| 1 | HGS SS.20.B. Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS.20B(PWD Pg.No :29 - W-0061) |
| 2 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand,silt or other loose soil,wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may bedirectedexceptinhardrockrequiring blastinginclusive of shoring shuttering, and baling out water wherever necessary refillingthe sides of foundation withexcavated soilotherthan sand in layers of 15cm thick well rammed andcompleted depositing the surplus excavated soil within the compound inplaces shown by the departmental officers with intiallead and lifts and cleaning and levelling the site etc.,complete SS.20.B |
| 3 | Plain Cement concrete 1:4:8 (one cement, four sand,eight aggregate) using 40mm gauge handbroken granitestone jelly for foundation including dewatering if foundnecessary and laid in layers of not more than 15cmthick and compacted,etc., complete complying withstandard specfication. |
| 4 | Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - 10 m 2 (P & D)Data 38 |
| 5 | Road Side Wall |
| 6 | Plain Cement concrete 1:2:4 (one cement,Threesand &Six course aggregate) using 20mm gauge hand broken granite stones for all RCCitemsof works excluding centering shuttering and cost of reinforcement including curing etc.,complete and alsoincluding fixingfan clamps and fixtures in RCCworkswherever necessary as directed by departmentalofficer etc., complete. |
| 7 | Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 250mm thick specification including premixing the materials with water at OMC in mechnanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,complete as per clause 406 of MORTH |
| 8 | Supplying and laying Rubberised interlocking Paver blockM40 grade Providing and laying of63mmthick high strength type conforming IS 15658-2006 of rubberized interlocking paver lock in size of minimum compressive strength of 40N/mm2 in uniform shape of approved make to be laid in flurring bone pattern with sand cushion below the uniform shap of approvednon skitting surface in the top and the rate including levelling the base preparation ofpavers as sub base, sand cushion 100mm thick layingout of pavement cut the pieces to fix the edge vibring the pavers,sweeping tranporting loading unloading of laying paver block as per standard specification,. |