| 1 | Dismantling brick on edaging (Kharanja) work including stacking of dismantled materials as directed by the Engineer-in-charge within a distance of 60 metre (200 feet) |
| 2 | Dismantling brick work or stone work including stacking of dismantled materials as directed by the Engineer-in-charge within a distance of 60 metre (200 feet) |
| 3 | E/W in filling with 8th cartage including of Royallity all work complete |
| 4 | Construction of granular sub baseby providing coarse graded mixing in a mechanical mix plant at OMC carriage of mixed materail to worksite spreading in uniform iayers with motor gradar on orepared surface and compacting with vivratory power roller achiev tha desired density ets all complete work |
| 5 | Concrete with 4cm. Gauage brick ballast, fine sand of 1.25 F.M. and cement, in proportion of 12:6:1 in foundation and under floors including supplly of all materials, labour Tools & plants etc. required for proper completion of the work. |
| 6 | Cement Concete with 20MM Guage stone grit coarse sand and cement in protorition 4:2:1 I/C S/O all Materials Labour and T & P etc. as per |
| 7 | M-150 Brick work in one part cement and four coarse sand foundation including supply of all material, labour tools & plant etc. S.I No. 305(a) |
| 8 | 12MM Thick cement plaster with cement & coarse sand in 1:4 over brick work minimum thickness not to be less than 1cm including supply of all material labour, tools & plant etc. S.I No- 584 (New Item) |
| 9 | Cement Concrete with 20MM Gauage stone grit coarse sand and cement in protorition 4:2:1 I/C S/O all Materials Labour and T&P etc as per SI No. 279(a) |
| 10 | Supply and fixing of 80 mm thick interlocking cement tiles with the cost of tiles including supply & spreading of sand to required template as necessary required for proper completion of work |
| 11 | Laying of Interlocking tiles of 60 to 80 mm thick including levelling and dressing of surface up to required level and slopes filling joints with local sand including cost of material, labour T&P etc required for proper completion of the work as directed by Engineer in charge |
| 12 | S/F glazed tiels in flooring or in skirting or dado laid with 1:3 cement and app. c/sand mortar finished with white cement slurry jointing and polishing comp. i/c supply of all material labour and t&p complete as per si no 628 |
| 13 | Supply and fixing 6 mm. (¼\"\") China white glazed tiles in flooring or in skirting or dado laid with 1:3 Cement and approved coarse sand mortar finished with white cement slurry. Jointing and polishing complete, including supply of all materials, labour. tools & plants etc. |
| 14 | R.C.C Work with cement approved coarse sand & 20 mm gauage approved stone grit in proportions of 1:2:4 in Slabs including necessary centeringh and shuttering etc supply of all materials, labour Tools & plants etc. required for proper completion of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra |
| 15 | M.S (for steel or plain) in plain work such as RCC or R.B. work including bending for proper shape and including supply of steel & its wastage, bends, hoocks and authorised overlaping shall be measured and including cost of binding wire |
| 16 | M.S.or Iron work of heavvy sizes such as trusses, built up gates, record tracks, roof work, Gates etc. including rivetting or welding where necessary item No. 502(A) |
| 17 | Disposal of Malwa loading &unloading of work complete |
| 18 | G.S.T |