| 1 | VELLORE DISTRICTCONSTRUCTION BUS SHELTER @ MBC PUDUMANI IN VARATHALAMPATTU PANCHAYAT ANAICUT BLOCK SFC (DP) 2025-26 PACKAGE NO 05 |
| 2 | Earthwork excavation for foundation (for narrow excavation) to full depth as per designed in all soils and sub soils except soft disintegrated rock not requiring blasting and ces shown by thean initial lead of 10m and initial lift of 2m and clearing and leveling the site etc. complete complying with standard specification. |
| 3 | Supplying and filling of conveyed earth with a lead of 1Km for basement filling including cost and coveyance of all materials to work site and all labour charges etc. |
| 4 | Cement concrete 1:4:8 mix ( one cement four sand and eight aggregate)using 40mm gauge handbroken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying withstandard specfication |
| 5 | Brick work in cm 1:5 mix(one cement and five sand )using country bricks ground maded of size 23 x 11 x 7 cm includingcuring,finishing and cost & Conveyance of all materials etc., complete. |
| 6 | RCC 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc. |
| 7 | Supplying and erecting Centering and Shuttering for soffits including necessary supports and strutting up to 3 M height for10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laced at not more than 75 cm cwith the standard specification.(Payment for centering shall be given after the concrete is laid). |
| 8 | Footing, Plinth Beam, etc. |
| 9 | Above GL |
| 10 | Supplying fabricating and placing in position of ribbed steel rods for reinforcement to all RCC works as per the design given including cost ofsteel and binding wire also in all floors etc., complete |
| 11 | Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 10mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. |
| 12 | Plastering with cement mortar 1;3, using 10mm thick in all floors etc.,complete. |
| 13 | Providing weathering course with best quality of brick Jelly 20mm gauge in pure slaked lime (no sand to be added) over roof slab,the proportion of brick jelly to lime being \"32 to 12.5 well beated with wooden beaters for giving required slope and thickness as directed by the departmental officers.etc. |
| 14 | providing floor finshing Granite mixusingCM 1:3: 20mm thickand granit stone cutting with laying including all cost and all laour Charge etc… |
| 15 | Finishing top roof mix one course machine pressed tiles of size 20 cm x 20 cm x 2 cm approved qty with,CM.1:312 mm thick mixed with WPC at 2% by weight of cement used and top pointed with the same mortar etc |
| 16 | Painting two coats with ready mixed Exterior Emulsion paint of approved qualityand colour over a priming coat, including through scrapping,clean removel of dirt etc complete . |
| 17 | ELECTRIFICATION |
| 18 | Light Point & Fanpoint |
| 19 | Plug Point |
| 20 | Gi pipe |
| 21 | WT bulk head fitting |
| 22 | AC ceiling fan |
| 23 | Supply and fixing of single box type4\" 40 W flu fitting |
| 24 | Supply and fixing of 16 Amps DPIC Switch of 500 V |
| 25 | Supply and fixing of Meter Board Three Phase |
| 26 | Supply and delivery of MS Kiosk of size 0.75m x 0.45m x 0.75m |
| 27 | Provision for Name BoardCharges |
| 28 | GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |