work for LIft structure including supply and erection of MS frame structure min. 3.00 mm thick 150mm x 150mm MS square pipe structurally stable structure including cross bracing for lift shaft covered with ACP sheet of approved color, texture and finish (min. 3.0 mm thick) with 1.5 inches pipe selection including bridging work with existing building including civil works, railing (inside structure), anti skid tile(inside structure) on the floor. The pit shall be made of RCC foundation lift structure, completly water proof, side wall and other related civil works shall be done as per approved drawings. |
| 5 | G+3 Building 15Passenger Strature Lift |
| 6 | Providing and laying rectified Glazed Ceramic floor tiles of size 300x300mm or more (thickness to be specified by the manufacturer), of 1stquality conforming to IS : 15622, of approved make, in colours White,Ivory, Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1:4(1 Cement: 4 Coarse sand), jointing with grey cement slurry @ 3.3 kg/sqm including grouting the joints with white cement and matchingpigments etc., complete. |
| 7 | Providing and laying rectified Glazed Ceramic floor tiles of size 300x300mm or more (thickness to be specified by the manufacturer), of 1stquality conforming to IS : 15622, of approved make, in all colours, shades,except White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick CementMortar 1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry@ 3.3 kg/ sqm including pointing the joints with white cement andmatching pigments etc., complete. |
| 8 | 12 mm cement plaster of mix :1:6 (1 cement: 6 fine sand) |
| 9 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcementwith 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III): 3 graded stone aggregate 20 mm nominal size). |
| 10 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. |
| 11 | Demolishing brick work in mortar manually/ by mechanical means includingstacking of serviceable material and disposal of unserviceable materialwithin 50 metres lead as per direction of Engineer-in-charge. |
| 12 | Dismantling doors, windows and clerestory windows (steel or wood)shutter including chowkhats, architrave, holdfasts etc. complete andstacking within 50 metres lead. |
| 13 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within50 metres lead as per direction of Engineer - in- charge. |
| 14 | Painting with synthetic enamel paint of approved brand andmanufacture to give an even shade Two or more coats on new work. |
| 15 | Providing and applying white cement based putty of average thickness1 mm, of approved brand and manufacturer, over the plastered wallsurface to prepare the surface even and smooth complete |
| 16 | Finishing walls with water proofing cement paint of required shade, New work (Two or more coats applied @ 3.84 kg/10 sqm) |
| 17 | Fixing chowkhat in existing opening in brick/ RCC wall with dashfasteners/Chemical fasteners of appropriate size (3 nos on eachvertical member of door chowkhat and 2 nos on each vertical memberof window chowkhats), including Cost of dash fasteners/ chemical fastener. |
| 18 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 19 | Earth work in all kind of soil excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. |
| 20 | Earthing with G.I. earth plate 600 mm X 600 mm X 6 mm thick including accessories, and providing masonry enclosure with cover plate having locking arrangement and watering pipe of 2.7 metre long etc. with charcoal/ coke and salt as required. |
| 21 | Providing and fixing 25 mm X 5 mm G.I. strip on surface or in recess for connections etc. as required. |
| 22 | SITC of 24\",2000 CFM, Head Stainless steel and base polycarbonate sheet roof top air turbo ventilator complete including cutting of roof sheet and water proof sealing etc. in all respect. |
| 23 | SITC LED sinage laser engraved double side display alongwith power backup through Li-Ion 11.1V/600mA Dcas well as 230V ACBattery suitable for Hanging/Wall/side mountingfor proper indication of Lift /Fire exit etc. complete with all connectionas required . |
| 24 | S/F ACP Sheet 3.00 mm thicknesscomplete with MS square pipe raftingincluding welding , fabrication etc as required for proper completion of the work. |
| 25 | PART-B |
| 26 | CAMC of G+3 15 Passenger Stretcher Lift for trouble free operation for 05 Years (Year to year basis) after expiry of warranty period/ DLP. |
| 27 | For First Year |
| 28 | For Second Year |
| 29 | For Third Year |
| 30 | For Fourth Year |
| 31 | For Fifth Year |