| 1 | Excavation in Earthwork (by any means) in Mar, kabar, Ranker and Kankar mixed soil in digging including lead up to 30 M and lift upto 1.5M including dressing making profile and manual compaction but excluding mechanical compation. U.P.I.D. S.I no. 4.12 |
| 2 | Excavation in Earthwork (by any means) in Mar, kabar, Ranker and Kankar mixed soil in digging including lead up to 30 M and lift (beyond 3.00 mtr lift) including dressing making profile and manual compaction but excluding mechanical compation. U.P.I.D. S.I no. 4.12 |
| 3 | Excavation in Earthwork (by any means)in Mar, kabar, Ranker and Kankar Removal of Slush (Excluding cost of Dewatring) including lead up to 30 M and lift upto 1.5M including dressing making profile and manual compaction but excluding mechanical compation. U.P.I.D. S.I no. 4.17 |
| 4 | Excavation in Earthwork (by any means) in Mar, kabar, Ranker and Kankar Saturated soil in digging including lead up to 30 M and lift (beyond 3.00 mtr lift) including dressing making profile and manual compaction but excluding mechanical compation. U.P.I.D. S.I no. 4.17 |
| 5 | Excavation in Earthwork (by any means) in Mar, kabar, Ranker and Kankar Removal of Slush (Excluding cost of Dewatring) including lead up to 30 M and lift upto 1.5M including dressing making profile and manual compaction but excluding mechanical compation. U.P.I.D. S.I no. 4.20 |
| 6 | Earth work in foundation of wall peirs, abutment etc with disposal with in 30 mtr lead and lift1.50 mtr in mar kabar rankar soil . I.D.S N0. 4.14 (b) |
| 7 | Sand filling for foundation of Inlet,,Ramp, |
| 8 | C.C.in 1:3:6 Cement, Sand and 25 to 50 mm Stone ballast including the cost of materials labours and etc. required for proper completion of work.(Inlet,Outlet,Ramp,.) |
| 9 | R.C.R Stone massonery work in 1:4 Cement Sand Mortar including the cost of material, labour etc. required for proper completion of work.(Inlet,Ramp,.) |
| 10 | Supply& Fixing of 900mm NP3 Hume Pipe With Collor (Inlet,Outlet work) |
| 11 | C.C.in 1:2:4 Cement, Sand and 10 to 20 mm gritincluding the cost of materials labours and etc.to required for proper completion of work.(Inlet,Outlet,Ramp,Ghat.) |
| 12 | Plaster work in 1:3 c/s mortar in masonary work |
| 13 | Dry stone boulder filling in D/S bed on Nala after floor. (Inlet,Outlet.) |
| 14 | Watering/Dewatering during the work by 8 HPDiesel pumping set. |
| 15 | Supply & fixing ofsign Board |