| 1 | Annexure -A ( Works ) |
| 2 | Earthing of distribution transformer including digging of pit of size 2.5 Mtr depth and make hole of size 150 mm. Placing of earthing electrode (to be supplied by contractor), connecting the same with G.I.Strip (to be supplied by contractor) of size 35x6 mm for a minimum length 6 m. treatment of soil with highly condctive substance as per IS 30343 complete in all respect, result of earthing resistance to be recroded in M.B. before and after installation of earthing. Theearth resistance after earthing should be less than 1 Ohm. |
| 3 | Earthing of support with M.S. Earth rod of 2.5 meter long by hammaring of M.S. Rod to proper depth and connecting the earth electrode with the help of G.I. wire as per construction manual. |
| 4 | Fabrication of MS Channel angle iron etc in required sizes with drilling of holes upto good finish for top channel, bracing and special type bracket etc. as per RESPO schedule and local approved drawing. |
| 5 | Excavation of earth for stay pit of size 0.6x0.6x1.2 mtr in all types of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work |
| 6 | Fixing, tightening and nozzling of stay with pole and stay rod on required tension as per drawing/manual in LT line. |
| 7 | Grouting of Stay in size 0.6x0.6x0.3 in CC ratio 1:4:8 (1 cement :4 graded stone 20mm nominal size: 8 coarse sand ) block including cost of Cement, sand andstone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESSPO Manual. |
| 8 | Excavation of earth for pole pit of size 0.9x0.6x1/6 of full length of pole for erection of pole in all types of soil including proper dressing of sides and ramming of bottom including etting out the excavated soil and disposal of surplus excavated soil as directed complete work. |
| 9 | Erection of PCC single support pole in proper level and alignment along with fixing of all accessories like top channel & clamps as per RESPO manual. |
| 10 | Erection of PCC double support pole in proper level and alignment along with fixing of all accessories like top channel, X bracings & clamps as per RESPO manual. |
| 11 | Dismantling of Transformers from double pole /plinth including openingof all connections, circuts & earthing strip etc. (25 KVA). |
| 12 | Dismantling of Transformers from double pole /plinth including openingof all connections, circuts & earthing strip etc. (63 KVA). |
| 13 | Dismantling of Transformers from double pole /plinth including openingof all connections, circuts & earthing strip etc. (100 KVA). |
| 14 | Excavation of earth of size 2.1x2.1x1.2 meter for DTR Plinth. |
| 15 | Brick work in 1:4 ratio of DTR Plinth. |
| 16 | RCC Work of 1:2:4 ratio 15 cm thickness of DTR Plinth. |
| 17 | Cement Plaster on side walls in 1:4 ratio on DTR Plinth. |
| 18 | Erection, providing and fixing of wire mesh of size 50x35 mmaround plinth and toe wall duly welded with frame of M.S angle iron 35 x35x6 mm and strip of size 35x6 mm in mid of each side along with wire mesh (width of wire mesh 1.5 meter ) with the heightof 0.5 meter above the plinth and 2 meter above the toe wall with 1 No. gateand locking arrangment in the toe wall size including grouting of 6 Nos. legs in the ratio inblock of size 0.25x0.25x0.45 meter including gravlling of shingle of size 20 to 40 mm and completepainting of wire mesh with aluminium paint with two coat (Including the cost of cement and all material). |
| 19 | Installation/ mounting of new 100 KVA Tranformer on pole structure and fixing of channel / angle etc. and making all connections ofHT and LT side and its complete commissioning. |
| 20 | Installation/ mounting of new 63 KVA Tranformer on pole structure and fixing of channel / angle etc. and making all connections of HT and LT side and its complete commissioning. |
| 21 | Installation/ mounting of new 250 KVA Tranformer on plinth structure and fixing of channel / angle etc. and making all connections of HT and LT side and its complete commissioning. |
| 22 | Mounting & Fixing of Fuse sets on double pole structures including making of connections complete work |
| 23 | Laying, Spreading, Stringing and sagging of 11 KV / 33 KV line in 3 phase (3 Phase 3 wire) of ACSR Rabbit as phase wire with G.I. earth wire complete including fixing of all accessories in 3 Nos. conductor in parallel with binding and jumpering as per profile and sagging chart. |
| 24 | Route cleareance by cutting of tree branches / proning, loping and chopping of trees for L.T., 11 & 33 KV line. |
| 25 | Laying, Sagging & binding of AB cable of size 120 sqmm.(Only for cable, additional provisions to be made for matching accessories installation, case of any network modification i.e additionalpole etc. and for actual connection,disonnection as per site condition. |
| 26 | Jointing and fixing of cable jointing kit indoor/outdoor 11 KV XLPEheat shrinkable cable boxes. |
| 27 | Cartage of PCC Poles from store centre to construction site with loading, unloading at both points and proper stacking.(Distance 51- 70 Km) |
| 28 | Cartage of other material (other than poles) by vehicle from Store Center to nearest construction site Store including loading and unloading at both ends(distance 51-70 Km) |
| 29 | Cartage of the 16/25 KVA transformer from store center to construction site with loading and unloading at both points.(Distance 0-20Km) |
| 30 | Cartage of the 63 KVA transformer from store center to construction site with loading and unloading at both points.(Distance 0-20 Km ) |
| 31 | Cartage of the 63 KVA transformer from store center to construction site with loading and unloading at both points.(Distance 51-70 Km) |
| 32 | Cartage of the 100 KVA transformer from store center to construction site with loading and unloading at both points.(Distance 0-20 K m) |
| 33 | Cartage of the 100 KVA transformer from store center to construction site with loading and unloading at both points.(Distance 51-70 Km) |
| 34 | Cartage of the 250 KVA transformer from store center to construction site with loading and unloading at both points.(Distance 51-70 Km) |
| 35 | Headload cartage of PCC Pole from road to site (distance 0-1 Km) |
| 36 | Head load cartage of small material (distance 0-1 Km) |
| 37 | Headload cartage of 63 KVA transformer from road to site(distance 0-1 Km) |
| 38 | Headload cartage of 100 KVA transformer from road to site(distance 0-1 Km) |
| 39 | Headload cartage of 250 KVA transformer from road to site(distance 0-1 Km) |
| 40 | Road Cutting with the help of JCB/Poklandand repairing of road after work as per specification of PWD. |
| 41 | Laying and Fixing Insulated Cable LT XLPE Alu. Cond. Power cable |
| 42 | Laying and Stringing of HT XLPE Cable with the help of appropriate size ofconductor/Steel wire (conductor and steel wire Should bear the load of cable having 5% sag ) including supply of MS clamp and insulated clamp to support cable on support wire and Pole. |
| 43 | Annexure - B (Supply)(As per UPCL Norms) |
| 44 | Supply of Cable Holding Clamp with N&B |
| 45 | Supply of LT Bare N.Conn.PG. Clamp L-L 120-120 Sq.mm |
| 46 | Supply of X Arm Clamp for PCC Pole with N&B |
| 47 | Supply of Suspension Clamp Eye Hook LT ABC Cable |
| 48 | Supply of Suspension Clamp with J Hook |
| 49 | Supply of Double Pole Clamps with N&B for PCC Pole. |
| 50 | Supply of Stay Clamp for PCC Pole |
| 51 | Supply of Dead End Clamp with I Hook |
| 52 | Supply of Stay Insulator 75x90 MM |
| 53 | Supply of Nut & Bolts off size |
| 54 | Supply of MS Clamp with N&B for Suspension Clamp |
| 55 | Supply of MS Clamp with N&B for PCC Dead End Clamp |
| 56 | Supply of 11 KV XLPE Cable 3x95 Sq.MM |
| 57 | Supply of 11 KV HS Cable J/Kit XLPE 3x95 mm O/D Type. |
| 58 | Supply of Al. Crimping Type Lugs 120 Sq.MM |
| 59 | Supply of Al. Crimping Type Lugs 400 Sq.MM |
| 60 | Supply of Al. Strip size 40x5 mm with 2 nos. holes. |